Laserfiche WebLink
SUGGESTED WATER PROBLEM PROCEDURE <br /> When water is encountered in the ground during excavation of the pool,the foflowing procedure will enable you to <br /> divert this water temporarily and keep the area dry during construction. Once the installation is complete,ground <br /> water wili not disturb the pool because the internal hydrostatic pressure of the pool water is greater than that of the <br /> water beneath the pool. It is also advisabie to install a hard bottom instead of a sand bottom, thereby eliminating the <br /> possibility of a wash-out of the pool base. <br /> 1. Over-dig hopper bottom one to two feet and place tt2 crushed sione four to six yards depending on size of pool <br /> and severiry of wate�problem.) <br /> 2. If water is erupting from other areas such as the slopes or breakover, over dig these areas and place stone so that <br /> the water will drain to the hopper bottom. (Note: Be sure to dig enough to allow for the addition of two inches of <br /> pool base.) <br /> 3. Next, get enough length of pipe(1 7/2"diameter), so that you will be able to imbed one end into the stone in the <br /> hopper,while imbedding and running the rest of the pipe up the slope and under the panels to ground level. Note: <br /> Be sure the prpe end is located at the bottom of the stone bed. Instal I a 1 1/2"foot valve at the end of the pipe to be <br /> inserted into the stone.This will provide a screen and check valve. <br /> 4. Connect the pipe to a low head electric pump and leave the discharge line slightly elevated, so as not to lose <br /> prime.Turn it on and/eave it running until the pool is finished and is filled with water. Cap off the line and leave it for <br /> future use in liner replacement. <br /> POOL EXCAVATION <br /> Note: Remember that the pool will be dug 2 feet larger on all sides than its original dimensions.This allows room <br /> for erecting panels and placement of A-frames. Instruct your backhoe operator to excavate the width of his bucket <br /> (approxirnately 24")on the outside of the pool layout, to accommodate for this area.You may also outline this area <br /> with spray paint. <br /> Explain to the backhoe operator that the 24"shelf is located 44 1/2" below the bench mark(42" -height of the steel <br /> panels plus 2 1/2"-height of the receptor coping. Refer to Diagram A. <br /> DIAGRAM A <br /> ------- -------- BENCHMARK _ <br /> ——— —————————� <br /> �r �*K• <br /> c�uNo ortowo <br /> TOTOPpp TOBEMCM <br /> PIWEL � d�7¢' <br /> GROl1ND � <br /> TOBENCt1 GROVtMI <br /> TOIOVOF <br /> 71'SHiLF �K P�+EI <br /> 21'SNELF <br /> NOTE: All dimensions Include 2'fw overdig. This dagram has a <br /> 40'shallow end finlsh depth and an 6'deep end finish depth. <br />