Laserfiche WebLink
On strings 3 and 4 measure in from side wall (Width of hopper side A). Drop a plum line down (Depth of hopper <br /> less steei side wall [3). <br /> . <br /> . <br /> � <br /> . <br /> . <br /> / / A/ � <br /> � ,�. <br /> I ' � . <br /> � <br /> . � <br /> . � B f. <br /> . . , <br /> . � <br /> 2 .' � ' B <br /> .�B , <br /> � f � <br /> A � Y <br /> ./ � ' �tB <br /> � , <br /> � A ' <br /> � � <br /> 3 f . <br /> � <br /> 4 � <br /> 5 <br /> Place 4 pins at B's. Tie one string from B to pin 5 and one string from pin 2 to B. Repeat on opposite side. <br /> I <br /> 2 <br /> I � <br /> � <br /> � <br /> 2 . � <br /> � B� <br /> � , <br /> � <br /> � B g 5 <br /> B� <br /> 5 <br /> Remember--The rough grade is 2" below the string. Make sure the rough grade is free and clear from any sharp <br /> objects. <br />