%
<br /> e- � i
<br /> , - �
<br /> , I
<br /> Pulin spacing can be up to 30 ' ches for 29-gauge (2 feet is most common)
<br /> and up to 41/z feet for 26-gauge roofing.
<br /> Screws should be placed on bo sides of the ribs on the eave
<br /> �
<br /> �
<br /> Screw Spacing (purlin)
<br /> Liner feet of '
<br /> panels in your 12 inch 18 inch 24 inch 30 inch
<br /> order �
<br /> 50 270 ' 180 135 108
<br /> 100 540 360 270 216
<br /> 200 1,080 720 540 432
<br /> 300 1,620 i 1,080 810 648
<br /> I 400 2,160 � 1,440 1,080 864
<br /> ,
<br /> 500 2,700 � 1,800 1,350 1,080
<br /> 600 3,240 2,160 1,620 1,296
<br /> 700 3,780 � 2,520 1,890 1,512
<br /> S00 4,320 � 2,880 2,160 1,728
<br /> 900 4,860 � 3,240 2,430 1,944
<br /> 1,000 5,400 3,600 2,700 2,160
<br /> 1,100 ` 5,940 � 3,960 2,970 2,376
<br /> 1,200 6,480 ; 4,320 3,240 2,592
<br /> Policies i
<br /> �
<br /> i
<br /> Indemnity: All prices and desi are subject to change without notice.
<br /> Disclaimer: Despite the fact th we have made every attempt at accuracy in
<br /> this manual, we are not respons ble for typographic, printing, or technical
<br /> errors. ',
<br /> I
<br /> '�
<br /> ;
<br /> �
<br /> �
<br /> �
<br />� � ,
<br /> i
<br /> I
<br />
|