PGT Industries
<br /> NOTICE OF ACCEPT NC : EVIDENCE�UBMITTED
<br /> A. DRAW�NGS
<br /> l. M�anufacturex's ctie drawings ar�d se tiaz�s.
<br /> 2. Drawing No 4032-2p, Sheets 1 thr ,gh 14 of 14,titled"Alum. Single Hung Window,
<br /> Nan-Impact",prepared by manufa rer,dated 9I21J05 with revision D dated
<br /> 10/07/l l,signed and sealed by Ant ony Lynn Mi11er,F.E.
<br /> B. TESTS
<br /> 1. Test reparts on: 1)Uniform Static ir Pressure Test,Loading per FBC TAS 202-94
<br /> along with marked-up drar�vings an installation diagram of Praview aluminum single
<br /> hung wlintegral fin�312 b"temp}, epared by Fenestration Testing Labora#ory,Test
<br /> Report No.FTL-48$6,dated 0311 /O6,signed and sealed by Eduardo Largaespada,
<br /> P,E.
<br /> (S'ubmitted under previvtts NOA 015�121X.07)
<br /> 2. Test reports on: 1}Air In�ltration est,per FBC,TAS 2Q2-94
<br /> 2)Unifarm Static ir Pressure Test,Loading per FBC TAS 202-94
<br /> 3)Water Resistan e Test,per FBC,TAS 202-94
<br /> 4)Forced Entry T st,per FBC 3503.2(b}and TAS 202-94
<br /> along with marked•up drawings d installation diagram of aluminurn single hung
<br /> , window wlintegral fin{3J16"tem .),prepared by Fenestration Testing L�boratory,
<br /> Test Report No.FTL-4959,dated 7/19/OS,signed and sealed by Eduarda
<br /> Largaespad�,P.E.
<br /> (Submitted under previous NUA 05-0928.03)
<br /> 3. Test reparts on: 2)Air Infiltration est,per FBC,TAS 202-94
<br /> 2)Uniform Static Air T'ressure Test,Lc+ading per FBC TAS 202-94
<br /> 3)Wa#er Resistan e Test,�r FBC,TAS 202-94
<br /> � 4)Forced Entry st,per FBC 3603.2(b)and TAS 202-94
<br /> along with marked-up ti�awings d ins#allatiorc diagram vf aluminum single hung
<br /> windaw(3/X6"temp.&3/16" .),prepared by Fenestration Testing Laboratory,
<br /> Test Report No.FTL-4655,date 0?108145,signed and sealed by Eduardo
<br /> Largaespada,P.E.
<br /> (Submitted ur�der prev�ous N4A OS-Q928.D3}
<br /> 4. Test reports on: 1)Unifar�n St.�ti Air Pressure Test,Loading per FBC TAS 202-94
<br /> 2}Water Resis ce Test,per FBC,TAS 242-94
<br /> 3)Forced Entry est,per FBC 3603.2(6) and TAS 202-94
<br /> alt�ng with marked-up drawings d installation diagram of aluminum single-hung
<br /> window(3/16"ann. IG),prepaze by Fenestration Testing Laboratory,Test Report
<br /> No.FTL-A658,datsd 07l15I05,s gned and sealed by Eduardo Largaespada,P,E.
<br /> (SuhmBtted under previous ND�# US-0928.1i3}
<br /> Msn el r P.E.
<br /> Product Control iner
<br /> NOA TJo. 21-1013.13
<br /> Expirution Date: January 26,2016
<br /> Approvat Date: Deceamber 88,2Q11
<br /> E-1
<br />
|