PGT Industries
<br /> NOTICE OF ACCEPTANC : E'VIDENCE SUBMITTED
<br /> 5. Test reports on 1)Uniform Static Ai Pressure Test,Loading per FBC,TAS 202-94
<br /> alang with marked-up dravuings and ins#allation diagram of aluminum singie hung
<br /> ' wi.ndow{IIS"ann. IG),prepared by enestration Testing Laboratory,Test Report No.
<br /> F'TL-465'7,da#ed 0?/08105,signe�l d sealed by F.tluardo Largaespada,P.E.
<br /> (Submitted under previous NOA # 5-0105.01)
<br /> 6. Test reports on: 1}Air Infil�ratiozt T ,per FT3C,TAS 202-94
<br /> 2)Uniform Static ir Pressuxe Test,Loading per FBC TAS 202-94
<br /> 3}'tWater Ttesistanc Test,per FBC,TAS 242-94
<br /> 4)Forced Entry Te t,per FBC 3b03.2(b)and TAS 202-94
<br /> alt�ng with marked-up drawings an installatian diagram af aluminum single hung
<br /> window(1J8"temp. IG},prepared Fenestration Testing Laboratory,Test Repart
<br /> No.RTL-4656,dated 47107lO5,si ed and sealed by Eduardo Largaespada,P.E.
<br /> (Suhmitted under pr+ev�ot�s NOA # S OIOS.OI)
<br /> 7. Test reports on: 1}Air Infil�ation est,per FBC,TAS 202-94
<br /> 2)Uniform Static ir Pressure Test,Laading per F$C TAS 202-94
<br /> 3�Water Resistanc Test,per FHC,TAS 202-94
<br /> 4)Forced Enhy Te�t,per FBC 3b03.2{b}and TAS 202-94
<br /> along with marked-up drawings an installation diagram of alurninum single hung
<br /> window(1/8>'.ann. �+C),Prepared:� Fenestr�tio�r Testing Laboratory,Test Report No.
<br /> FTL-4G54,dated 07/071p5,signed d sealed by Eduardo Largaespada,P.E.
<br /> (Submttted under previvus NOA # S-tf1�S.OI�
<br /> 8. T�st reports on: 1)Air Infiitration est,per FBC,TAS 202-94
<br /> 2}Unifvrm Static ir Pressure Test,Loading per FBC TAS 242-94
<br /> 3}Water Resistan Test,per FBC,TAS 202-94
<br /> 4}Forc�d Entry T st,per FBC 3603.2(b}and TAS 242-94
<br /> along with marked-up drawings an installation diagrarn of aluminum single hung
<br /> window{3116"temp.3116"ann, &3116"ann.IG),Prepared by F�nestration Testing
<br /> L�boratory,Test Report No. FTL- 653,dated 07/Q7/05,signed and sealed by Eduardo
<br /> Largaespada,P.E.
<br /> (Submitted under previou�s NpA OS-OIOS.01}
<br /> C. CALCULATIONSc
<br /> 1. Anchor verificatiar�aalculations d structural analysis,complying with FBC-2047
<br /> and FBC-2010,dated 06/08/1 l an updated on IO/07/1 I,signed and sealed by
<br /> Anthany Lynn Miller, P.E.
<br /> 2. Glazing complies with ASTM EI 04-04
<br /> D. QUALITY ASSURANCE
<br /> 1. Miami-Dade Depariment of Perm' 'ng,Environment,�nd Regu��ff�irs(PERA).
<br /> Manu ez,P.E.
<br /> Product Cont t xaminer
<br /> NOA No.11-1013.13
<br /> Lxpiratfon Daie: January 26,201G
<br /> Approval Date: December Q8,201 I
<br /> .�
<br />
|