My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-15532
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-15532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2015 10:06:37 AM
Creation date
11/19/2015 10:02:33 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
14-15532
Building Department - Name
EPPERSON,KOLBY JOHN
Address
38800 9TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. i <br />� + + <br /> y � � <br /> �-�1io,�nzak <br /> � <br /> , Woz iak Builders,Inc. Business: (813) 377-4944 <br /> 'LuZG�ers P•0. Box 326 Fax: (813) 377-4945 <br /> - Dad City, FL 33526 www.wozniakbuilders.com <br /> Building Better Lives <br /> Remodeling Contract <br /> July 12,2014 <br /> I <br /> Epperson/Kelly Residence Remodel <br /> 38800 9th Avenue <br /> Zephyrhills, Florida 33541 <br /> ' _ <br /> Between: � <br /> John Epperson <br /> 38800 9th Avenue <br /> Zephyrhills, Florida 3 541 <br /> And the Contractor: <br /> Wozniak Builders, Inc <br />� PO Box 326 " <br /> Dade City, FL 33526 <br />' CGC 1505145 <br /> 813-377-4944 <br /> For the Project: <br /> Epperson/Kelly Resid nce Remodel <br /> 38800 9th Avenue <br /> Zephyrhills, Florida 3 541 . <br /> SCOPE OF WORK <br /> Original Items reviewed: , <br /> Item#1. Kitchen. <br /> Cap off old plumbing and electrical. <br /> Build beam as top of existing masonry wall. <br /> Fur out wall, insulate, drywall and finish drywa I (smooth finish for ceiling and light orange-peel for <br /> walls). <br />' Install new(6)can recessed lights, one pendan and one fixed light. <br /> Install GFI plugs along countertops to meet co e spacing and circuit requirements. <br /> Reverse electrical panel to exterior panel (sam location). <br /> Item#2. Living room,dining area and hall. <br /> Remove walls and closets that divide dining ro m from living room. <br /> Build lam beam at load bearing point. <br /> Install 3 columns,supports,style and spacing t be determined. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.