My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-14867
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-14867
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2014 1:29:51 PM
Creation date
11/11/2014 1:29:48 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
14-14867
Building Department - Name
KEYSTONE CHALLENGE FUND INC
Address
4650 EAGLE RANCH DR LOT 7
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 13. - TERMINATION OF CONTRACT BY THE OWNER: If the Contractor defaults or <br /> neglects to carry out the work in accordance with the contract documents or fails to perform any provisions of <br /> the contract, the Community Development Division or the Owner acting through the Community Development <br /> Drvision may, after seven (7) days' written notice, terminate this contract and finish the work by whatever <br /> method he deems expedient. If the unpaid balance of the contract sum exceeds the expense of finishing the <br /> work, such excess shall be paid to the Cont�actor; but if such expense exceeds such unpaid balance, the <br /> Contractor shall pay the difference to the Owner or#he Corrtmunity Development Division. Failure to pay the <br /> unpaid baiance wilf result in disbarmenf from bidding on future Community Development Division projects. <br /> ARTICLE '14. - TERMINATION OF C�NTRACT BY THE CONTRACTOR: If the Owner faiis to <br /> perForm any applicable p�avisions of the contract, the Contractor may, upon seven (7) days' written notice to <br /> the Owner and the Community Development Division, terminate the contract, and recover from the Owner <br /> payment for all work satisfactorily completed and all other such remedies as are otherwise specifed by iaw <br /> ARTlCLE 15. -GENERAL CONDITtONS: <br /> 15.1 The Work Write-Ua shall take precedence ove� the basic specification and, when i� <br /> conflict, the material, equipment, or workmanship called for in the "Woric Write-Up"wi11 <br /> be required. <br /> 15.2 The Drawinqs of floor plans are diagrammatic only, illustrating the gene�al intention of <br /> the Owner; they do not show all the work required, exact dlmensions, or construc#ion <br /> details. <br /> 15.3 The 2090 Bid Speci�cations are detailed in a separate booklet available to the Owner <br /> and the Contractor from the Community Development Division. <br /> 95.4 Workmanship shall be done in accordance with the standards of the several trades <br /> known as a "workmanlike manner." <br /> 15.5 Materials shall be new, in good condition, and of standard grade unlsss otherwise <br /> agreed in writing before their delivery to the job. <br /> 15.6 Repairs shalf be made by the Contractor to all surfaces damaged by the Contractar <br /> resulting from his or his subcontractor's work under this contract at no additional cost <br /> to the Owner. Where "repair of existing work" is called for by the contract, the feature <br /> is to be placed in "equal to new candition" either by patching or replacement; all <br /> damaged, loose, or rotted parts shal! be removed and replaced, and the finished work <br /> sha(I match adjacent work in design and dimension. <br /> 15.7 Bids or Proqosals will be submitted at 8idders risk and the Owner or the Community <br /> Devefopment Division reserves the right to reject any or all bids or proposals. All bids <br /> or proposals are to be typed -nof hand wriften. <br /> 15.8 Building Codes -All work to be done shall be subject to the regulations of local building <br /> cfldes as interpreted by the applicable City or Caunty buifding department/division <br /> whether or not covered by#he specifications and drawings for the work. <br /> 15.9 Cleanup and removal from the site of all debris and waste materials resulting from his <br /> work shall be the responsibility of the Contractor. Materials and equipment that have <br /> been removed and replaced as part of the work shall belong to the Contracto� and <br /> shall be removed from the site. <br /> S/Community Deveiopment/liousing Forms Revised 04/27N 1 <br /> - 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.