<br />Smoke Evacuation Schematic Diagram
<br />Scale: NTS
<br />0
<br />7
<br />SMOKE CONTROL SYSTEM VERIFICATION
<br />INSPECTION PROCEDURES FOR SMOKE CONTROL
<br />1 SCOPE
<br />THE INSPECTION PROCEDURES DESCRIBED APPLY TO SMOKE CONTROL SYSTEMS THAT ARE DEDICATED
<br />TO CONTROLLING SMOKE IN BUILDING ATRIUM FIRES. THESE PROCEDURES ADDRESS THE MAJOR
<br />COMPONENTS OF SMOKE CONTROL SYSTEMS. THE PHRASE AS SPECIFIED IS USED TO MEAN AS
<br />SPECIFIED IN ACCORDANCE WITH CONTRACT DOCUMENTS, THE FLORIDA BUILDING, NFPA 92B SMOKE
<br />MANAGEMENT SYSTEMS IN MALLS, ATRIA AND LARGE SPACES, LATEST EDITION.
<br />2 BARRIERS
<br />a. CHECK WALLS, PARTITIONS, FLOORS, AND CEILINGS OF BARRIERS OF SMOKE CONTROL
<br />SYSTEMS FOR OBVIOUS AND UNUSUAL OPENINGS THAT COULD ADVERSELY AFFECT SMOKE CONTROL
<br />PERFORMANCE.
<br />b. CHECK THAT GAPS AROUND DOORS DO NOT EXCEED THE LIMITS SPECIFIED. IF GASKETING IS
<br />REQUIRED, CHECK THAT IT IS AS SPECIFIED.
<br />C. CHECK THAT AUTOMATIC DOOR CLOSERS IN BARRIERS OF SMOKE CONTROL SYSTEMS ARE AS
<br />SPECIFIED.
<br />3 AIR -MOVING EQUIPMENT
<br />A. CHECK DUCTS TO VERIFY THAT DUCT MATERIAL AND CONSTRUCTION ARE AS SPECIFIED.
<br />B. CHECK DUCT INSTALLATION. DUCT INSTALLATION, INCLUDING THE HANGERS, MUST NOT REDUCE
<br />THE FIRE -RESISTIVE RATING OF STRUCTURAL MEMBERS AND ASSEMBLIES. FREQUENTLY,
<br />STRUCTURAL MEMBERS AND ASSEMBLIES HAVE FIRE -PROTECTIVE COVERINGS, SUCH AS DRYWALL
<br />CONSTRUCTION OR SPRAYED -ON LAYER. CHECK THAT DUCTS ARE INSTALLED IN SUCH A MANNER
<br />THAT THESE PROTECTIVE COVERINGS ARE NOT DAMAGED. CHECK THAT CLEARANCE FROM DUCTS
<br />TO COMBUSTIBLE CONSTRUCTION IS AS SPECIFIED. IN ADDITION, CHECK THAT WHERE DUCTS PASS
<br />THROUGH WALLS, FLOORS, OR PARTITIONS, THE OPENINGS IN CONSTRUCTION AROUND THE DUCTS ARE
<br />AS SPECIFIED.
<br />C. CHECK DUCT COVERINGS AND LININGS TO VERIFY THAT THEIR FIRE SAFETY REQUIREMENTS ARE
<br />AS SPECIFIED. CHECK THAT DUCT COVERINGS DO NOT CONCEAL ANY SERVICE OPENING.
<br />D. CHECK DIRECT ACCESS AND INSPECTION PROVISIONS. SERVICE OPENINGS AND TELESCOPING OR
<br />REMOVABLE DUCT SECTIONS ARE USED FOR DIRECT ACCESS AND INSPECTION. CHECK THAT A
<br />SERVICE OPENING ACCESS DOOR IS PROVIDED IN DUCTS AS SPECIFIED ADJACENT TO FIRE
<br />DAMPERS, SMOKE DAMPERS, AND SMOKE DETECTORS. CHECK THAT THESE ACCESS OPENINGS
<br />ARE IDENTIFIED WITH LETTERS AS SPECIFIED. CHECK THAT SERVICE OPENINGS ARE PROVIDED IN
<br />HORIZONTAL DUCTS AND PLENUMS WHERE SPECIFIED.
<br />E. CHECK AIR FILTERS TO VERIFY THAT THEY HAVE THE CLASSIFICATION SPECIFIED.
<br />F. CHECK THAT THE LOCATION, FIRE PROTECTION RATING, AND INSTALLATION OF FIRE, CEILING, AND
<br />SMOKE DAMPERS ARE AS SPECIFIED. GENERALLY, FIRE, CEILING, AND SMOKE DAMPERS SHOULD
<br />BE INSTALLED IN ACCORDANCE WITH THE CONDITIONS OF THEIR LISTING AND THE
<br />MANUFACTURER'S INSTALLATION INSTRUCTIONS THAT ARE SUPPLIED WITH THE DAMPER.
<br />FURTHER CHECK INSTALLATION BY REMOVING THE FUSIBLE LINK (WHERE APPLICABLE) AND
<br />OPERATE THE DAMPER TO VERIFY THAT IT FULLY CLOSES. IT IS DESIRABLE TO OPERATE DAMPERS
<br />WITH NORMAL AIR FLOW TO ENSURE THAT THEY ARE NOT HELD OPEN BY THE AIRSTREAM.
<br />REMEMBER TO REINSTALL ALL FUSIBLE LINKS THAT HAVE BEEN REMOVED DURING INSPECTION.
<br />4 CONTROLS
<br />a. CHECK MANUAL CONTROLS. CHECK THAT DEVICES FOR MANUAL ACTIVATION AND DEACTIVATION
<br />OF THE SMOKE CONTROL SYSTEM ARE OF MATERIALS AND INSTALLATION AS SPECIFIED.
<br />b. CHECK AUTOMATIC CONTROLS. CHECK THAT DEVICES FOR AUTOMATIC ACTIVATION AND
<br />DEACTIVATION AND CONTROL OF THE SMOKE CONTROL SYSTEM ARE OF MATERIALS AND
<br />INSTALLATION AS SPECIFIED.
<br />PROCEDURES FOR SMOKE -CONTROL SYSTEM TESTING
<br />1. BEFORE TESTING SMOKE -CONTROL SYSTEMS, VERIFY THAT CONSTRUCTION IS COMPLETE AND VERIFY HE
<br />INTEGRITY OF EACH SMOKE -CONTROL ZONE BOUNDARY. VERIFY THAT WINDOWS AND DOORS ARE
<br />CLOSED AND THAT APPLICABLE SAFING, GASKET, AND SEALANTS ARE INSTALLED. REPORT DEFICIENCIES
<br />AND POSTPONE TESTING UNTIL AFTER THE REPORTED DEFICIENCIES ARE CORRECTED. REFER TO
<br />INSPECTION PROCEDURES FOR SMOKE CONTROL.
<br />2. MEASURE AND RECORD WIND SPEED AND DIRECTION, OUTSIDE -AIR TEMPERATURE, AND RELATIVE
<br />HUMIDITY ON EACH TEST DAY.
<br />3. MEASURE, ADJUST, AND RECORD AIRFLOW OF EACH SMOKE -CONTROL FAN WITH ALL FANS THAT AREA PART
<br />OF THE SYSTEM OPERATING AS INTENDED BY THE DESIGN.
<br />4. MEASURE, ADJUST, AND RECORD THE AIRFLOW OF EACH FAN. FOR DUCTED SYSTEMS, MEASURE THE FAN
<br />AIRFLOW BY DUCT PITOT-TUBE TRAVERSE.
<br />5. MEASURE AND RECORD THE AIR FLOW VELOCITY THROUGH THE ATRIUM OUTSIDE DOORS.
<br />6. AFTER AIR BALANCING IS COMPLETE, PERFORM THE FOLLOWING PRESSURIZATION TESTING:
<br />a. VERIFY THE BOUNDARIES OF SMOKE -CONTROL ATRIUM ZONE.
<br />b. WITH THE HVAC SYSTEMS IN THEIR NORMAL MODE OF OPERATION AND SMOKE CONTROL NOT
<br />OPERATING, MEASURE AND RECORD THE PRESSURE DIFFERENCE ACROSS EACH SMOKE -CONTROL
<br />ARE OF THE ATRIUM. MAKE MEASUREMENTS AFTER CLOSING DOORS THAT SEPARATE THE AREAS.
<br />MAKE ONE MEASUREMENT ACROSS EACH DOOR. CLEARLY INDICATE THE HIGH AND LOW
<br />PRESSURE SIDE OF EACH DOOR.
<br />c. WITH THE SYSTEM OPERATING IN THE SMOKE -CONTROL MODE PERFORM THE FOLLOWING:
<br />1. MEASURE AND RECORD THE PRESSURE DIFFERENCE ACROSS EACH DOORTHAT SEPARATES THE
<br />SMOKE AREA FROM ADJACENT AREAS. MAKE MEASUREMENTS WITH DOORS THAT SEPARATE THE
<br />ATRIUM SMOKE ZONE FROM THE OTHER AREAS CLOSED. CLEARLY INDICATE THE HIGH AND LOW
<br />PRESSURE SIDE OF THE DOOR. DOORS THAT HAVE A TENDENCY TO OPEN SLIGHTLY DUE TO THE
<br />PRESSURE DIFFERENCE SHOULD HAVE ONE PRESSURE MEASUREMENT MADE WHILE HELD CLOSED
<br />AND ANOTHER MEASUREMENT MADE WITH THE DOOR OPEN.
<br />2. THE ATRIUM AREA PRESSURE SHOULD BE LOWER (NEGATIVE) WITH RESPECT TO EACH DOOR ON THE
<br />SMOKE AREA BOUNDARY.
<br />7. OPERATIONAL TESTS:
<br />a. CHECK THE PROPER ACTIVATION OF ATRIUM SMOKE -CONTROL SYSTEM IN RESPONSE TO ALL MEANS OF
<br />ACTIVATION, BOTH AUTOMATIC AND MANUAL.
<br />b. CHECK AND RECORD THE PROPER OPERATION OF FANS, DAMPERS, AND RELATED EQUIPMENT AS
<br />OUTLINED BELOW FOR THE ATRIUM SMOKE -CONTROL SYSTEM.
<br />1. SMOKE -CONTROL SYSTEM AUTOMATIC ACTIVATION.
<br />2. TYPE OF SIGNAL THAT ACTIVATES A SMOKE -CONTROL SYSTEM I.E. SMOKE DETECTOR.
<br />3. FANS "ON" AS REQUIRED TO IMPLEMENT THE SMOKE -CONTROL SYSTEM.
<br />4. FAN(S) "OFF" AS REQUIRED TO IMPLEMENT THE SMOKE CONTROL SYSTEM.
<br />5. DAMPERS "OPEN" WHERE MAXIMUM AIRFLOW MUST BE ACHIEVED.
<br />6. DAMPER(S) "CLOSED" WHERE NO AIRFLOW SHOULD TAKE PLACE.
<br />7. AUXILIARY FUNCTIONS TO ACHIEVE THE SMOKE -CONTROL SYSTEM CONFIGURATION SUCH AS
<br />CHANGES OR OVERRIDE OF NORMAL OPERATING PRESSURE AND TEMPERATURE -CONTROL SET
<br />POINTS.
<br />8. IF STANDBY POWER IS PROVIDED FOR THE SMOKE -CONTROL SYSTEM, TEST TO VERIFY THAT THE
<br />SYSTEM FUNCTIONS WHILE OPERATING UNDER BOTH NORMAL AND STANDBY POWER.
<br />9. CONDUCT ADDITIONAL TEST REQUIRED BY AUTHORITIES HAVING JURISDICTION. UNLESS REQUIRED
<br />BY AUTHORITIES HAVING JURISDICTION, PERFORM TESTING WITHOUT THE USE OF MOKE OR
<br />PRODUCTS THAT SIMULATE SMOKE.
<br />10, PREPARE A COMPLETE REPORT OF OBSERVATIONS, MEASUREMENTS, AND DEFICIENCIES.
<br />1
<br />SMOKE REMOVAL SEQUENCE:
<br />SMOKE SYSTEM CONTROL VERIFICATION
<br />1. CHECK FREE TRAVEL AND PROPER OPERATION OF CONTROL DEVICES SUCH AS DAMPER OPERATORS.
<br />2. CHECK THE SEQUENCE OF OPERATION OF CONTROL DEVICES. NOTE AIR PRESSURES AND DEVICE
<br />OSITIONS AND CORRELATE WITH AIRFLOW MEASUREMENTS. NOTE THE SPEED OF RESPONSE TO INPUT
<br />HANGES.
<br />3. CHECK THE INTERACTION OF ELECTRICALLY OPERATED SWITCH TRANSDUCERS.
<br />4. CHECK THE INTERACTION OF INTERLOCK AND LOCKOUT SYSTEMS.
<br />5. RECORD VOLTAGES OF POWER SUPPLY AND CONTROLLER OUTPUT. DETERMINE WHETHER THE SYSTEM
<br />OPERATES ON A GROUNDED OR NONGROUNDED POWER SUPPLY.
<br />6. NOTE OPERATION OF ELECTRIC ACTUATORS USING SPRING RETURN FOR PROPER FAIL-SAFE OPERATIONS.
<br />TOLERANCES
<br />1 SET HVAC SYSTEM AIRFLOW RATES WITHIN THE FOLLOWING TOLERANCES:
<br />a. FANS: 0 TO PLUS 10 PERCENT
<br />INSPECTIONS
<br />2 FINAL INSPECTION:
<br />a. AFTER INITIAL INSPECTION IS COMPLETE AND CHECKS VERIFIES THAT TESTING AND
<br />BALANCING ARE COMPLETE AND ACCURATELY DOCUMENTED IN THE FINAL REPORT,
<br />REQUEST THAT A FINAL INSPECTION BE MADE BY THE OWNER.
<br />b. SMOKE TESTING FIRM TEST AND BALANCE ENGINEER SHALL CONDUCT THE INSPECTION
<br />IN THE PRESENCE OF THE OWNER AND THE ARCHITECT AND CODE OFFICIALS.
<br />C. SMOKE TESTING FIRM SHALL RECHECK ALL MEASUREMENTS AND MAKE
<br />ADJUSTMENTS. REVISE THE FINAL REPORT AND BALANCING DEVICE SETTINGS TO
<br />INCLUDE ALL CHANGES AND RESUBMIT THE FINAL REPORT.
<br />FINAL REPORT
<br />1 GENERAL: TYPEWRITTEN, OR COMPUTER PRINTOUT IN LETTER -QUALITY FONT, ON STANDARD BOND
<br />PAPER, IN THREE-RING BINDER, TABULATED AND DIVIDED INTO SECTIONS BY TESTING AND BALANCED
<br />SYSTEMS.
<br />2 INCLUDE A CERTIFICATION SHEET IN FRONT OF BINDER SIGNED AND SEALED BY THE CERTIFIED TESTING
<br />ND BALANCING ENGINEER.
<br />a. NCLUDE A LIST OF INSTRUMENTS USED FOR PROCEDURES, ALONG WITH PROOF OF
<br />CALIBRATION,
<br />3 FINAL REPORT CONTENTS: IN ADDITION TO CERTIFIED FIELD REPORT DATA, INCLUDE THE FOLLOWING:
<br />a. FAN CURVES
<br />b. MANUFACTURER'S TEST DATA.
<br />C. FIELD TEST REPORTS PREPARED BY SYSTEM AND EQUIPMENT INSTALLERS.
<br />d. OTHER INFORMATION RELATIVE TO EQUIPMENT PERFORMANCE, BUT DO NOT
<br />INCLUDE SHOP DRAWINGS AND PRODUCT DATA.
<br />4 GENERAL REPORT DATA: IN ADDITION TO FORM TITLES AND ENTRIES, INCLUDE THE FOLLOWING DATA IN
<br />HE FINAL REPORT, AS APPLICABLE:
<br />a. TITLE PAGE
<br />b. NAME AND ADDRESS OF TAB FIRM
<br />C. PROJECT NAME
<br />d. PROJECT LOCATION
<br />e. ARCHITECT'S NAME AND ADDRESS
<br />f. ENGINEER'S NAME AND ADDRESS
<br />9. CONTRACTOR'S NAME AND ADDRESS
<br />h. REPORT DATE
<br />I. SIGNATURE OF TAB FIRM WHO CERTIFIES THE REPORT
<br />j. TABLE OF CONTENTS WITH THE TOTAL NUMBER OF PAGES DEFINED FOR EACH
<br />SECTION OF THE REPORT. NUMBER EACH PAGE IN THE REPORT.
<br />k. SUMMARY OF CONTENTS INCLUDING THE FOLLOWING:
<br />1 INDICATED VERSUS FINAL PERFORMANCE
<br />2 NOTABLE CHARACTERISTICS OF SYSTEMS
<br />3 DESCRIPTION OF SYSTEM OPERATION SEQUENCE IF IT VARIES FROM THE
<br />CONTRACT DOCUMENTS
<br />I. NOMENCLATURE SHEETS FOR EACH ITEM OF EQUIPMENT
<br />M. DATA FOR TERMINAL UNITS, INCLUDING MANUFACTURER, TYPE SIZE, AND FITTINGS
<br />n. NOTES TO EXPLAIN WHY CERTAIN FINAL DATA IN THE BODY OF REPORTS VARIES FROM
<br />INDICATED VALUES
<br />o. TEST CONDITIONS FOR FANS INCLUDING THE FOLLOWING:
<br />1 SETTINGS FOR OUTSIDE AIR AND SMOKE DAMPERS
<br />2 FAN DRIVE SETTINGS INCLUDING SETTINGS AND PERCENTAGE OF'MAXIMUM PITCH
<br />DIAMETER
<br />5 OTHER SYSTEMS OPERATING CONDITIONS THAT AFFECT PERFORMANCE
<br />6 FAN TEST REPORTS: INCLUDE THE FOLLOWING:
<br />a. FAN DATA:
<br />1 SYSTEM IDENTIFICATION
<br />2 LOCATION
<br />3 MAKE AND TYPE
<br />4 MODEL NUMBER AND SIZE
<br />5 MANUFACTURER'S SERIAL NUMBER
<br />6 ARRANGEMENT AND CLASS
<br />7 SHEAVE MAKE, SIZE IN INCHES, AND BORE
<br />8 SHEAVE DIMENSIONS, CENTER -TO -CENTER, AND A10OUNT OF ADJUSTMENTS IN
<br />INCHES
<br />b. MOTOR DATA-
<br />1 MAKE AND FRAME TYPE AND SIZE
<br />2 HORSEPOWER AND RPM
<br />3 VOLTS, PHASE, AND HERTZ
<br />4 FULL -LOAD AMPERAGE AND SERVICE FACTOR
<br />5 SHEAVE MAKE, SIZE IN INCHES, AND BORE
<br />6 SHEAVE DIMENSIONS, CENTER -TO -CENTER, AND AMOUNT OF ADJUSTMENTS IN
<br />INCHES
<br />7 NUMBER OF BELTS, MAKE, AND SIZE
<br />C. TEST DATA (INDICATED AND ACTUAL VALUES):
<br />1 TOTAL AIRFLOW RATE IN CFM
<br />2 TOTAL SYSTEM STATIC PRESSURE IN INCHES WG
<br />3 FAN RPM
<br />4 DISCHARGE STATIC PRESSURE IN INCHES WG
<br />5 SUCTION STATIC PRESSURE IN INCHES WG
<br />1. ATRIUM SMOKE DETECTORS DETECTS SMOKE.
<br />2. FIRST FLOOR VESTIBULE DOORS AND DINING EXIST DOORS OPEN.
<br />3. KITCHEN MAKE-UP AIR / EXHAUST FANS SHUT DOWN.
<br />4. OUTSIDE AIR UNIT OAU-1 SHUTS DOWN.
<br />5. SMOKE REMOVAL FANS (SEF-1 & 2) MOTORIZED DAMPERS OPEN.
<br />PROVIDE END SWITCH TO INDICATE DAMPER OPEN POSITION FOR
<br />SMOKE FAN START.
<br />6. SMOKE REMOVAL FANS (SEF-1 & 2) ARE ACTIVATED. SMOKE
<br />REMOVAL FANS SHALL OPERATE UNTIL SHUT DOWN BY FIRE
<br />DEPARTMENT.
<br />7. THE FIRE ALARM PANEL SHALL HAVE A SMOKE OVERRIDE
<br />COMMAND TO ACTIVATE THE SMOKE REMOVAL SEQUENCE MANUALLY.
<br />THE FIRE ALARM PANEL SHALL DEACTIVATE THE SMOKE REMOVAL
<br />SYSTEM AND SET THE HVAC CONTROLS TO NORMAL OPERATION.
<br />NOTE: PROVIDE CONTROLS, RELAYS, SWITCHES, POWER, AND
<br />ACCESSORIES FOR AN OPERATIONAL SMOKE CONTROL SYSTEM.
<br />COORDINATE WITH A FIRE ALARM CONTRACTOR FOR INTERFACE
<br />COMPONENTS.
<br />FREDERICK MUSCATELLO, PE
<br />FL PE # 62451
<br />PO Box 941168
<br />MAITLAND, FL 32794-1168
<br />PH. 407-748-4348
<br />EMAIL: fredOfcmengineering.com
<br />v
<br />t
<br />U
<br />r�
<br />z
<br />O
<br />N
<br />H
<br />z
<br />o
<br />uo
<br />F�
<br />uo
<br />U
<br />FA
<br />rA
<br />�
<br />O
<br />w
<br />0
<br />o
<br />O
<br />0
<br />O
<br />x
<br />v
<br />C
<br />w
<br />O
<br />N
<br />m
<br />C
<br />0
<br />0
<br />0
<br />o
<br />41
<br />0
<br />°�°
<br />0
<br />0
<br />w
<br />a
<br />a
<br />N
<br />•• �
<br />Y
<br />U
<br />w
<br />J
<br />W
<br />W
<br />W
<br />N
<br />U
<br />Q
<br />W
<br />S
<br />U
<br />z
<br />0
<br />Q
<br />U
<br />a
<br />w
<br />1
<br />1
<br />rim
<br />0
<br />Q
<br />V
<br />O
<br />project no.
<br />drawn
<br />by:
<br />2006-068.00
<br />date:
<br />checked by:
<br />NOV , 2006
<br />scale:
<br />approved by:
<br />sheet no.
<br />M 1.3.0
<br />0 L
<br />!.
<br />C N
<br />.N
<br />co 0
<br />•� 3
<br />,C
<br />>,0
<br />0)o
<br />.CC
<br />0
<br />cc
<br />L. C
<br />0 0
<br />C U
<br />- 'D
<br />�+ C
<br />O N
<br />C
<br />o 0
<br />t 0
<br />t9
<br />.E
<br />_C ,o
<br />L 0
<br />(D+L+
<br />O
<br />0 N
<br />U C
<br />z 0
<br />4�
<br />O N
<br />CL
<br />0 >
<br />N >'
<br />.8 C
<br />+I c0
<br />0 `�
<br />C 0
<br />>,'
<br />M N 1 ,
<br />E ILE
<br />-0 0
<br />C
<br />c� 0
<br />J0
<br />J :3
<br />N E
<br />W a)
<br />Q 4--
<br />U 0
<br />N
<br />O.0
<br />U),
<br />U)a
<br />Q C
<br />wro
<br />Y 0
<br />0.
<br />2L
<br />J C
<br />L 0
<br />w
<br />0
<br />F :t I
<br />U) C
<br />,a 0
<br />O U
<br />C
<br />aN
<br />0 O
<br />a.
<br />N to
<br />.CC
<br />N
<br />0 E
<br />(0 �
<br />� N I
<br />Cn L
<br />W 10
<br />0
<br />C
<br />W
<br />0 C
<br />30
<br />a
<br />0
<br />'C N
<br />C
<br />0 �
<br />U C
<br />�Q
<br />•C_
<br />� L
<br />c� 0
<br />E i
<br />�C
<br />4 N
<br />0 N
<br />C 0
<br />f6 U
<br />c0
<br />L
<br />C C
<br />0 0
<br />Cu
<br />41 �, t
<br />;C I.
<br />0
<br />.N
<br />N C
<br />0) N
<br />N '0
<br />L -0
<br />� N
<br />C U
<br />C U)0
<br />c4 N
<br />0 0
<br />0
<br />Cam.;-
<br />c 0
<br />cc a
<br />a U
<br />N N
<br />O
<br />>
<br />N
<br />Cn
<br />0 N
<br />C
<br />� 3
<br />L m
<br />Q CD
<br />rn 0..
<br />�N
<br />C t
<br />04.2
<br />LO ab �A-
<br />E
<br />MC
<br />c
<br />c o
<br />0 J M
<br />00Ut I
<br />0) 3
<br />Coo Q
<br />Ci U) o I
<br />�Q a
<br />._ w
<br />2 ►Y- o
<br />UQa)
<br />_=m
<br />�j IJi 0
<br />0.
<br />I- a
<br />QQo
<br />L
<br />O 0
<br />co0V
<br />Q O b
<br />N F- E
<br />L � I
<br />Q Qo
<br />=Ca�i
<br />J N+
<br />U- �
<br />0_•cE�
<br />� 3 �
<br />< cn fA
<br />I- In N
<br />a�
<br />�aXiU)
<br />(0 a)
<br />oN
<br />N 4� Rf
<br />0 0
<br />L 0
<br />m '
<br />Cl m
<br />U aQ
<br />4
<br />61
<br />
|