Laserfiche WebLink
. 7 <br /> � ARTiCLE 8. -GENERAL RESPONSlBtLlTIES t�F THE 4WNER: <br /> 8.1 The 4wner shall permit the Contra or to use, at no extra cost, existing utili#ies such as <br /> light, heat, power, and water nece �sary for the proper execution and completion of the <br /> work. <br /> 8.2 The Owner and occupants shali c operate with the Contractor to facilitate the perFar- <br /> mance of the work and are responsible for the removal ar profection of rugs, furniture, <br /> and c(othing, if necessary. � <br /> 8.3 The Owner and occupants shall be responsible for the praper use and care af the <br /> property inciuding a11 equipment an appiiances. <br /> 8.4 The Owner sha(I provide the Co�tractor with �CG@SS tfl the property during norma( <br /> working haurs an norma! working dlays. <br /> ARTtCLE 9. -GENERA� RESPC?NSIBlLlTIES OF THE CQMMUNlTY DEVEl.OPMENT DlV1SION: <br /> 9.1 The Community Development D vision shall provide general administration of the <br /> contract, but it is understood by all parties that the County is not a party to this Contract. <br /> 9.2 The Community Development Divi ion shall make frequent inspections of the work while <br /> it is in pragress to determine if it is proceeding in accordance with the contract docu- <br /> ments. <br /> 9.3 The Cammtanity Developmen# Divi ian shalf have the authority ta reject work which does <br /> not confarm to the cantract dacuments. <br /> ARTtCL.E 94. - GUNTRAGT DOGUMENTS: T is contract consists of the Bid Proposal, the Work <br /> Write-Up, including any drawings or plans, the General id Specifications, and any insurance policies speci�ed <br /> in Article 5 above. <br /> ARTICLE 11, - CHANGES IN THE WORK: Ex ept in an emergency endangering (ife or property, no <br /> change in the work sfiall be made by the Contractor unl ss he has received a prior written order signed by the <br /> Owner and au#harized representatives af the Commu i#y Development Divisian. The contract sum and the <br /> contract time may be changed oniy by Change Order. No e�ttra costs wil( be paid to the Contractor when he <br /> has negiected #o praperly evaluate the extent of the co structian work. Change orders need to be in line wi#h <br /> bidding amaunts or pricing. ' <br /> ARTlC�E 12. - GUARANTEES AND WARRA TtES: The Contra�#or shall guaran#ee to correct any <br /> work that fails to confarm #a tlie contract documents ' r�d shal! corre�t such defects due ta faulty materia(s, <br /> equipment, or workmanship which appear during the p ogress of the work or within a period of one year from <br /> the da#e af f:nal inspectian and acceptance or such la ger periods of time as may be specified by law or by <br /> terms of any special guarantess required by the contract documents. The provisions of this Article app(y to <br /> work done by subcontractors as well as work done �y the Contracfor. Furth�rmore, the Contractor sha(( <br /> furnish the Owner, in care of the Community Devel pment Division, with ail manufacturers' and suppliers' <br /> written guarantees and warranties covering materiai and equipment fumished under the contract. These <br /> documents are to be neatiy arganized and bound in a �le type fofder and submitted with the finai pay request. <br /> (f a warranty item maifunctians or breaks, the Contrac or shail cantact the C3wner within 24 hours ta schedule <br /> the repair or replacement of the item. The warranty ite shauld be repaired or replaced within seven {7} days. <br /> S/Community DeveiopmentlHousing Forms Ftevised 04127!'f 1 <br /> 4- <br />