My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-14868
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-14868
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2014 1:32:16 PM
Creation date
11/11/2014 1:32:13 PM
Metadata
Fields
Template:
Building Department
Company Name
EAGLE RANCH
Building Department - Doc Type
Permit
Permit #
14-14868
Building Department - Name
KEYSTONE CHALLENGE FUND INC
Address
4702 EAGLE RANCH DR LOT 6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 13. - TERMINATlON OF CONTRACT BY THE OWN�R: If the Contractor defaults or <br /> neglects ta carry out the work in acco�dance with the contract documents or fails to perForm any provisions of <br /> the contract, the Community Development Division or the Owner acting through the Community Development <br /> Division may, after seven (7) days' written notice, terminate this contract and finish the work by whatever <br /> method he deems expedient. If the unpaid balance of the contract sum exceeds the expense of finishing the <br /> work, such excess shall be paid to the Contractor; bu#if such expense exceeds such unpaid balance, the <br /> Contractor shall pay the difference to the Owner or the Community Developmerrt Division. Failure to pay the <br /> unpaid balance will result in disbarmerrt from bidding on future Community Development Division projects. <br /> ARTICLE 14. - TERMINATION OF CONTRACT BY THE CONTRACTOR; If the Owner fails to <br /> perForm any applicable provisions of the contract, the Contrac�or may, upon seven (7} days' written notice to <br /> the Owner and the Community Development Division, terminate the contract, and recover from the Owner <br /> payment for al!work satisfactorily completed and all other such remedies as are otherwise specified by law <br /> ARTICLE 75. -GENERAL CONDlTIONS: <br /> 15.1 The Work Write-Up shall take precedence over the basic specification and, when in <br /> conflict, the material, equipment, or worEcmanship call�d for in the "Work Write-lJp" will <br /> be required. <br /> 15.2 The Drawinqs of floor plans are diagramma#ic only, illustrating the general intention of <br /> the Owner; they do not show all the work required, exact dimensions, or constructian <br /> details. <br /> 15.3 The 2014 Bid Specifications are detailed in a separate booklet available to the Owner <br /> and the Contractor from the Community Development Division. <br /> 15.4 Workmanship shal! be done in accordance with the standards of the several trades <br /> known as a"workmanlike manner." <br /> 15.5 Materials shall be new, in good condition, and of standard grade unless otherwise <br /> agreed in writing be#ore their delivery to the job. <br /> 15.6 Reqairs shali be made by the Contractor to all surFaces damaged by the Contractor <br /> resulting from his or his subcontractor's work under this confract at no additianal cost <br /> to the Owner. Where "�epair of existing work" is called for by the contract, the feature <br /> is ta be placed in "equal to new condition" either by patching or replacement; ail <br /> damaged, loose, or rotted parts shall be removed and replaced, and the finished work <br /> shall match adjacent work En design and dimension. <br /> 15.7 Bids or Proaosals will be submif�ed at Bidder's nsk and the Owner or the Community <br /> Development Division reserves the right ta reject any or all bids or proposals. Ali bids <br /> or proposals are to be typed-nof hand written. <br /> 15.8 Buildinq Codes -All work to be done shall be subject to the regulations of local building <br /> codes as interpreted by the applicable City or County building department/division <br /> whether or not covered by the specifications and drawings for the work. <br /> 95.9 Cleanup and removal from the site of all debris and waste materials resulting from his <br /> work shall be the responsibility of the Contractor. Materials and equipment tf�at have <br /> been removed and replaced as part of the work shall belong to the Contractor and <br /> shall be removed from the site. <br /> S/Community DevelopmenbHousing Forrns Revised 04127l11 <br /> _ �.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.