My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-15148
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-15148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2015 7:48:20 AM
Creation date
3/17/2015 7:48:13 AM
Metadata
Fields
Template:
Building Department
Company Name
ORANGE BLOSSOM RANCH
Building Department - Doc Type
Permit
Permit #
14-15148
Building Department - Name
ORANGE BLOSSOM RANCH
Address
4615 BLOSSOM BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`- 1306 Banana Road, Lakeland, Florida 33810 <br /> � �E R�TI F I E D Local Phone. 863-859-3889 <br /> �� F�lJ N DATI O i�S� �(V�. To II Free. 800-329-3889 <br /> � FOUNDATION SOLUTIONS SINCE 1989 <br /> Fax.877-859-8593 <br /> February 26,2014 <br /> REVIEW pq�� . <br /> -� <br /> �ITY OF���H' I_L.��� <br /> Proposal PLANS EXA � = - . <br /> Sinkhole Stabilization Proaram <br /> Orange B/ossom Ranch Association Property <br /> 4616, 4618, 4620, and 4622 B/ossom Boulevard <br /> Zephyrhills, FL 33542 <br /> -- _ ,_.�, ;_ <br /> tI � '. S ��i ..i'�L ��E�i1�'?L1... <br /> i._ � <br /> rn <br /> ,_'j 1,�,�,i�',a� ( ,�?� �. t 1 Ot.i�:��C'�L����r <br /> CC;��i. �','d�:�i''���::'�L I'i:�C i KiC�CODE���� <br /> We are pleased to present the following proposal for your consideratia(i3j:i�"��s`I.j�Pb`�"' �s��'o��e <br /> geotechnical exploration provided. All work shall be in accordance with this proposal and any further <br /> direction from BCI ENGINEERS & SCIENTISTS,the engineer of record. <br /> Our objective with this work is to remediate the effects of the sinkhole activity beneath this structure. Several <br /> remedial measures have been discussed in the referenced report; 1) Deep Subsurface Grouting will deal <br /> with the sinkhole grouting treatment as outlined in the attached plan. 2) Shallow Chemical Grouting is <br /> intended to help consolidate the shallow loose sandy soils around the perimeter of the buzlding. <br /> l�l�.l:SSiJI�I: t�l�.()iJ'1'Ii�T(� <br /> T'his Deep "Compaction" type grouting approach will attempt to "Seal Off' the top surface of the <br /> limestone and fill solutioning channels in the overburden soils. Based on the information provided, we <br /> expect the Grout Injection points to extend down to an estimated depth of 55' below grade. . <br /> Drilling equipment will install nominal3-inch diameter flush joint steel casing around at locations approved <br /> by the engineer. After the casing has been installed to the prescribed depth a specially designed grout pump <br /> (Capable of generating 950 psi & 45 Cubic Yards per hour) will inject grout through a continuous length of <br /> hosing to the particular grout injection locations. The injection of the grout will be controlled by both volume <br /> and pressure while the steel grout pipe is extracted on a semi-continuous basis. Visual monitoring points will <br /> be maintained as specified. � <br /> Approximately 32 Injection Points will be required to inject an estimated 350 cubic yards of grout material. <br /> Injection points shall be angle drilled on an alternating basis or as otherwise directed by the engineer. Any <br /> additional injection points required would be installed at the unit rates provided in the pricing section of this <br /> proposal. <br /> Initials� <br /> Foundation Solutions Since zg89 <br /> Sinkhole Remediation I Pressure Grouting I Underpinning I Chemical Grouting I Pre-Construction Piling www.cfi-i.com <br /> Florida State General Contractor's License CGCiso4o67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.