�
<br /> . r,
<br /> �
<br /> � II
<br /> TRINITY�ERD
<br /> TABLE7A: RECOVERAPPLICATIONS
<br /> SYSTEM TYPE A-1:BONDED INSULATION,BONDED ROOF COVER
<br /> Substrate easelnsulation Layer Topinsulation Layer Roof Cover
<br /> System No. See Note 12 T e Attach T e Attach T e A lication MDP(psf)
<br /> ( ) YP YP YP PP�
<br /> (Optional)Polyisocyanurate MP-H,
<br /> Existing asphaltic FAST 100,FAST 100 LV,
<br /> R-10 BUR or mineral MP-N,or MP-W,ENRGY 3,H-Shield, FAST 100,FAST 100 LV Polyisocyanurate MP- FAST 100,FAST 100 LV VersiFleece Flexible FAST,full -187.5
<br /> surface cap sheet SecurShield,H-Shield CG,or AC Foam (full) HNB,H-Shield NB (full) coverage. �
<br /> Existing gravel-
<br /> R-11 surfaced asphaltic Min.1-inch Insulfoam SP Flexible FAST(full) None N/A VersiFleece Flexible FAST(full) -222.5
<br /> BUR
<br /> Existing asphaltic Min.1.5-inch Polyisocyanurate MP-H, FAST 100,FAST 100 (Optional)Additional FAST 100,FAST 100 LV, Aqua Base 120 BA,
<br /> R-12 BUR or mineral MP-N,MP-W,ACFoam II,H-Shield, LV,Flexible FAST(full) layers of base insulation Flexible FAST(fuil) VersiFleece HydroBond Water- -232.5
<br /> surface cap sheet SecurShield,H-Shield CG,ENRGY-3 Based
<br /> istfr+g-aspha4' e-ocmoce l ' = i�a_��� . .�� FAST 100,FAST 100 LV, I
<br /> R-13 BUR or mineral Approved EPS(BASF,NOVA,or ersi eece exi e , - .
<br /> (full) approved fiberboard (full) �
<br /> surface cap sheet Huntsman beads) coverage.
<br /> _ Existing asphaltic FAST 100 LV,full
<br /> R-14---BUR or mineral -Min.-l-inch Insulfoam SP -FAST_1001V_(full) _None N/A VersiFleece -232.5
<br /> surface cap sheet — -coverage ___
<br /> Existing asphaltic Min.1.5-inch SecurShield HD FAST S00 LV,full
<br /> R-15 BUR or mineral Composite,H-Shield HD Composite FAST 100,FAST 100 LV None N/A VersiFleece coverage -Z32.5
<br /> surface cap sheet
<br /> (Optional)One or more
<br /> Existing asphaltic Min.7/16-inch APA rated OSB,0.25- layers min.7/16-inch FAST 100,FAST 100 LV,
<br /> FAST 100,FAST 100 LV FAST 100,FAST 100 LV
<br /> R-16 BUR or mineral inch Dens Deck or thick Dens Deck (full) APA rated OSB,0.25-inch (full) VersiFleece Flexible FAST,full -232.5
<br /> surface cap sheet Prime Dens Deck or thick Dens coverage.
<br /> Deck Prime
<br /> Existing asphaltic Polyisocyanurete MP-H,MP-N or MP- FAST 100,FAST 100 LV Min.7/16-inch APA rated FAST 100,FAST 100 LV FAST 100,FAST 100 LV,
<br /> R-17 BUR or mineral W,ENRGY 3,H-Shield,SecurShield,H- �full) OSB,0.25-inch Dens Deck (full) VersiFleece Flexible FAST,full -232.5
<br /> surface cap sheet Shield CG,or AC Foam II or thick Dens Deck Prime coverage.
<br /> Existing asphaltic Min.1.0-inch Polyisocyanurate MP-H, FAST 100,FAST 100 LV (Optional)Additional FAST 100,FAST 100 LV FAST 100,FAST 100 W,
<br /> R-18 BUR or mineral H-Shield,SecurShield,H-Shield CG (full) layers of base insulation (full) VersiFleece Flexible FAST(full) -300.0
<br /> surface cap sheet
<br /> Existing gravel-
<br /> R-19 surfaced asphaltic Min.1-inch Insulfoam SP FAST 100 LV(full) None N/A VersiFleece FAST 100 LV(full) 395.0
<br /> BUR
<br /> EMerior Research and Design,LLC.d/b/a Trinity� ERD Evaluation Report C35230.11.10-RS for FL14207-R6
<br /> Certificate of Authorization#9503 Revision 5:06/19/2014
<br /> Prepared by: Robert Nieminen,PE-59166 Appendix 1,Page 32 of 36
<br />
|