My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
13-14386/14387
Zephyrhills
>
Building Department
>
Permits
>
2013
>
13-14386/14387
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2014 10:55:48 AM
Creation date
4/23/2014 10:55:46 AM
Metadata
Fields
Template:
Building Department
Company Name
VILLAGE CHASE
Building Department - Doc Type
Permit
Permit #
13-14386/14387
Building Department - Name
VILLAGE CHASE OF ZH LTD
Address
39216 VILLAGE CHASE APTS 6035 & 6037
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coastal Reconstruction Group <br /> � <br /> 5570 Florida Mining Blvd. S. <br /> Suite 304 <br /> Jacksonville,FL 32257 <br /> O:904.880.1919 F: 888.880.1399 C:904.254.8053 <br /> benz@coastalreconstruction.com <br /> www.coastalreconstruction.com <br /> •? Heating,ventilation,and air conditioning system work is limited to only the specific items listed herein. Testing or <br /> balancing of the system is excluded unless specifically provided for. <br /> •? Electrical work is limited to only the specific items listed herein. Contractor has not included individual circuit replacement <br /> or repair,any panel replacements or repairs,or disconnecting or re-energizing equipment is included unless specifically listed. <br /> •? Plumbing work is limited to only the specific items listed herein. No repairs to or replacement of any pipe,joint,or fixture <br /> are included unless specifically listed. Contractor will not accept responsibility for any pipe,joint,or fixture that is found to <br /> need repair or replacement unless Contractor damages exposed plumbing material through negligent acts by Contractor. <br /> Contractor is not responsible for any damage to concealed plumbing work that occurs during the execution of this Contract. <br /> •? Unless otherwise specified,all materials will be new and will be of the same kind,type,size,and make as the existing <br /> construction. When like or matching materials are unavailable,the Contractor shall have the right to subsritute for other <br /> materials of equal or better quality as agreed upon in good faith by the Contractor and Architect or Owner. If the substituted <br /> material exceeds the unit price allowed,then the additional cost to Coastal Reconstruction will be added to the contract cost by a <br /> change order. <br /> Respectfully Submitted, <br /> Ben Z <br /> Sales Executive, <br /> CRIB-07213-DEMO 7/10/2013 Page:2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.