.
<br /> TRINITY I ERD
<br /> TABLE 3A:CONCRETE DECKS—NEW CONSTRUCTION oa REROOF(TEna-OFF)
<br /> n
<br /> SYSTEM TYPE A-lA:BONDED INSULATION,BONDED ROOF COVER
<br /> System Base Insulation Layer Top Insulation Layer Roof Cover
<br /> Roof Deck MDP(psf)
<br /> No. Type Attach Type Attach Membrene Application
<br />' Structural Min.1.5-inch SecurShield HD Composite,H- FAST 100,FAST 100 LV, FAST 100 LV,full
<br /> C38. None N/A VersiFleece -427.5
<br /> concrete Shield HD Composite Flexible FAST(full) coverage
<br /> Structural Min.1-inch Pol iso anurate MP-H,H-Shield, FAST 100 LV,Flexible (Optional)Min.1-inch FAST 100 LV,Flexible FAST FAST 100 LV,Flexible
<br /> Y �Y
<br /> C39. VersiFleece -427.5
<br /> concrete SecurShield or H-Shield CG FAST(full) base insulation (full) FAST,full coverage
<br /> (Optional)One or more
<br /> layers min.7/16-inch FAST 100,FAST 100
<br /> Structural Min.7/16-inch APA rated OSB,0.25-inch Dens FAST 100,FAST 100 LV, APA rated OSB,0.25- FAST 100,FAST S00 LV, VersiFleece LV,Fiexible FAST,full -457.5
<br /> C-40. concrete Deck or thick Dens Deck Prime Flexible FAST(full) Flexible FAST(full)
<br /> inch Dens Deck or thick coverege.
<br /> Dens Deck Prime
<br /> Min.7/16-inch APA
<br /> Polyisocyanurate MP-H,MP-N,or MP-W, FAST 100,FAST 100
<br /> Structural FAST 100,FAST 100 LV, reted OSB,0.25-inch FAST 100,FAST 100 LV,
<br /> C-ai. �oncrete ENRGY 3,H-Shield,SecurShield,H-Shield CG,or Flexible FAST(full) Dens Deck or thick Dens Flexible FAST(full) VersiFleece LV,Flexible FAST,full -457.5
<br /> Deck Prime
<br /> Structural Min.0.5-inch base FAST 100,FAST 100
<br /> ��z' concrete Min.0.5-inch Polyisocyanurete MP-H,H-Shield OB500 insulation OB500 VersiFleece LV,ribbons 12-inch -157.5
<br /> _o.c. —
<br /> VERSIFLEECE AC MEMBRANE APPLICATIONS:
<br /> Strudural VersiFleece
<br /> C-a3. concrete Min.0.5-inch Versico Recovery Board HA None HA A� Hot Asphalt -150.0
<br /> One or more layers min.1.5-inch
<br /> �� Structural Polyisocyanurate MP-H,MP-N,MP-W,ACFoam HA Min.0.5-inch Versico HA VersiFleece Hot Asphalt -150.0
<br /> concrete II,H-Shield,SecurShield,H-Shield CG,ENRGY 3 Recovery Board AC
<br /> or ISO 95+GL
<br /> VERSIWELD QA M EMBRANE APPLICATIONS:
<br /> (Optional)One or more layers,min.1-inch FM
<br /> Structural FAST 100,FAST 100 LV, Min.2-inch Insulfoam FAST 100,FAST 100 LV, VersiWeld
<br /> c-45. �oncrete APProved EPS(BASF,NOVA,or Huntsman Flexible FAST(full) SP Flexible FAST(full) Qp, Self-adhered -315.0
<br /> beads)
<br /> Exterior Research and Design,LLC.d/b/a Trinity� ERD Evaluation Report C35230.11.10-RS for FL14207-R6
<br /> Certificate of Authorization#9503 Revision 5:06/19/2014
<br /> Prepared by: Robert Nieminen,PE-59166 Appendix 1,Page 23 of 36
<br />
|