My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-15148
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-15148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2015 7:48:20 AM
Creation date
3/17/2015 7:48:13 AM
Metadata
Fields
Template:
Building Department
Company Name
ORANGE BLOSSOM RANCH
Building Department - Doc Type
Permit
Permit #
14-15148
Building Department - Name
ORANGE BLOSSOM RANCH
Address
4615 BLOSSOM BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange B/ossom Ranch Association(2/26/14) <br /> C/aim No. 18002386 <br /> Paqe�2 of 4 <br /> It is very difficult to accurately predict the size of any voids that may be affecting this building; hence the <br /> grout quantities set forth herein are for estimating purposes only. A possibility exists that the voids and <br /> raveled zones affecting this property could be quite substantial. Should the actual billing quantities rec�uired <br /> to accomplish the engineers objectives be more/less than this estimate, an adjustment to the final billing will <br /> be applied at the unit rates set forth in this proposal. <br /> CI�I:�IICA�� (�1�.(liJ'1'I\T(� <br /> The "chemical" type grouting shall be performed using a smaller grout pump capable of generating the <br /> injection pressures necessary to accomplish the stated objective. Injection points on approximately 5' centers <br /> shall be drilled or driven to the prescribed depth, around the perimeter,to treat the affected areas. <br /> St;�)l�l; t)l� `1'[)l�,i� <br /> Certified Foundations Inc. will: <br /> 1. Furnish labor and material for the stabilization program outlined above. We will not be responsible for <br /> the removal/replacement of any inside furnishings, carpet, tile, air conditioners, decking, or drains. It <br /> should be noted that certain plants, shrubs, decking or screening may have to be temporarily removed to <br /> provide access for this work. Typically the location of the grout injection points can be adjusted slightly <br /> (at the discretion of the engineer)to deal with specific site conditions. <br /> 2. Our objective is to re-compact & densify the supporting soils as recommended by the engineer, as <br /> reasonably as possible without causing additional damage to the building or pool shell, if applicable. In <br /> undertaking this type of repair, however there is a chance that any cracks or stress points that were <br /> created from the sinkhole may become apparent during this procedure. CFI will do its best to minimize <br /> this but will not be responsible for any crack or cosmetic repairs in nature. We have not included an <br /> allowance for any additional engineering or third parly monitoring that may be necessary to permit & <br /> complete this work. <br /> 3. Proposal includes installing the grout points to 55 foot depth, injecting an estimated 350 Cubic Yards of <br /> grout material. In the event grout is delivered to the site but cannot be injected, we will be paid market <br /> price to cover our cost for the nzaterial. <br /> 4. We will contact the Sunshine State One Call of Florida. (The state regulated locating service) to have <br /> all member utilities located before we begin drilling. Responsibility for: and the location of all other <br /> utilities is to be provided by others. We will not be responsible for any wells or drain systems that may be <br /> affected by this process. (Note we expect to be grouting at a depth of 55 plus feet) We require that <br /> electric service of 110 volt 20 amp minimum, and fresh clean water be supplied within 100 feet of our <br /> operations. We will reimburse for any excess water usage when provided with 3 months previous water <br /> bills for averaging. <br /> 5. It is understood that in undertaking to correct/repair conditions present, other conditic�ns that were hidden <br /> may become known. Such consequences will be beyond CFI's control, and CFI assumes no <br /> responsibility for such consequences, CFI will however, use its best skills and experience to avoid or <br /> minimize them. The owner assumes responsibility for any hazardous waste uncovereci at this site. <br /> Initials �3u�/ <br /> Foundation Solutions Since ig8g <br /> Sinkhole Remediation I Pressure Grouting I Underpinning I Chemicai Grouting 1 Pre-Construction Piling www.cfi-i.com <br /> Florida State General Contractor's License CGCi5o4o67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.