r . <br /> Wozn�iak Builders, InC. State Certified Contractor License#CGC1505145 <br /> � <br /> Item#3 Renovate bathrooms and laundry. <br /> Hall Bath <br /> � Remove tub,floor tile, wall tile,vanity and fixt res. . <br /> Install shower floor with 4 inch curb. <br /> Install new tub,floor and bath wall tile, new si k, base cabinet and faucet and toilet. <br /> Install new lights and fan. <br /> Laundry Room <br /> Add plumbing and electrical for washer/dryer. <br /> Bathroom 2 � <br /> � Install new floor and wall tile, new sink, base c binet and faucet and toilet. <br /> Install new lights and fan. � <br /> *Additional Items reviewed July 10, 2014 at alk-through. <br /> Install 10 recessed lights to new open space. C ordinate light plan with designer. <br /> Enlarge bathroom#2 door opening. <br /> Master Closet-enlarge door opening, install n w door and hardware. Remove one side of shelving for better <br /> access to side and rear of usable closet space. <br /> Widen sidewalk to front door to double the w dth and landing area,at front entry door. <br /> *Additional items presented via email July 1 , 2014. <br /> Install garbage disposal. Includes electrical to i stall designated circuit, plumbing and disposal. Disposal allowance <br /> $200.00. <br /> Install dishwasher. Includes electrical, plumbi g, and installation. Dishwasher appliance allowance$350.00. <br /> The following items are estimated, however eed confirmation by subcontractor. <br /> Lower electrical plugs throughout and check f r non ground wiring <br /> Install new AC condenser and air handler 14 s er, relocate to carport and modify duct work for new air handler <br /> location. <br /> Total Contract: $17,400.00 <br /> *Costs include dumpster fees, permits, pl ns engineer's fees. Contractor reserves a 5%contingency to <br /> allow unforeseen construction cost over ges. , <br /> Any changes to contract will be treated as a hange Order.A Change Order is any change to the original plans <br /> and/or specifications. All change orders need o be agreed upon in writing, including cost, additional time <br /> considerations, approximate dates when the ork will begin and be completed, a legal description of the location <br /> where the work will be done and signed by bo h parties. 30%of the cost of each change order will be paid prior <br /> to the change,with the remaining amount pai upon completion of the change order. A 15%fee shall be added <br /> to all change orders and overages in excess of initial allowances. Additional time needed to complete change <br /> orders shall be taken into consideration in the project completion date. <br /> Any delays or changes in finish selection sch dules will delay the projected completion date. <br /> INSURANCE <br /> ; Owner will purchase and maintain property in urance to the full and insurable value of the project,in case of a <br /> fire,vandalism, malicious mischief or other in tances that may occur. <br />