Laserfiche WebLink
ARTICLE 8. -GENERAI. RESPONSIBIl.ITIES OF THE OWNER: <br /> 8.1 The Owner shail permit the Contractor ta use, at no extra cost, existing utilities such as <br /> light, heat, power, and water necessary for the proper execution and comple#ion of the <br /> work. <br /> 8.2 The Owner and occupants shall cooperate with the Contractor to facilitate the perfor- <br /> mance of the work and are responsible for the removal or protection of rugs, furniture, <br /> and clothing, if necessary. <br /> 8.3 The Owner and occupants shall be responsible for the proper use and care of the <br /> property including all equipment and appliances. <br /> 8.4 The Owner shall provide the Contractor wifh access to the property during normal <br /> working hours on normal working days. <br /> ARTICLE 9. -GENERAL RESPONSIBILITIES OF THE COMMUNITY DEVELOPMENT DIV131 N: <br /> 9.1 The Community Development Division shall provide general administration of the <br /> contract, but it is understood by all parties that the County is not a party to this Contract. <br /> 9.2 The Community Development Division shall make frequent inspections of the work while <br /> it is in progress to determine if it is proceeding in accordance with the contract dacu- <br /> ments. <br /> 9.3 The Community Developmen# Division shall have the authority to reject work which does <br /> not conform to th� contract documents. <br /> ARTICLE 10. - CONTRACT DOCUMENTS: This contract consists of the Bid Proposal, the Work <br /> Write-Up, including any drawings or plans, the General Bid Specifications, and any insurance policies specified <br /> in Article 5 above. <br /> ARTICLE 17. - CHANGES IN THE WORK: Except in an emergency endangering life or property, no <br /> change in the work shall be made by the Contractor unless he has received a prior written order signed by the <br /> Owner and authorized representatives of the Community Development Division. The contract sum and the <br /> contract time may be changed only by Change Order. No extra costs will be paid to the Contractor when he <br /> has neglected to properly eva(uate the extent of the construc#ion work. Change orders need to be in line with <br /> bidding amounts or pricing. <br /> ARTlCLE 12. - GUARANTEES AND WARRANTIES: The Contractor shall guarantee to coRect any <br /> wvrk that fails to conform to the contract documents and shall correct such defects due to faulty materials, <br /> equipment, or workmanship which appear during the progress of the wo�lc or within a period of one year from <br /> the date of final inspection and acceptance or such longer periods of time as may be speafied by law or by <br /> terms of any special guarantees required by the contract documents. The provisions of this Article app[y to <br /> work done by subcontractors as well as work done by the Contractor. Furthermore, the Contractor shall <br /> furnish the Owner, in ca�e of the Community Development Division, with all manufacturers' and suppliers' <br /> written guarantees and warranties covering materiafs and equipment furnished under the contract. These <br /> dacuments are ta be neatiy organized and bound in a �le type folder and submitted with the final pay request. <br /> 1f a warran#y item malfunctions or breaks, the Contractor shall contact the Owner within 24 hours to schedule <br /> the repair ar replacement of the item. The warranty item should be repaired or replaced within seven (7)days. <br /> SlCommunity DevelopmenUHousing Forms Revised 04/27/11 <br /> -4- <br />