My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-14886
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-14886
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2015 8:23:17 AM
Creation date
3/16/2015 8:23:14 AM
Metadata
Fields
Template:
Building Department
Company Name
KEYSTONE CHALLENGE FUND INC
Building Department - Doc Type
Permit
Permit #
14-14886
Building Department - Name
EAGLE RANCH
Address
5110 21ST ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 8. -GENERAL RESPONSIBII.ITIES OF THE OWNER: <br /> 8.1 The Owner shall permit the Contractor to use, at no extra cost, existing utilities such as <br /> light, heat, power, and water necessary for the proper execution and completion of the <br /> work. <br /> 8.2 The Owner and occupants shaU cooperafe with the Contractor to facilitate the pertor- <br /> mance of the wo�lc and are responsible for the remova( ar protec#ion of rugs, fumiture, <br /> and clothing, if necessary. <br /> 8.3 The Owner and occupants shall be responsible for the proper use and care of the <br /> property including all equipment and appliances. <br /> 8.4 The Owner shall provide the Contractor with access to the pro#�erty during normal <br /> working hours on normal working days. <br /> ARTICLE 9. -GENERAL RESPONSIBtLIT1ES OF THE COMMUNtTY DEVELOPMENT DIVtSION: <br /> 9.1 The Community Development Division sha(I provide general administration of the <br /> contract, but it is understood by all parties that the County is not a par#y to this Contract. <br /> 9.2 The Community Development Division shall make frequent inspections of the work while <br /> it is in progress to determine if it is proceeding in accordance with the contract docu- <br /> ments. <br /> 9.3 The Community Development Division shall have the authority to reject work which does <br /> not conform to#he contract documents. <br /> ARTICLE 10. - CONTRACT DOCUMENTS: This contract consists of the Bid Proposal, the Work <br /> Write-Up, including any drawings or plans, the General Bid Specifications, and any insurance policies speci#ied <br /> in Article 5 above. <br /> ARTICLE 41. - CHANGES IN THE WORK: Except in an emergency endangering life or property, no <br /> change in the work shall be made by the Contractor unless he has received a prior writ�en order signed by the <br /> Owner and authorized representatives of the Community Development Oivision. The contract sum and the <br /> contract fime may be changed only by Change Order. No extra costs will be paid ta the Contractor when he <br /> has neglected to properly evaluate the extent of the cons#ruction work. Change orders need to be in line with <br /> bidding amounts or pricing. <br /> ARTICLE 12. - GUARANTEES AND WARRANTiES: The Con#ractor shall guarantee to correct any <br /> work that fails to conform to #he contract documents and shall correct such defects due to faulty materials, <br /> equipment, or workmanship which appear during the pragress of the work or within a period of one year from <br /> the date of finaf inspection and acceptance or such longer periods of time as may be specified by law or by ' <br /> terms of any special guarantees required by the contract documents. The provisions of this Article apply to <br /> woric done by subcontractors as well as work done by the Contractor. Furthermore, the Contractor shall <br /> furnish the Owner, in care of the Community Development Divisian, with all manufacturers' and suppiiers' <br /> written guarantees and warranties covering materials and equipment furnished under the contract. These <br /> documents are to be neatly organized and bound in a �!e type folder and submitted with the ffnal pay request. <br /> If a warranty item malfunctians or breaks, the Contractor shall contact the Owner within 24 hours to schedule <br /> the repair or replacement of the item. The warranty item should be repaired or replaced within seven (7) days. <br /> S/Communfty DevelopmentlFiousing Forms Revfsed 04l27/t i <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.