Laserfiche WebLink
STEP PLA�EMENT <br /> � <br /> TRIM LlNE COtLAR STEPS:Set step unit between two panels.Adjust height �- � <br /> of ste b ali nin to of co in with to of ste Fi ure#I See Caution FIGURE 1 F�.�s� � <br /> P Y 8 S P P S P P� 8 ){ } t�,,,: <br /> and plumb by checking front face ot scep unit with adjoining panels. ? ', � �� • <br /> 1 ; I ron�� : <br /> I wNi �.. <br /> NOTE Step is universal in height to most coping designs(Bull nose,Flat,etc.) saou� i1 , �P°"°'' ' <br /> in the pool industry. To help with height variance,step comes complete wich 4 ' % { <br /> `�, � p . <br /> Styrofoam blocks if needed.These blocks will fill any void between che coping � � � <br /> and the step nosing that may appear when lowering the step.(Some cutting of � <br /> the Styrofoam may required for a perfect fit.) (See Figure#2) `' ! `: <br /> . _ i --- <br /> NOTE:A smali piece of copiog can 6e used as a measuring <br /> CANTILEVER STEPS:Set step unit between two panels.Adjust height of step �,�de when placed on che cop of the panel. <br /> by aligning top flange of panel with top collar of step(Figure#3)and plumb by <br /> checking front of step unit with adjoining panels.Failure to do this could result <br /> with pool having insufficient water level on top step. <br /> FIGURE T FIGURE 3 ��� <br /> Lock Step unit in place with vice grip pliers. T,,,,,,�,,N�,, ���+ <br /> r� ,. .. r-F��g�.._.-- �. <br /> Using holes in the panei as a template,drill holes through flange into step and i coc��ek.. , <br /> , :�:. <br /> bolt in place with a brace on each side of step unit __ _ .' ; -._., _� - �� � � .,., <br /> smow� t—� <br /> Pour concrete bond beam around pool and step unit Slope bond beam away S'"PU"' � + ' ' � � $"0u� � � i' <br /> from step to ensure proper drainage. � �, I <br /> t � — - __ <br /> J% � - , ibd �� !' ,, . <br /> � r.___._J r � <br /> __ , � � � , .�. <br /> Backfill behind steps at least 2'before liner installation.Backfilling should be ' ___�I 1•��1 <br /> � <br /> done wich sand(NEVER CLAY),a�d throughly compatted in Iayers.When � � 1�;.:; <br /> . _ _. y:.: <br /> finishing poot base fn front of scep unit,taper it up,and make a slight cove.This <br /> will help to relieve any excessive pressure on pool Ilner.{See Figure#4) <br /> C(�RRECT INCORRECT <br /> FIGURE 4 <br /> - - IINER <br /> --. - UNER <br /> �T�P - � STEP ,--- AIR SPACE <br /> COVE I-- -_.___ WITHpUT <br /> - CflVE <br /> a . <br /> For correct result(photo B),when corinecting panel to step,adjust step height to meet top of coping(photo A). Failure to do so will <br /> result in an incorrect installation(photo C). <br /> CORRECT PHOTU A C'URREC 7 PHQTU 8 (NCC)RRECT PH(?Tt)C <br /> 4 .��� ,��',�" —�-- . <br /> ,�;����: "� � . <br /> `� - <br /> .<,T ,. . .. <br /> q .'°.�,. .�: , ' ` <br /> . ,� <br />