Laserfiche WebLink
GENERAL NOTES SPECIAL INSPECTIONS <br />DESIGN CRITERIA AND LOADS: 1. SPECIAL INSPECTIONS ARE REQUIRED ON THIS PROJECT PER CHAPTER 17 OF THE INTERNATIONAL <br />GOVERNING CODES BUILDING CODE. <br />2. OWNER SHALL CONTACT THE STRUCTURAL ENGINEER OF RECORD FOR COPY OF STATEMENT OF <br />2020 FBC, 7TH ED. SPECIAL INSPECTIONS WHICH OUTLINES REQUIRED INSPECTIONS, <br />ASCE STANDARD 7-16 "MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES" 3. THE OWNER SHALL EMPLOY ONE OR MORE SPECIAL INSPECTORS OR TESTING AGENCIES TO <br />PROVIDE SPECIAL INSPECTIONS AS DESCRIBED HEREIN. THE OWNER SHALL BE RESPONSIBLE FOR <br />AISC "MANUAL OF STEEL CONSTRUCTION", FIFTEENTH EDITION THE FEES AND COSTS RELATED TO THE PERFORMANCE OF SPECIAL INSPECTION SERVICES. <br />ACI STANDARD 318-14 "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE" 4, REFERENCE PROJECT SPECIFICATIONS FOR ANY ADDITIONAL INSPECTION REQUIREMENTS. <br />OSHA, OCCUPATIONAL SAFETY AND HEALTH REGULATIONS (STANDARDS - 29 CFR PART 1910) <br />ASTM STANDARDS IN BUILDING CODES, VOLUME I AND II, LATEST EDITION <br />AWS, AMERICAN WELDING SOCIETY STRUCTURAL WELDING CODE, AWS D1.1, LATEST EDITION <br />DESIGN LOADS <br />1. LIVE LOADS (LU <br />A. FLOOR LIVE LOAD: <br />100 PSF <br />2. SNOW LOAD: <br />NOT APPLICABLE <br />3. EQUIPMENT LOADS: <br />95.92 KIPS (TOTAL WEIGHT) <br />(REF KRONES DRAWING K-442-502-DBO, REVISION <br />AO) <br />A. BLOWING MODULE: <br />76.56 KIPS <br />MAX FLOOR LOAD PER SUPPORT: <br />25.52 KIPS <br />B. HEATING MODULE: <br />19,36 KIPS <br />MAX FLOOR LOAD PER SUPPORT: <br />6.47 KIPS <br />4. WIND LOADS (W): <br />a. GOVERNING CODE: <br />ASC - 6 <br />b. BUILDING RISK CATEGORY: <br />c. BASIC WIND SPEED (3-SEC GUST), V: <br />137 PH <br />d. WIND EXPOSURE CLASSIFICATION: <br />C <br />e. INTERNAL PRESSURE COEFFICIENT: <br />±0.18 <br />f. COMPONENTS AND CLADDING: <br />20 PSF <br />5. SEISMIC LOADS (E): <br />a. GOVERNING CODE: <br />ASCE 7-16 <br />b. BUILDING RISK CATEGORY: <br />II <br />c. le (SEISMIC IMPORTANCE FACTOR): <br />1.0 <br />d, Ss (0.2 SEC SPECTRAL ACCELERATION): <br />0.058 <br />e. S1 (1,0 SEC SPECTRAL ACCELERATION): <br />0,032 <br />f. SOIL SITE CLASSIFICATION: <br />E <br />g. SPECTRAL RESPONSE COEFFICIENTS: <br />SDS = 0,092/ SD1 = 0.089 <br />h. SEISMIC DESIGN CATEGORY: <br />B <br />i. BASIC SEISMIC -FORCE RESISTING SYSTEM: <br />STEEL SPECIFICALLY NOT DESIGNED <br />FOR SEISMIC <br />j. Cs (SEISMIC RESPONSE COEFFICIENT): <br />5 <br />k. R (RESPONSE MODIFICATION FACTOR): <br />3.0 <br />m. ANALYSIS PROCEDURE USED: <br />EQUIVALENT LATERAL FORCE PROCEDURE <br />6. ICE LOADS: <br />NOT APPLICABLE <br />7, FLOOD LOADS: <br />NOT APPLICABLE <br />8. SPECIAL LOADS: NOT APPLICABLE <br />9. FUTURE LOADS: UNLESS SPECIFICALLY NOTED, THERE ARE NO PROVISIONS MADE FOR FUTURE <br />FLOOR, ROOF, OR OTHER LOADS. <br />GENERAL <br />1. WHERE REFERENCE IS MADE WITHIN THESE GENERAL NOTES, DESIGN DRAWINGS, OR <br />SPECIFICATIONS TO "OWNER'S REPRESENTATIVE", SUCH REFERENCE SHALL REFER: FIRST TO <br />THE OWNER, SECOND TO THE DESIGN ENGINEER, AND THIRD TO A REPRESENTATIVE APPOINTED <br />BY THE OWNER OR DESIGN ENGINEER. <br />2. WHERE A SECTION IS SHOWN FOR ONE CONDITION, IT SHALL APPLY TO ALL LIKE AND SIMILAR <br />CONDITIONS. <br />3, WHERE REFERENCE IS MADE WITHIN THESE GENERAL NOTES, DESIGN DRAWINGS, OR PROJECT <br />SPECIFICATIONS TO TRADE NAME PRODUCTS OR MANUFACTURER'S NAMES, SUCH REFERENCES <br />ARE MADE TO DESIGNATE AND IDENTIFY QUALITY OF MATERIAL TO BE FURNISHED, ALL "OR <br />EQUAL" MATERIAL SUBSTITUTIONS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE, <br />4, ANY APPARENT CONFLICTS BETWEEN PLANS, SECTIONS, DETAILS, OR SPECIFICATIONS SHALL BE <br />BROUGHT TO THE ATTENTION OF OWNER'S REPRESENTATIVE IMMEDIATELY FOR CLARIFICATION <br />AND WRITTEN RESOLUTION. <br />5, PRIOR TO COMMENCEMENT OF WORK, INCLUDING DETAILING, CONTRACTOR SHALL FIELD VERIFY <br />ALL INDICATED RELEVANT DIMENSIONS OF EXISTING STRUCTURES, ELEVATIONS, EXISTING <br />MEMBER SIZES, AND EXISTING CONDITIONS. CONTRACTOR SHALL NOTIFY THE OWNER'S <br />REPRESENTATIVE OF ANY INTERFERENCE. <br />6, THE STRUCTURE SHOWN HEREIN HAS BEEN DESIGNED TO RESIST LOADS ONLY AS A COMPLETED <br />STRUCTURE. APPLICATION OF CONSTRUCTION LOADS TO THE PARTIALLY COMPLETED <br />STRUCTURE SHALL BE CONSIDERED BY THE CONTRACTOR AND SO INCLUDED IN THE DESIGN OF <br />SHORING, BRACING, FORMWORK, AND OTHER SUPPORTING ELEMENTS PROVIDED FOR <br />CONSTRUCTION OF THE STRUCTURE. <br />7, THE DESIGN, ADEQUACY, AND SAFETY OF ERECTION BRACING, TEMPORARY SUPPORTS, ETC, IS <br />THE SOLE RESPONSIBILITY OF THE CONTRACTOR. <br />8. PROVIDE ADEQUATE STRUCTURAL FRAMING AS APPROVED BY THE ENGINEER FOR ALL <br />REQUIRED MECHANICAL OPENINGS THROUGH SLABS, WALLS, FLOOR DECK, ETC. SUPPORT ALL <br />MECHANICAL EQUIPMENT, OPENING SHALL NOT BE PERMITTED THROUGH STRUCTURAL MEMBERS <br />UNLESS SPECIFICALLY DETAILED BY THE ENGINEER. <br />9. UNDERGROUND FACILITIES NOT SHOWN ON EXISTING DRAWINGS MAY EXIST, THE CONTRACTOR <br />SHALL PROCEED WITH CAUTION DURING DEMOLITION AND/OR NEW CONSTRUCTION. UNIDENTIFIED <br />PIPES, CABLES OR OTHER ITEMS ENCOUNTERED SHALL BE REPORTED IMMEDIATELY TO THE <br />OWNER'S REPRESENTATIVE AND DISPOSITION MADE AS DIRECTED. <br />10. FIT -UP OF ALL NEW CONSTRUCTION TO ANY AND ALL EXISTING CONSTRUCTION SHALL BE THE <br />CONTRACTOR'S RESPONSIBILITY. <br />5. UPON COMPLETION OF ALL SPECIAL INSPECTIONS AND TESTING, THE STRUCTURAL ENGINEER OF <br />RECORD SHALL SUBMIT TO THE OWNER A FINAL REPORT OF SPECIAL INSPECTIONS. <br />FOUNDATIONS <br />1. THE OWNER'S REPRESENTATIVE SHALL MONITOR ALL SITE PREPARATION, INCLUDING <br />EXCAVATION, SUB GRADE PREPARATION, AND BACKFILLING. ALL EARTHWORK SHALL BE BASED <br />ON THE APPLICABLE GEOTECHNICAL REPORT IF SUPPLIED BY THE OWNER'S REPRESENTATIVE. <br />THE CONTRACTOR SHALL OBTAIN A COPY OF THE REPORT FOR REVIEW AND A COPY SHALL BE <br />MAINTAINED IN THE FIELD OFFICE AT ALL TIMES. <br />2, ALL BACKFILL MATERIAL SHALL BE SOIL OR SOIL -ROCK MIXTURE THAT IS FREE FROM ORGANIC <br />MATTER OR OTHER DELETERIOUS SUBSTANCE. BACKFILL SHALL CONTAIN NO ROCKS OR LUMPS <br />OVER 6 INCHES IN GREATEST DIMENSION. NOT MORE THAN 15% OF THE ROCKS SHALL BE <br />LARGER THAN 2,Y2" IN GREATEST DIMENSION. BACKFILL SHALL HAVE A LIQUID LIMIT LESS THAN <br />50, A PLASTICITY INDEX LESS THAN 30, AND A STANDARD PROCTOR MAXIMUM DRY DENSITY <br />(ASTM D698) OF AT LEAST 90 PCF. GENERALLY SOILS CLASSIFIED AS SM, SC, ML, OR CL <br />ACCORDING TO THE UNIFIED SOIL CLASSIFICATION SYSTEM ARE SUITABLE. ALL BACKFILL <br />MATERIAL SHALL BE APPROVED BY THE OWNER'S REPRESENTATIVE. <br />3. ALL BACKFILL SHALL BE COMPACTED AT MOISTURE CONTENTS WITHIN 3% OF THE STANDARD <br />PROCTOR OPTIMUM MOISTURE CONTENT. IF WET CONDITIONS RESULT IN SUBSURFACE PUMPING <br />THE SUB GRADE SHALL BE STABILIZED BY MEANS APPROVED BY THE OWNER'S <br />REPRESENTATIVE, OR THE PUMPING MATERIAL SHALL BE REMOVED AND REPLACED WITH <br />APPROVED COMPACTED DRY BACKFILL, <br />4, ALL BACKFILL WITHIN THE LIMITS OF FOUNDATIONS SHALL BE PLACED IN LOOSE LIFTS OF 8 INCH <br />MAXIMUM THICKNESS AND COMPACTED TO NOT LESS THAN 95% OF STANDARD PROCTOR <br />MAXIMUM DRY DENSITY (ASTM D698). THE UPPER ONE FOOT OF BACKFILL MATERIAL SHALL BE <br />COMPACTED TO 98% COMPACTION, ADDITIONALLY THE UPPER 8 INCHES OF SUB GRADE <br />MATERIAL IN AREAS AT -GRADE OR CUT SURFACES SHALL BE SCARIFIED AND COMPACTED TO <br />98% COMPACTION. <br />5. ALL BACKFILL OUTSIDE THE LIMITS OF FOUNDATIONS AND PAVEMENTS SHALL BE PLACED IN <br />LOOSE LIFTS OF 8 INCH MAXIMUM THICKNESS AND COMPACTED TO NOT LESS THAN 95% OF <br />STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D698). <br />6. IN -PLACE COMPACTION TESTS AND MOISTURE CONTENT TESTS SHALL BE PERFORMED FOR EACH <br />VERTICAL FOOT OF BACKFILL PLACED WITH THE FOLLOWING TEST FREQUENCY: <br />a. PAVEMENT = 1 TEST PER 5000 SQUARE FEET. <br />b. STRUCTURES = 1 TEST PER 2000 SQUARE FEET. <br />c. ISOLATED FOOTINGS = 1 TEST PER LIFT, <br />7. ALL TESTS SHALL BE CONDUCTED BY AN INDEPENDENT TESTING LABORATORY APPROVED BY <br />THE OWNER'S REPRESENTATIVE, THE COST OF THE TESTS SHALL BE PAID BY THE OWNER, <br />8. ALL PIERS SHALL BE SUPPORTED ON SOIL WITH AN ALLOWABLE SOIL BEARING PRESSURE OF <br />2000 PSF. CONTRACTOR SHALL VERIFY CAPACITY OF ALL SHALLOW FOUNDATION <br />EXCAVATIONS WITH A HAND PENETROMETER OR MECHANICAL CONE PENETROMETER TEST PER <br />ASTM D 3441-05 PRIOR TO CONCRETE PLACEMENT TO ENSURE BEARING IN SUITABLY STRONG <br />AND STABLE SOILS. IF REQUIRED, OVER EXCAVATION OF UNSUITABLE MATERIAL AND <br />SUBSEQUENT BACKFILLING SHALL BE PERFORMED BY THE CONTRACTOR. <br />9. CONTRACTOR SHALL BE RESPONSIBLE FOR SHORING OF ALL FOUNDATION EXCAVATIONS PER <br />OSHA REGULATIONS. DESIGN OF ALL SHORING IS THE CONTRACTORS RESPONSIBILITY. <br />ANCHOR BOLTS AND OTHER EMBEDDED ITEMS <br />1. ALL ANCHOR BOLTS AND THREADED RODS SHALL CONFORM TO ASTM F1554-07ae1 AND SHALL <br />HAVE A MINIMUM STRENGTH OF 36KSI (UNLESS NOTED OTHERWISE), AND SHALL BE HOT -DIPPED <br />GALVANIZED PER ASTM A153-09. <br />2. THE LOCATION OF ANCHOR AND FOUNDATION BOLTS MUST NOT VARY FROM THE DIMENSIONS <br />SHOWN ON THE DESIGN DRAWINGS BY MORE THAN THE FOLLOWING: <br />a. %" CENTER TO CENTER OF ANY TWO BOLTS WITHIN AN ANCHOR BOLT GROUP. AN ANCHOR <br />BOLT GROUP IS DEFINED AS THE SET OF ANCHOR BOLTS THAT RECEIVES A SINGLE <br />FABRICATED STEEL SHIPPING PIECE. <br />b. %" CENTER TO CENTER OF ADJACENT BOLT GROUPS. <br />C. MAXIMUM ACCUMULATION OF PLUS -OR -MINUS Y" ALONG A MINIMUM 100 FOOT LONG <br />COLUMN LINE OF MULTIPLE ANCHOR BOLT GROUPS, <br />d. ELEVATION OF TOP OF ANCHOR BOLTS PLUS -OR -MINUS Y <br />3. ALL ANCHORS AND EMBEDDED ITEMS REQUIRED FOR ADJOINING WORK OR ITS SUPPORT SHALL <br />BE PLACED PRIOR TO CONCRETING. <br />CONCRETE <br />1, ALL CONCRETE DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH ACI STANDARD 318-14, <br />"BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE" (UNLESS NOTED OTHERWISE). <br />2. REFERENCE PROJECT SPECIFICATION OR OWNER'S SPECIFICATIONS FOR CAST -IN -PLACE CONCRETE IF <br />APPLICABLE. <br />3. MINIMUM ULTIMATE CONCRETE COMPRESSIVE STRENGTH (F'c) SHALL BE 4500 PSI IN 28 DAYS (UNLESS <br />NOTED OTHERWISE). <br />4, USE OF DIFFERENT CONCRETE CLASSES OF CONCRETE SHALL BE AS SHOWN BELOW, CONCRETE BATCH <br />DESIGN(S) SHALL BE PROPORTIONED AND PRODUCED IN ACCORDANCE WITH ACI 318-14 AND ACI 301-10. <br />SEE CONCRETE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS, MATERIAL PROPERTIES, AND <br />NECESSARY INSPECTIONS/TESTING. <br />F'c = 3000 PSI MINIMUM - ALL CONCRETE FOR SLABS OVER METAL DECK, RETAINING WALLS, <br />BEAMS, COLUMNS, AND FOOTINGS, AND ALL CONCRETE NOT SPECIFICALLY COVERED. <br />F'c = 4000 PSI MINIMUM - ALL CONCRETE FOR EXTERIOR GRADE SUPPORTED SLABS. <br />5. PORTLAND CEMENT SHALL CONFORM TO ASTM C150 TYPE I OR II. FLYASH SHALL BE LIMITED TO 100 <br />LBS. MAXIMUM PER CUBIC YARD OF CONCRETE. <br />6. AGGREGATES, BOTH COURSE AND FINE, SHALL CONFORM TO ASTM C33, MAXIMUM LARGE AGGREGATE <br />SIZE SHALL BE 1Y2" (UNLESS NOTED OTHERWISE), <br />7. CONCRETE MIX DESIGN SHALL ADHERE TO MINIMUM REQUIREMENTS FOR CONCRETE EXPOSURE CLASS F2 <br />AS SHOWN IN ACI 318-14 TABLE 19.3.2.1. <br />8. CONCRETE SLUMP RANGE SHALL BE: 3-5 INCHES FOR FOUNDATIONS, BEAMS, AND COLUMNS; AND 2-4 <br />INCHES FOR SLABS AND PAVEMENTS. <br />9. ALL CONCRETE SHALL BE AIR ENTRAINED. AIR ENTRAINING ADMIXTURE SHALL CONFORM TO ASTM C260. <br />AIR CONTENT SHALL BE IN ACCORDANCE WITH ACI 318-14 SECTION 193. <br />10. WATER -REDUCING, RETARDING, AND ACCELERATING ADMIXTURES SHALL CONFORM TO ASTM C494. <br />11, MAXIMUM CONCRETE WATER/CEMENT RATIO SHALL BE IN ACCORDANCE WITH ACI 318-14 SECTION 19.3. <br />12. CALCIUM CHLORIDE, THIOCYANATES, OR ADMIXTURES CONTAINING MORE THAN 0.5% CHLORIDE IONS ARE <br />NOT PERMITTED. <br />13. HOT WEATHER CONCRETING SHALL CONFORM TO ACI 305, LATEST EDITION. <br />14. COLD WEATHER CONCRETING SHALL CONFORM TO ACI 306, LATEST EDITION. <br />15. REINFORCING STEEL SHALL CONFORM TO THE LATEST STANDARDS OF ASTM A615, NEW BILLET STEEL, <br />GRADE 60. ALL REINFORCING SHALL BE DETAILED AND PLACED ACCORDING TO THE LATEST STANDARDS <br />OF THE AMERICAN CONCRETE INSTITUTE, REINFORCING STEEL SHALL BE FREE OF RUST, SCALE, OR ANY <br />OTHER FOREIGN MATERIAL PRIOR TO PLACING CONCRETE. <br />16. HOOKS SHOWN AT THE END OF REINFORCING BARS SHALL BE "STANDARD HOOKS" PER THE AMERICAN <br />CONCRETE INSTITUTE, UNLESS NOTED OTHERWISE ON THE DESIGN DRAWINGS. <br />17. REINFORCEMENT EMBEDMENT LENGTHS OR LAP SPLICES FOR REINFORCING SHOWN CONTINUOUS ON THE <br />DESIGN DRAWINGS SHALL BE AS FOLLOWS, UNLESS NOTED OTHERWISE. <br />BAR SIZE <br />CLASS "B" LAP <br />CLASS "B" LAP <br />EMBEDMENT <br />EMBEDMENT <br />SPLICE FOR <br />SPLICE FOR <br />(INCHES) <br />WITH STANDARD <br />DEFORMED <br />EPDXY <br />HOOK (INCHES) <br />PLAIN BAR <br />COATED BAR <br />(INCHES) <br />(INCHES) <br />#4 <br />25 <br />37 <br />19 <br />12 <br />#5 <br />31 <br />47 <br />24 <br />12 <br />#8 <br />62 <br />93 <br />48 <br />19 <br />SPLICE AND EMBEDMENT LENGTHS SHOWN ABOVE MUST BE INCREASED BY 30% FOR HORIZONTAL <br />REINFORCING WHERE THERE IS MORE THAN 12 INCHES OF CONCRETE BELOW THE BAR. <br />THE ABOVE TABLE IS BASED ON F'c = 4000 PSI CONCRETE, <br />ABSOLUTELY NO WELDING OF REINFORCING BARS OR TORCHING TO BEND REINFORCING BARS SHALL BE <br />ALLOWED. <br />18. WHEN REINFORCING IS CUT AT OPENINGS, ALL CUT REINFORCING SHALL BE MATCHED WITH <br />CORRESPONDING EXTRA BARS PLACED PROPORTIONATELY AT SIDES OF OPENING, THIS SHALL APPLY <br />TO ALL OPENINGS OVER 10 INCHES IN DIAMETER OR 10 INCHES SQUARE. THIS SHALL APPLY WHETHER <br />EXTRA REINFORCING IS SHOWN ON THE STRUCTURAL DRAWINGS OR NOT. THE RESULTANT BAR <br />SPACING SHALL BE A MINIMUM OF 3 INCHES, THE LENGTH OF THE EXTRA BARS SHALL BE AT LEAST THE <br />LENGTH OF THE OPENING PLUS TWICE THE SPLICE LENGTHS GIVEN IN THE TABLE ABOVE, <br />19. MINIMUM CONCRETE COVER FOR REINFORCING STEEL SHALL BE 2 INCHES (UNLESS NOTED OTHERWISE). <br />20. WHERE CONCRETE IS POURED DIRECTLY ON THE GROUND, MINIMUM CONCRETE COVER FOR REINFORCING <br />STEEL SHALL BE 3 INCHES (UNLESS NOTED OTHERWISE), <br />21. MINIMUM CONCRETE CLEAR COVER SHALL BE AS FOLLOWS: <br />INTERIOR SLABS ON GRADE - TOPS %" <br />INTERIOR SLABS ON GRADE - BOTTOM 2" <br />EXTERIOR SLABS ON GRADE - TOPS 11/2" <br />EXTERIOR SLABS ON GRADE - BOTTOM 2" <br />PIERS - TOPS 2" <br />PIERS - BOTTOM 3" <br />PIERS - SIDES 3" <br />OTHER COVER REQUIREMENTS SHALL BE AS NOTED IN APPLICABLE DETAILS OR AS SPECIFIED IN ACI <br />318-14. <br />22. MOISTURE BARRIER SHALL BE 6-MIL POLYETHYLENE FILM. SEAMS SHALL BE LAPPED A MINIMUM OF 12 <br />INCHES AND GLUED OR TAPED. <br />23. BONDING AGENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S PRINTED <br />INSTRUCTIONS. AGENTS SHALL BE AS FOLLOWS OR EQUAL: <br />ACRYLIC LATEX: <br />INTRALOK -- BY W. R. MEADOWS <br />ACRYL 60 -- BY THORO SYSTEMS <br />ACRYLBOND 60 -- BY LAMBERT <br />EPDXY: <br />SIKADUR 32 HI -MOD -- BY SIKA CORPORATION <br />MASTEREMACO ADH 326-- BY MASTER BUILDERS <br />P� LAND S�( i��// "Professional Certification. I hereby certify that these <br />6F <br />�\ 9p i� documents were prepared or approved by me, and that <br />zz No. 90224 I am a duly licensed professional engineer under the <br />laws of the <br />- o a <br />0 State of Florida, License No. 90224 <br />I <br />1 <br />REVISION <br />NO <br />CDC <br />O1/29/21 <br />Expiration Date: 2-08-23 <br />0 <br />ISSUE FOR CONSTRUCTION <br />CDC <br />01/22/21 <br />at�i9�il <br />REV. <br />DESCRIPTION <br />DRWN <br />APPR <br />DATE <br />REV. <br />DESCRIPTION <br />DRWN <br />APPR <br />DATE <br />DRAWING NO, <br />REFERENCE DRAWING <br />CONCRETE (CONTU <br />24, CONCRETE FORMWORK SHALL CONFORM WITH ACI 301-10 AND APPLICABLE SECTIONS OF ACI 347, <br />LATEST EDITION, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FORMWORK DESIGN, <br />25. ALL EXPOSED CONCRETE CORNERS SHALL HAVE A 3/4" BY 45 DEGREE CHAMFER. <br />26. BAR SUPPORT ACCESSORIES SHALL BE PROVIDED IN ACCORDANCE WITH THE LATEST ACI. MANUAL OF <br />STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES, EXCEPT THAT <br />REINFORCING SHALL BE CHAIRED ON THE BOTTOM AND/OR SIDES ON BOLSTERS SPACED NOT MORE <br />THAN 4 FEET ON CENTER. BAR SUPPORTS FOR CONCRETE EXPOSED TO VIEW SHALL HAVE PLASTIC <br />COATED LEGS. BAR SUPPORTS SHALL BE LOCATED AGAINST THE OUTERMOST BAR. <br />27. FOR GRADE SUPPORTED SLABS, SLAB REINFORCING SHALL BE HELD IN PLACE BY BAR SUPPORTS AND <br />ACCESSORIES AS DESCRIBED IN CHAPTER 3 OF THE CRSI MANUAL OF STANDARD PRACTICE. BAR <br />SUPPORTS SHALL BE SPACED A MAXIMUM OF 4'-0" O.C. BOTH WAYS IN STRAIGHT LINES ON THE MESH <br />GRID. NO ROCKS, CMU, CLAY, TILE, OR BRICK SHALL BE USED TO SUPPORT REINFORCING. <br />28, INSTALL CORNER BARS AT JUNCTION OF ALL FOUNDATION WALLS, GRADE BEAMS, AND FOOTINGS. <br />29. ALL ITEMS EMBEDDED IN CONCRETE SHALL BE TIED AND SECURED PRIOR TO PLACEMENT OF CONCRETE. <br />NO "WET STICKING" IS ALLOWED. <br />30, ALL CONCRETE WORK SHALL CONFORM WITH THE FOLLOWING: <br />ACI 318-14 "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" <br />ACI 301-10 "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS" <br />CRSI "MANUAL OF STANDARD PRACTICE" <br />31. PRIOR TO PLACING CONCRETE, THE CONTRACTOR SHALL VERIFY SIZE AND LOCATION OF ALL ANCHOR <br />BOLTS, EMBEDDED ITEMS, OPENINGS, ETC, WITH THE LATEST CERTIFIED INFORMATION, INCLUDING <br />APPLICABLE EQUIPMENT DRAWINGS. ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S <br />REPRESENTATIVE BEFORE COMMENCING CONCRETE PLACEMENT. ALL AREAS TO RECEIVE CONCRETE <br />SHALL BE INSPECTED AND APPROVED BY OWNER'S REPRESENTATIVE PRIOR TO POURING OF <br />CONCRETE, <br />32. CONCRETE SHALL BE TRANSPORTED FROM THE MIXER TO THE PLACE OF FINAL DEPOSIT BY METHODS <br />THAT PREVENT SEGREGATION OR LOSS OF INGREDIENTS AND DISPLACEMENT OF STEEL. CONCRETE <br />MUST BE PLACED WITHIN 1Y HOURS AFTER ADDITION OF MIX WATER. NO WATER SHALL BE ADDED TO <br />CONCRETE AFTER SLUMP TESTS HAVE BEEN PERFORMED, <br />33. DURING AND IMMEDIATELY AFTER PLACING, CONCRETE SHALL BE THOROUGHLY COMPACTED BY <br />MECHANICAL VIBRATION, AS APPROVED BY OWNER'S REPRESENTATIVE, TO PROVIDE A DENSE <br />CONCRETE FREE OF HONEYCOMBING, <br />34, CONSTRUCTION JOINTS AND POINTS OF ENDING A CONCRETE POUR SHALL BE AS SHOWN ON THE <br />DRAWINGS OR AS OTHERWISE DIRECTED BY THE OWNER'S REPRESENTATIVE. <br />35. ALL CONSTRUCTION JOINTS SHALL BE THOROUGHLY CLEANED AND FREE OF LAITANCE BEFORE THE <br />SECOND POUR IS MADE AGAINST THE FIRST POUR. <br />36. EXTERIOR SLABS AND INTERIOR SLABS IN WET AREAS SHALL RECEIVE A LIGHT BROOM FINISH. <br />INTERIOR SLABS IN VERY DRY AREAS SHALL RECEIVE A STEEL TROWEL FINISH. <br />37. FLOOR FLATNESS AND FLOOR LEVELNESS SHALL BE AS FOLLOWS: <br />SPECIFIED FLOOR FLATNESS AND LEVELNESS FF45/FL35 <br />MINIMUM LOCAL FLOOR FLATNESS/LEVELNESS FF35/FL25 <br />38. PREMOLDED EXPANSION JOINT MATERIAL SHALL CONFORM TO THE REQUIREMENTS OF ASTM D994 AND <br />D1751. <br />39. JOINT SEALANT MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S <br />PRINTED INSTRUCTIONS. JOINT SEALANTS SHALL BE AS FOLLOWS OR EQUAL: <br />POLYURETHANE 2 COMPONENT = MM-80 SEM-RIGID EPDXY JOINT FILLER -- BY METZGER McGUIRE <br />POLYURETHANE 2 COMPONENT = SIKAFLEX 2C NS/SL -- BY SIKA CORPORATION <br />COAL/TAR URETHANE = GARDOX -- BY W. R. MEADOWS <br />40. CONCRETE SLABS SHALL BE CURED FOR SEVEN (7) DAYS AS OUTLINED IN ACI 308, LATEST EDITION. <br />41. FOR SLAB SURFACES NOT SCHEDULED TO RECEIVE FLOORING, IMMEDIATELY AFTER SEVEN (7) DAYS <br />WET CURE, APPLY ONE (1) COAT SEALHARD CHEMICAL HARDENER AS MANUFACTURED BY L&M <br />CONSTRUCTION CHEMICALS OR APPROVED EQUAL. APPLICATION OF HARDENER TO CONFORM WITH THE <br />MANUFACTURER'S WRITTEN RECOMMENDATIONS. <br />42. DIRECTLY AFTER FORMS HAVE BEEN REMOVED, ALL EXPOSED TIE WIRES AND STAPLED ENDS SHALL <br />BE REMOVED BELOW THE CONCRETE SURFACE FROM EXPOSED CONCRETE SURFACES. CUT TIES FLUSH <br />WITH CONCRETE SURFACES FROM NON -EXPOSED CONCRETE SURFACES. RUB SMOOTH OR CUT OFF FINS <br />AND ROUGH PLACES, REMOVE ALL LOOSE CONCRETE AND OTHER IRREGULARITIES WITH CEMENT <br />MORTAR. ON SURFACES TO BE EXPOSED, CORNERS AND ARISES SHALL BE STRAIGHT AND TRUE. AN <br />APPROVED BONDING AGENT SHALL BE USED FOR PATCHING AND FILLING. <br />43. CONCRETE SHALL BE SAMPLED IN ACCORDANCE WITH ASTM C172-04. TEST CYLINDERS SHALL BE <br />MADE IN ACCORDANCE WITH ASTM C31 AND TESTED IN ACCORDANCE WITH ASTM C39. SLUMP TESTS <br />SHALL BE PERFORMED IN ACCORDANCE WITH ASTM C143. AIR CONTENT SHALL BE MEASURED IN <br />ACCORDANCE WITH ASTM C173 OR C231, CONCRETE TEMPERATURE SHALL BE MEASURED IN <br />ACCORDANCE WITH ASTM C1064, ALL TESTING SHALL BE PERFORMED BY AN INDEPENDENT TESTING <br />AGENCY PER ASTM E329. THE CONTRACTOR SHALL PAY THE COST OF THE INDEPENDENT TESTING <br />AGENCY. <br />44, A MINIMUM OF 4 TEST CYLINDERS SHALL BE TAKEN FROM EACH DAY OF CONCRETE PLACEMENT OR <br />ONCE FOR EACH 100 CUBIC YARDS OF CONCRETE PLACED. ONE TEST CYLINDER SHALL BE TESTED AT <br />SEVEN DAYS (3 DAYS FOR HIGH EARLY STRENGTH) FOR INFORMATION. TWO TEST CYLINDERS SHALL <br />BE TESTED AT TWENTY-EIGHT DAYS (7 DAYS FOR HIGH EARLY STRENGTH) FOR ACCEPTANCE, ONE <br />TEST CYLINDER SHALL BE HELD AS A SPARE. <br />45, THE CONTRACTOR SHALL MAINTAIN A WRITTEN RECORD FOR EACH BATCH OF CONCRETE DELIVERED TO <br />THE JOB SITE. THESE RECORDS SHALL INCLUDE DATE AND TIME OF DELIVERY, WEATHER CONDITIONS, <br />TRUCK NUMBER, LOCATION OF PLACEMENT, CUBIC YARDS, TIME AND AMOUNT OF WATER INTRODUCED <br />INTO MIX, MAXIMUM SIZE AGGREGATE, AND TYPE AND AMOUNT OF ANY ADMIXTURES. ALL RECORDS <br />MAINTAINED ARE SUBJECT TO REVIEW BY THE OWNER'S REPRESENTATIVE. <br />NON -SHRINK GROUT <br />1. ALL GROUT SHALL BE NON -SHRINK, GROUT SHALL BE MIXED AND PLACED IN STRICT ACCORDANCE <br />WITH THE MANUFACTURER'S PRINTED INSTRUCTIONS AND AS NOTED ON DESIGN DRAWINGS. GROUT <br />SHALL BE PLACED IN SUCH A MANNER AS TO PROVIDE FULL BEARING AND NO VOIDS UNDER PLATES. <br />2, NON -SHRINK CEMENT BASED GROUT SHALL BE USED, IN CHEMICALLY BENIGN ENVIRONMENTS, UNDER <br />STRUCTURAL BASE PLATES AND AROUND PIPE SLEEVES AND DRAINS, SAID GROUT SHALL HAVE A <br />MINIMUM 7 DAY COMPRESSIVE STRENGTH OF 5000 PSI AND SHALL MEET THE REQUIREMENTS OF ASTM <br />C109, C827, C1090, C1107, AND CORPS OF ENGINEERS CRD-C621. <br />DRAWN DATE <br />CDC 01/22/21 <br />CHECKED DATE <br />DBC 01/22/21 <br />SUPERVISOR DATE <br />ALLIANCE <br />AJD 01/22/21 <br />Baltimore, MD Newport News, VA <br />(410)636-9555 (737)599-3300 <br />PROJECT ENGINEER DATE <br />LAS 01/22/21 <br />Richmond, VA <br />(804)275-1404 <br />OWNERS APPROVAL DATE <br />CITY �' L <br />ALL WORK SHALL COMPLY WITH PREVAILING <br />CODES FLORIDA BUILDING CODE, <br />NATIONAL ELECTRIC CODE, <br />AND THE CITY OF ZEPHYRHILLS <br />ORDINANCES <br />NESTLE WATERS <br />ZEPHYRHILLS, FL <br />STRUCTURAL <br />GENERAL NOTES <br />AS NOTED <br />2002160040 <br />2160040-SOOl.dwg <br />DRAWING NO. <br />2160040-SO01 <br />EV. <br />1 <br />go <br />