VENDOR CONTACT REQUIREMENTS VER.8.14.07-6
<br />CONTRACTOR IS RESPONSIBLE, UPON AWARD, TO CONTACT AND VERIFY ALL DELIVERIES DATES/TIMES WITH EVERY
<br />VENDOR FURNISHING EQUIPMENT OR SERVICES, OR TO CHANGE ANY DATES OR DELIVERIES, CONTRACTOR MUST CONTACT
<br />WALMART CONSTRUCTION MANAGER LISTED BELOW. VENDOR CONTACT INFORMATION IS AVAILABLE IN THE GCC EQUIPMENT
<br />PLATFORM AND IN THE PROJECT SPECIFICATIONS. THIS IS UNIQUE TO CAPITAL EXPENDITURES PROJECTS.
<br />PROJECT VENDORS:
<br />97 WALL FIXTURES
<br />AES-CURB
<br />AES-SALVAGE
<br />HILL PHOENIX -CASES
<br />HUSSMANN-CASES
<br />KYSOR WARREN -CASES
<br />KYSOR WARREN -SYSTEMS
<br />LENNOX
<br />MCCUE
<br />NOVAR
<br />PARKER HANNIFIN-SPORLAN
<br />WALMART CONTACT LIST
<br />CONTACT PHONE AND/OR EMAIL TITLE
<br />WALMART SUPERCENTER #706 (813) 782-1957 STORE
<br />CARA SHERWOOD (479) 365-0207 WALMART PROJECT MANAGER
<br />cara.sherwood@walmart.com
<br />PERMITTING CONTACT LIST
<br />UPON NOTIFICATION OF CONTRACT AWARD, CONTRACTOR SHALL CONTACT THE ENGINEER OF RECORD'S PERMIT
<br />COORDINATOR REGARDING BUILDING PERMIT STATUS. CONTRACTOR SHALL NOT CONTACT AHJ PRIOR TO CONTACTING
<br />PERMIT COORDINATOR TO VERIFY BUILDING PERMIT STATUS. WHEN NECESSARY, THE CONTRACTOR SHALL DELIVER
<br />PERMIT PLAN SETS AND PAY PERMIT FEES TO THE AHJ IN ORDER TO RECEIVE CONSTRUCTION PERMITS. UPON REVIEW
<br />OF PROJECT SCOPE THE AHJ MAY REQUIRE THE CONTRACTOR TO COMPLETE ADDITIONAL PERMITTING REQUIREMENTS
<br />FOR OR SUBMIT ADDITIONAL PLAN SETS FOR REVIEW TO ADDITIONAL LOCAL, COUNTY, STATE, AND/OR FEDERAL
<br />AUTHORITIES WHICH MAY NOT BE LOCATED WITHIN THE LOCAL AHTS OFFICES. SUBMIT ANY PLAN REVIEW COMMENTS
<br />OR QUESTIONS THROUGH THE WALMART APPROVED RFI PROCESS. CONTRACTOR SHALL OBTAIN PERMIT(S) THE GREATER
<br />OF 10 WORKING DAYS OR 2 WEEKS PRIOR TO THE START OF CONSTRUCTION TO AVOID UNNECESSARY DELAYS AND
<br />ADDITIONAL ENGINEERING FEES. CONTRACTOR SHALL PICK UP AND PAY FOR ANY REQUIRED PERMIT(S) AND ALL
<br />ANCILLARY FEES. COST OF REQUIRED PERMIT(S) WILL BE DETERMINED AT THE TIME OF PERMIT ISSUANCE. EXACT
<br />AMOUNT SHALL BE COORDINATED WITH THE WALMART CONSTRUCTION MANAGER. CONTRACTOR SHALL EMAIL A COPY OF
<br />PERMIT(S) WHEN OBTAINED TO PERMIT COORDINATOR LISTED BELOW. CONTRACTOR SHALL UPLOAD A COPY OF
<br />PERMIT(S) WHEN OBTAINED TO EVOCO WORKSPACE SUPPORT FOLDER. UPON COMPLETION OF THE PROJECT,
<br />CONTRACTOR SHALL EMAIL APPROVED FINAL INSPECTION REPORT AND CERTIFICATE OF COMPLETION TO PERMIT
<br />COORDINATOR LISTED BELOW. UPON COMPLETION OF THE PROJECT, CONTRACTOR SHALL UPLOAD APPROVED FINAL
<br />INSPECTION REPORT AND CERTIFICATE OF COMPLETION TO EVOCO WORKSPACE SUPPORT FOLDER.
<br />CONTACT EMAIL PHONE
<br />APRIL NUZZO april.nuzzo@hendersonengineers.com (913) 742-5853
<br />NOTICE OF SPECIAL INSPECTIONS REQUIREMENT
<br />CONTRACTOR SHALL CONTACT PRE -APPROVED TESTING FIRM LISTED BELOW PRIOR TO CONSTRUCTION AND
<br />COORDINATE INSPECTION DATE(S). SPECIAL INSPECTIONS TESTING FIRM IS PROVIDED AND PAID BY OWNER.
<br />RE: SPECIFICATIONS SECTION 01457 AND APPENDIX B - TESTING, INSPECTION, AND OBSERVATION BY OWNER
<br />CONTRACTOR SHALL MAKE ALL TESTING AGENCY RECOMMENDED CORRECTIONS IMMEDIATELY UPON RECEIPT
<br />OF DEFICIENT TESTING REPORTS. CONTRACTOR SHALL NOTIFY STRUCTURAL ENGINEER OF RECORD WHEN
<br />DEFICIENCIES ARE CORRECTED AND METHOD OF CORRECTION. STRUCTURAL ENGINEER OF RECORD SHALL
<br />APPROVE CORRECTIONS AND/OR DETERMINE IF ADDITIONAL TESTING IS REQUIRED. CONTRACTOR SHALL
<br />ENSURE THAT ALL TESTING AGENCY OBSERVATION/TEST REPORTS ARE SENT IMMEDIATELY UPON INSPECTION
<br />COMPLETION TO:
<br />JOHNSTON BURKHOLDER ASSOCIATES AND HENDERSON ENGINEERS INCORPORATED
<br />ATTN: TREVOR WRIGHT Qba-hei@jbaengr.com) ATTN: TYLER DANFORTH (tyler.danforth@hendersonengineers.com)
<br />REFER TO STRUCTURAL SHEET(S) FOR ADDITIONAL INFORMATION
<br />TESTING FIRM CONTACT
<br />ECS MID -ATLANTIC LLC
<br />MICHAEL GALLI mgalli@ecslimited.com (757) 229-6677
<br />AIRFLOW BALANCING NOTE
<br />THE SCOPE OF WORK OF THIS PROJECT REQUIRES AIR FLOW BALANCING LIMITED TO THE AIR DISTRIBUTION DEVICES
<br />AND OUTSIDE AIR DAMPERS ON EQUIPMENT TO SPECIFIED AIR FLOWS INDICATED ON THE MECHANICAL PLANS. ALL OTHER
<br />TESTING, BALANCING AND STARTUP PROCEDURES FOR NEW RTU AND AHU EQUIPMENT INCLUDING SCHEDULED OUTSIDE
<br />AIR SHALL BE PERFORMED BY THE MANUFACTURER'S STARTUP/COMMISSIONING TECHNICIAN AND COORDINATED BY THE
<br />AWARDED CONTRACTOR. THE AWARDED CONTRACTOR SHALL CONTACT THE TEST & BALANCE FIRM LISTED BELOW TO
<br />SCHEDULE WHEN THE TEST & BALANCE FIRM IS TO ARRIVE ONSITE. THE PROPOSED DATE WILL BE COMMUNICATED TO
<br />THE WALMART CONSTRUCTION MANAGER DURING THE PRE -CONSTRUCTION MEETING. REPORTS SHALL BE SENT TO THE
<br />WALMART CONSTRUCTION MANAGER, WALMART PROJECT MANAGER AND THE EOR. FOR CONTACT INFORMATION IS
<br />TYLER DANFORTH (tyler.danforth@hendersonengineers.com) (913) 742-5369.
<br />REFERENCE SPECIFICATIONS SECTIONS 01455 AND APPENDIX B FOR ADDITIONAL AIR FLOW BALANCING INFORMATION.
<br />TEST AND BALANCE COMPANY NAME
<br />TEST AND BALANCE COMPANY (TABC)
<br />JOHN SKIPPER jskipper@tabconline.com (678) 393-9401
<br />SCOPE OF WORK SUMMARY
<br />NOTE: THE INTENT OF THIS SUMMARY IS TO ASSIST VENDORS IN
<br />IDENTIFYING EQUIPMENT NEEDS. IT IS NOT INTENDED FOR USE BY
<br />CONTRACTOR TO CAPTURE ALL SCOPE ISSUES. REFER TO PLANS
<br />AND SPECIFICATIONS (WHERE APPLICABLE) FOR ADDITIONAL
<br />INFORMATION.
<br />THIS IS A CAP-X COMBO PROJECT. REFER TO
<br />SPECIFICATIONS SECTION 1500 FOR ADDITIONAL INFORMATION
<br />REGARDING REQUIRED JOB SITE TEMPORARY FACILITIES AND
<br />STORMWATER RUNOFF CONTROL.
<br />REPLACE BUNKER ISLAND CASES WITH LIDS
<br />REPLACE 3-DECK CAKE CASES
<br />REPLACE MULTI -DECK BEER CASES
<br />REPLACE MULTI -DECK DAIRY CASES WITH DOORS
<br />REPLACE MULTI -DECK REAR -LOAD DAIRY CASES WITH DOORS
<br />REPLACE MULTI -DECK DELI CASES
<br />REPLACE MULTI -DECK DELI CASES WITH DOORS
<br />REPLACE MULTI -DECK MEAT CASES
<br />REPLACE REACH -IN FROZEN FOOD CASES
<br />REPLACE REACH -IN FROZEN SEAFOOD CASES
<br />REPLACE REACH -IN ICE CREAM CASES
<br />REPLACE SELF-SERV SEAFOOD CASE
<br />REPLACE DELI PROMO ISLAND
<br />REPLACE (2) 20 TON RTUs: 14,19
<br />REPLACE (1) 10 TON RTUs: 1
<br />REPLACE (9) 5 TON RTUs: 2,7,9,11,12,15,27,29,32
<br />REPLACE (7) 3 TON RTUs: 4,5,6,8,13,31,33
<br />REFURBISH RTUS (TURNKEY BY OWNER'S CONTRACTOR)
<br />(9) 20 TON RTUs - 16-18,22-26,35
<br />(5) 10 TON RTUs - 3,10,20,28,34
<br />(2) 5 TON RTUs - 21.30
<br />CODE COMPLIANCE
<br />ALL DRAWINGS ARE IN COMPLIANCE WITH THE FOLLOWING CODES:
<br />THE FLORIDA BUILDING CODE, 2020 EDITION
<br />THE FLORIDA FIRE CODE, 2020 EDITION
<br />THE FLORIDA MECHANICAL CODE, 2020 EDITION
<br />THE FLORIDA PLUMBING CODE, 2020 EDITION
<br />THE NATIONAL ELECTRICAL CODE, 2017 EDITION
<br />THE FLORIDA ENERGY CODE, 2020 EDITION
<br />1 y 1 ��
<br />D1.1 F1.1 BASR1 RD1.1
<br />1 1
<br />R1.1 RE1.1
<br />PROJECT
<br />SITE ADDRESS
<br />STREET:
<br />7631 GALL BLVD
<br />CITY:
<br />ZEPHYRHILLS
<br />STATE/ZIP:
<br />FLORIDA/32707
<br />COUNTY:
<br />PASCO
<br />tillaimart:;:
<br />REFRIGERATION HVAC/CAP=X COMBO
<br />REFERENCE
<br />T1 TITLE SHEET
<br />N1 RESPONSIBILITY MATRICES
<br />FIXTURE
<br />D1
<br />DEMOLITION PLAN
<br />D1.1
<br />REAR DEMOLITION PLAN
<br />F1
<br />FIXTURE PLAN AND SCHEDULES
<br />F1.1
<br />REAR FIXTURE PLAN
<br />F2
<br />FIXTURE DETAILS
<br />USMV=041403
<br />ZEPHYRHILLS, FL
<br />STORE # 706=1 001
<br />INDEX OF DRAWINGS
<br />STRUCTURAL
<br />S1 GENERAL NOTES AND EQUIPMENT REPLACEMENT DETAILS
<br />S2 ROOF FRAMING PLAN
<br />MECHANICAL
<br />M1 OVERALL MECHANICAL PLAN
<br />M1.1 ENLARGED MECHANICAL PLANS
<br />M1.2 ENLARGED MECHANICAL PLANS
<br />M2 MECHANICAL DETAILS
<br />M3 MECHANICAL SCHEDULES
<br />BAS1 HVAC BUILDING AUTOMATION SYSTEM PLAN
<br />BAS2 HVAC PARTIAL ONE -LINE DIAGRAM AND DETAILS
<br />BAS3 SEQUENCES OF OPERATIONS
<br />REFRIGERATION
<br />BASR1 REFRIGERATION BUILDING AUTOMATION SYSTEM PLAN
<br />BASR2 REFRIGERATION BUILDING AUTOMATION SYSTEM DETAILS
<br />BASR3 BUILDING AUTOMATION SYSTEM SCHEDULES
<br />RD1 FRONT REFRIGERATION DEMOLITION PLAN
<br />RD1.1 REAR REFRIGERATION DEMOLITION PLAN
<br />R1 FRONT REFRIGERATION PLAN
<br />R1.1 REAR REFRIGERATION PLAN
<br />R2 REFRIGERATION DETAILS
<br />R3 REFRIGERATION SCHEDULES
<br />R3.1 REFRIGERATION SCHEDULES
<br />R4 REFRIGERATION SUBMITTALS
<br />ELECTRICAL
<br />E1 POWER PLANS
<br />E2 PARTIAL ONE -LINE DIAGRAM, DETAIL, AND SCHEDULES
<br />E2.1 PANELBOARD SCHEDULES
<br />RE1 FRONT REFRIGERATION ELECTRICAL PLAN
<br />RE1.1 REAR REFRIGERATION ELECTRICAL PLAN AND DETAILS
<br />ALL WORK SHALL COMPLY WITH PREVAILING
<br />CODES FLORIDA BUILDING CODE,
<br />NATIONAL ELECTRIC CODE,
<br />AND THE CITY OF ZEPHYRHILLS
<br />ORDINANCES
<br />1
<br />REVIEW DATA:.._
<br />CITY DNG OFpCIALLS
<br />BUILD
<br />�- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --�
<br />I----------------------- I
<br />I� I
<br />II I
<br />II I I
<br />II
<br />II I I
<br />11 I i
<br />II
<br />II I I
<br />II I I
<br />II I
<br />I I
<br />------=----------------- I
<br />I' U
<br />II I i
<br />II I
<br />I' � I
<br />,�- - - - - - - - - - - - - - - - - - - - - - -�
<br />I
<br />I
<br />I � I
<br />I
<br />I
<br />L---------------------------------------------------------------------------_-_-----__------J
<br />KEY PLAN_
<br />1 1" = 40'-0"
<br />GENERAL REQUIREMENTS
<br />1.
<br />THE PLANS SHOWN THROUGHOUT THESE DOCUMENTS ARE
<br />15.
<br />OWNER SHALL OCCUPY THE BUILDING DURING CONSTRUCTION.
<br />BASED ON LIMITED INFORMATION PROVIDED BY OWNER AND A
<br />THE CONTRACTOR SHALL COORDINATE WITH STORE MANAGER
<br />LIMITED SITE OBSERVATION SURVEY; THE DESIGN
<br />AND THE OWNER'S MECHANICAL CONSTRUCTION MANAGER ALL
<br />PROFESSIONAL CANNOT BE HELD RESPONSIBLE FOR THE
<br />CONSTRUCTION PROCEDURES WHICH WILL INTERFERE WITH
<br />ACCURACY OF THE EXISTING CONDITIONS ILLUSTRATED.
<br />THE NORMAL DAILY OPERATIONS OF THE STORE.
<br />2.
<br />THE CONTRACTOR IS TO INSPECT THE STORE PRIOR TO
<br />16.
<br />THE CONTRACTOR SHALL OBTAIN PERMISSION FROM OWNER
<br />COMMENCING WITH ANY WORK AND NOTIFY THE OWNER'S
<br />FOR ALL INTERRUPTIONS OF UTILITY SERVICES TO THE EXISTING
<br />MECHANICAL CONSTRUCTION MANAGER OF ANY
<br />BUILDING PRIOR TO THE INTERRUPTION. ACCIDENTAL
<br />DISCREPANCIES BETWEEN THESE PLANS AND THE EXISTING
<br />INTERRUPTIONS SHALL BE REMEDIED IMMEDIATELY WITH
<br />CONDITIONS.
<br />APPROPRIATE FORCES.
<br />3.
<br />ALL WORK SHALL BE DONE IN A SAFE AND WORKMANLIKE
<br />17.
<br />ALL CAP-X/SPECIAL REFRIGERATION PROJECTS ARE TO BE BID
<br />MANNER AND IN STRICT ACCORDANCE WITH THE LOCAL
<br />AS NIGHT WORK. THE CONTRACTOR IS TO ASSUME ALL WORK IS
<br />GOVERNING BUILDING CODE, NATIONAL ELECTRIC CODE, ADA-
<br />TO BE CONDUCTED ONLY AS OVERNIGHT WORK. SOME WORK
<br />ADAAGS, OSHA REGULATIONS, AND ALL APPLICABLE CODES,
<br />MAY BE ALLOWED DURING REGULAR WORKING HOURS TO
<br />REGULATIONS AND ORDINANCES HAVING JURISDICTION.
<br />FACILITATE COMPLETION SCHEDULES. WORK WILL ONLY BE
<br />PERMITTED DURING REGULAR WORKING HOURS WITH THE
<br />4.
<br />THE CONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH
<br />STORE MANAGEMENT'S AND/OR OWNER'S MECHANICAL
<br />KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS. THE
<br />CONSTRUCTION MANAGER'S PERMISSION. WORK TO BE
<br />FAILURE TO ACQUAINT HIMSELF WITH ALL DRAWINGS AND
<br />PERFORMED ON THE EXTERIOR OF THE BUILDING, ROOFTOP,
<br />SPECIFICATIONS DOES NOT RELIEVE THE CONTRACTOR'S
<br />BACK ROOM, BEHIND DUST WALLS, AND WORK THAT DOES NOT
<br />RESPONSIBILITY OF PERFORMING HIS WORK PROPERLY. NO
<br />SIGNIFICANTLY INTERFERE WITH STORE OPERATIONS MAY BE
<br />ADDITIONAL COMPENSATION SHALL BE ALLOWED DUE TO
<br />ALLOWED WITH THE STORE MANAGEMENT'S AND/OR OWNER'S
<br />FAILURE TO FAMILIARIZE WORKERS WITH ALL DRAWINGS AND
<br />MECHANICAL CONSTRUCTION MANAGER'S PERMISSION. THE
<br />SPECIFICATIONS.
<br />CONTRACTOR SHALL PAY FOR ADDITIONAL SECURITY
<br />PERSONNEL TO SUPERVISE ACCESS TO THE BUILDING AS
<br />5.
<br />THE EXISTING BUILDING SHALL BE PROTECTED FROM MOISTURE,
<br />REQUIRED BY STORE MANAGEMENT. CONTRACTOR SHALL
<br />DUST AND DEBRIS. INSTALL DUST PARTITIONS OR DRAPES AS
<br />PROVIDE ALL SAFETY EQUIPMENT AND EXTERIOR LIGHTING AS
<br />SHOWN OR AS REQUIRED TO KEEP DUST AND MOISTURE FROM
<br />REQUIRED TO MAINTAIN A SAFE WORKING ENVIRONMENT FOR
<br />OWNER'S PREMISES.
<br />WORK REQUIRED AT NIGHT. THE CONTRACTOR SHALL PREPARE,
<br />AND DELIVER TO STORE MANAGEMENT, A SCHEDULE OF WORK
<br />6.
<br />ANY DAMAGE TO OWNER'S PROPERTY WHICH OCCURS DURING
<br />FOR THE ENTIRE PROJECT SCOPE OF WORK. THIS SCHEDULE
<br />THE PROCESS OF CONSTRUCTION SHALL BE REPAIRED AT NO
<br />WILL INCLUDE ALL PHASES OF WORK TO BE PERFORMED AND
<br />ADDITIONAL COST TO THE OWNER; THIS INCLUDES ALL
<br />SHALL LIST THE START AND COMPLETION TIMES FOR EACH
<br />MERCHANDISE. CONTRACTOR SHALL PAY THE OWNER THE COST
<br />PHASE OF WORK. THE CONTRACTOR SHALL UPDATE THIS
<br />FOR ALL DAMAGED MERCHANDISE.
<br />SCHEDULE WEEKLY AS CONSTRUCTION PROGRESSES.THE
<br />CONTRACTOR SHALL COORDINATE WITH THE ENGINEER OF
<br />7.
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECEIVING,
<br />RECORD ON DEVIATIONS IN INSTALLATION AND CONSTRUCTION
<br />HANDLING, AND STORAGE OF OWNER FURNISHED EQUIPMENT,
<br />OF FIXTURES, PIPING. AND OTHER ITEMS SPECIFIED IN THESE
<br />CONTRACTOR SHALL COORDINATE DELIVERY DATE CHANGES
<br />CONSTRUCTION DOCUMENTS.
<br />WITH OWNER'S HVAC/REFRIGERATION ADMINISTRATOR.
<br />CONTRACTOR SHALL PROVIDE EITHER ON -SITE STORAGE
<br />18.
<br />SALES FLOOR TO BE ACCESSIBLE TO CUSTOMERS DURING NON -
<br />CONTAINERS, COORDINATE EQUIPMENT LAYDOWN AREA ON-
<br />CONSTRUCTION HOURS. PROVIDE ALL NECESSARY TEMPORARY
<br />SITE, AND/OR OFF -SITE STORAGE FOR OWNER FURNISHED
<br />BARRIERS AND COVERS CAPABLE OF WITHSTANDING SHOPPING
<br />EQUIPMENT AND ANY OTHER CONSTRUCTION ITEMS.
<br />CART TRAFFIC AND CUSTOMER INTERACTION TO PREVENT
<br />CONTRACTOR SHALL COORDINATE LOCATION OF ANY ON -SITE
<br />CUSTOMER ACCESS OR EXPOSURE TO ANY CONSTRUCTION
<br />STORAGE CONTAINERS AND/OR EQUIPMENT LAYDOWN AREA
<br />RELATED HAZARDS. COORDINATE WITH STORE MANAGER.
<br />WITH STORE MANAGEMENT PRIOR TO PLACEMENT.
<br />CONTRACTOR IS RESPONSIBLE FOR SECURITY AND CONDITION
<br />19.
<br />FURNISH AND INSTALL SEISMIC BRACING BASED ON
<br />OF OWNER FURNISHED EQUIPMENT KEPT IN STORAGE AND
<br />APPROPRIATE SEISMIC ZONE REQUIREMENTS PER SMACNA
<br />SHALL PROVIDE PERSONNEL TO RECEIVE AND MOVE
<br />PUBLISHED SEISMIC DETAILS AND LOCAL AND NATIONAL CODES.
<br />EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />CONTRACTOR'S RESPONSIBILITY INCLUDES STRUCTURAL
<br />THE TIMELY ORDERING OF MATERIALS TO PROHIBIT DELAYS OF
<br />ENGINEER'S CERTIFICATION ON DETAILS SUBMITTED FOR
<br />THE CONSTRUCTION SCHEDULE OF THIS PROJECT. IT IS THE
<br />PERMITTING.
<br />RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE
<br />DELIVERY OF MATERIALS IN A TIMELY MANNER.
<br />20,
<br />CONTRACTOR SHALL PAINT ALL NEW CONDUIT, DUCT, PLUMBING
<br />PIPING, SPRINKLER PIPING. AND SUPPORTS EXPOSED TO SALES
<br />8.
<br />THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE
<br />FLOOR WITHOUT EXCEPTIONS. MATCH CEILING OR ADJACENT
<br />EXISTING BUILDING SECURITY AT ALL TIMES. THIS INCLUDES
<br />WALL COLOR (WHERE APPLICABLE). CONDUIT AND PIPING SHALL
<br />KEEPING THE BUILDING SECURE OF PERSONS, ENVIRONMENTAL
<br />BE PAINTED PRIOR TO INSTALLATION.
<br />ELEMENTS OR HAZARDS. THE CONTRACTOR SHALL BE
<br />RESPONSIBLE TO MAINTAIN THE INTEGRITY OF ALL EXISTING
<br />21.
<br />REFER TO SPECIFICATION SECTIONS 01600 - PRODUCT
<br />SECURITY SYSTEMS. THE CONTRACTOR SHALL OBTAIN
<br />REQUIREMENTS AND APPENDIX A - PRODUCTS AND WORK BY
<br />PERMISSION FROM THE STORE MANAGER PRIOR TO THE
<br />OWNER OR SEPARATE CONTRACTOR. THESE SECTIONS
<br />MODIFICATION OF ANY EXISTING SECURITY SYSTEM FOR THE
<br />INCLUDE SPECIFIC INFORMATION REGARDING ITEMS AND
<br />OPENING (DEMOLITION) OF ANY EXTERIOR WALL.
<br />SERVICES TO BE FURNISHED AND INSTALLED BY INDIVIDUALS
<br />OTHER THAN THE CONTRACTOR.
<br />9.
<br />THE CONTRACTOR SHALL KEEP THIS AREA CLEAN AND FREE OF
<br />DEBRIS AND IS TO REMOVE ALL TRASH AND DEBRIS FROM THE
<br />22.
<br />REPORT ANY DISCREPANCIES FOUND IN THE FIELD IMMEDIATELY
<br />CONSTRUCTION AREA DAILY. NO FLAMMABLE MATERIALS OR
<br />TO OWNER AND THE ENGINEER PRIOR TO MAKING ANY
<br />LIQUIDS MAY BE STORED IN THE EXISTING BUILDING OR IN THE
<br />STRUCTURAL MODIFICATIONS OR ORDERING OF ANY
<br />NEW ADDITION.
<br />MATERIALS.
<br />10.
<br />REMOVE ANY EXISTING ITEMS. SERVICES. SIGNAGE, FINISHES/OR
<br />23.
<br />IT IS IMPERATIVE THAT THE ROOF FRAMING, DECKING AND
<br />SURFACES AS REQUIRED FOR THE INSTALLATION OF NEW
<br />ROOFING SYSTEM BE COMPLETED IMMEDIATELY UPON THE
<br />CONSTRUCTION.
<br />DEMOLITION OF ANY PORTION OF AN EXTERIOR WALL OR
<br />MAKING ANY OPENINGS IN THE ROOF TO ELIMINATE POTENTIAL
<br />11.
<br />PROVIDE FURRING FOR CONDUITS AND PIPING, SHOWN OR NOT,
<br />WATER DAMAGE OR MOISTURE INFILTRATION. THE
<br />AND FINISH OUT FURRING TO MATCH ADJACENT EXISTING
<br />CONTRACTOR SHALL KEEP THE BUILDING WATERTIGHT AT ALL
<br />FINISHES.
<br />TIMES.
<br />12.
<br />REPAIR, REROUTE, AND EXTEND ALL SERVICES, PIPING, CONDUIT
<br />24.
<br />THE GENERAL CONTRACTOR SHALL RESPOND TO ALL
<br />OF EXISTING ITEMS AND EQUIPMENT AS REQUIRED DURING THE
<br />REQUIREMENTS OF THE ENGINEER FOR VERIFICATIONS,
<br />CONSTRUCTION PROCESS FOR THE COMPLETE INSTALLATION
<br />RESPONSES, AND SUBMISSIONS. ALL ADJACENT BUILDINGS (IF
<br />AND OPERATION OF NEW EQUIPMENT. THIS INCLUDES ALL ITEMS
<br />APPLICABLE) SHALL REMAIN IN SERVICE DURING
<br />SHOWN OR NOT SHOWN ON THE DRAWINGS.
<br />DEMOLITION/CONSTRUCTION.
<br />13.
<br />RESET EXISTING EQUIPMENT OR RELATED ITEMS INCLUDING
<br />25.
<br />MUD AND DEBRIS TRACKED ONTO OWNER PAVING OR CITY
<br />SIGNAGE AS REQUIRED FOR PROPER OPERATION. WHERE
<br />STREETS TO BE CLEANED IMMEDIATELY.
<br />EXISTING FINISHES ARE TO REMAIN, CLEAN, REPAIR, PATCH,
<br />AND/OR RE -PAINT AS NECESSARY TO BLEND WITH ADJACENT
<br />26.
<br />BUILDING COMPONENTS AFFECTED BY THE SCOPE OF WORK
<br />SURFACES.
<br />AND ALLOWED TO REMAIN SHALL BE SECURED TO PREVENT
<br />FALLING, LOOSENING, OR CREATING DAMAGE OF ANY KIND IN
<br />14.
<br />CONSULT OWNER'S MECHANICAL CONSTRUCTION MANAGER
<br />THE FUTURE.
<br />FOR COMPLETE APPLICABLE SCOPE OF WORK. THE
<br />CONTRACTOR SHALL MAINTAIN THE REQUIRED NUMBER OF
<br />EXITS WITHIN THE STORE. MAINTAIN EXITSIGNS AND
<br />EMERGENCY LIGHTING AT ALL TIMES, AS REQUIRED BY THE
<br />LOCAL BUILDING OFFICIAL.
<br />ROOFING NOTE
<br />VERIFY ALL ROOFING WORK WITH OWNER CONTACT PRIOR TO
<br />BEGINNING WORK:
<br />KYLE ROUGHTON (479) 204-3047 KYLE.R000HTON@WALMART.COM
<br />SETH LOMBARD (479) 258-6054 SETH.LOMBARD@WALMART.COM
<br />CHRIS CRUSE (479) 277-2991 CHRIS.CRUSE@WALMART.COM
<br />HVAC FIRE ALARM NOTE
<br />CONTACT WALMART SECURITY SERVICES REGIONAL DIRECTOR TO
<br />COORDINATE CONNECTION OF DUCT SMOKE DETECTORS IN THE
<br />NEW MECHANICAL EQUIPMENT TO THE FIRE ALARM PANEL. DAVID
<br />WINSTEAD, SOUTH EAST REGION 18,
<br />DAVID.W INSTEAD@WALMART.COM
<br />CONTRACTOR BID NOTICE
<br />CAP-X COMBO
<br />THIS PROJECT CONSISTS OF BOTH HVAC AND REFRIGERATION AS
<br />PART OF THE SCOPE OF WORK. OWNER WILL AWARD THE
<br />PROJECT TO A SINGLE CONTRACTOR AND ALL WORK DISCLOSED IN
<br />THIS SET OF DOCUMENTS WILL BE COMPLETED AS ONE PROJECT.
<br />THEREFORE, CONSTRUCTION SET-UP, RIGGING EQUIPMENT
<br />CHARGES, PERMITS, FEES, ETC. WILL NEED TO BE INCLUDED IN THE
<br />CONSTRUCTION BID.
<br />INFORMATION SAFETY BOARD
<br />SAFETY BOARDS AND OR POSTED CONSTRUCTION SCHEDULES
<br />ARE REQUIRED ON CERTAIN CAP-X PROJECTS DEPENDING ON THE
<br />PROJECT TYPE. CAP-X PROJECTS WILL BE LISTED AS ONE OF THE
<br />FOLLOWING TYPES: COMBO, REF-1, REF-2, REF-3, REF-4, HVAC-1,
<br />HVAC-2, HVAC-3, OR HVAC-4.
<br />REF-1 / REF-2 / COMBO: INFORMATION SAFETY BOARD REQUIRED
<br />W/ POSTED CONSTRUCTION SCHEDULE
<br />REF-3: INFORMATION SAFETY BOARD REQUIRED W/ POSTED
<br />CONSTRUCTION SCHEDULE
<br />REF-4: NOT REQUIRED
<br />HVAC-1: INFORMATION SAFETY BOARD REQUIRED W/ POSTED
<br />CONSTRUCTION SCHEDULE
<br />HVAC-2: INFORMATION SAFETY BOARD REQUIRED W/ POSTED
<br />CONSTRUCTION SCHEDULE
<br />HVAC-3: INFORMATION SAFETY BOARD REQUIRED W/ POSTED
<br />CONSTRUCTION SCHEDULE
<br />HVAC- 4: NOT REQUIRED
<br />REFER TO THE MECHANICAL CONSTRUCTION PROJECT
<br />SPECIFICATION MANUAL SECTION 01500 - TEMPORARY FACILITIES
<br />AND CONTROLS FOR COMPLETE TEMPORARY FACILITY AND
<br />CONTROLS FOR COMPLETE TEMPORARY FACILITY REQUIREMENTS.
<br />NOTE TO BIDDING CONTRACTORS
<br />THESE PLANS ARE TYPICALLY ISSUED FOR BID AS REDUCED "1/2
<br />(HALF) SIZE" DOCUMENTS. SCALES SHOWN APPLY TO ORIGINAL
<br />"FULL SIZE" DOCUMENTS ONLY. DO NOT SCALE DRAWINGS, FIELD
<br />I VERIFY ALL DIMENSIONS.
<br />THE AWARDED CONTRACTOR SHALL BE RESPONSIBLE FOR THE
<br />ENTIRE SCOPE OF WORK INDICATED ON THESE PLANS, THE
<br />ASSOCIATED SPECIFICATIONS AND OWNER SCOPE OF WORK
<br />DOCUMENT. THIS CAPITAL EXPENDITURE SHALL BE COMPLETED AS
<br />A "TURN KEY" PROJECT BY THE AWARDED CONTRACTOR AND SHALL
<br />INCLUDE BUT NOT LIMITED TO ALL SHEETS ON THIS PRINT: HVAC,
<br />REFRIGERATION, PLUMBING, ELECTRICAL EMS CONTROLS SYSTEMS,
<br />ARCHITECTURAL AND STRUCTURAL DISCIPLINES.
<br />0
<br />w 1
<br />1
<br />zwow a�o�
<br />w
<br />W
<br />HO��z~o�zcn�
<br />waw�UO
<br />�
<br />=zw�
<br />CF ��WF�OpO�wU
<br />aQ ��ogw�a�zQoow
<br />w w a w n m
<br />u-
<br />> o
<br />�� jao�o=U�~tea
<br />Z
<br />O
<br />U w¢ F�wu w�
<br />aLJ �N naC70wF O=p
<br />�u 16
<br />Zz10
<br />pwvi¢M�w Qw000¢
<br />g
<br />z��0o°' C�a�QW
<br />�aQ' �Z JUD W www OO
<br />0-
<br />p
<br />O0iw0Q�=g�Zp�OQ
<br />✓ wa zw�O�QXC7wa0F w
<br />FDN (-)QCod0 W 2:]2c�QF--
<br />Z
<br />m
<br />O
<br />lc:::"0
<br />o -
<br />cn
<br />w v
<br />w
<br />w
<br />s
<br />r-Lo
<br />W
<br />Cn CV �
<br />K
<br />CN
<br />Lu m CD
<br />w
<br />i,w�x
<br />Z
<br />no o
<br />Z
<br />FrYLL
<br />z
<br />O}N
<br />Z
<br />oQ
<br />o
<br />O
<br />ocr-
<br />in F- w
<br />~
<br />W O
<br />Xwo
<br />l
<br />r'"�
<br />z
<br />z
<br />=
<br />Lu ZWO
<br />w
<br />NFX
<br />w
<br />w-i
<br />Z
<br />�w
<br />J
<br />U)
<br />-J ti
<br />L0 -
<br />Lu
<br />_
<br />Li-
<br />z
<br />°
<br />��
<br />w
<br />U
<br />F-
<br />O
<br />m
<br />O
<br />%0 J
<br />(-)
<br />CO C=:) LL
<br />0 O
<br />p O
<br />o
<br />co a
<br />O N
<br />0
<br />n/ z CDI� w CD
<br />0
<br />0 Lo
<br />O N
<br />0 � F-
<br />D-
<br />W
<br />N
<br />�I
<br />ISSUE BLOCK
<br />CHECKED BY: JPL/JDS
<br />DRAWN BY: AMU
<br />DOCUMENT DATE: 06/30/23
<br />THIS ITEM HAS BEEN
<br />ELECTRONICALLY SIGNED
<br />AND SEALED BY MICHAEL
<br />DEAN SCHAEFER ON THE
<br />DATE LISTED BELOW
<br />USING A DIGITAL
<br />SIGNATURE.
<br />PRINTED COPIES OF THIS
<br />DOCUMENT ARE NOT
<br />CONSIDERED SIGNED AND
<br />SEALED AND THE
<br />SIGNATURE MUST BE
<br />VERIFIED ON ANY
<br />ELECTRONIC COPIES.
<br />MICHAEL D. SCHAEFER
<br />LICENSE # 89591
<br /># • No. 89591
<br />STATE of
<br />06/30/2023
<br />TITLE SHEET
<br />x
<br />w
<br />w
<br />w
<br />Q
<br />U
<br />0
<br />J
<br />w
<br />Q
<br />U
<br />75
<br />USE AND OCCUPANCY GROUP: M
<br />CONSTRUCTION TYPE: V-B
<br />BUILDING AREA: ETR
<br />OCCUPANT LOAD: ETR
<br />FIRE PROTECTION: BUILDING IS EQUIPED THROUGHOUT WITH AN
<br />AUTOMATIC SPRINKLER SYSTEM.
<br />SEISMIC DESIGN CATEGORY A
<br />ULTIMATE DESIGN WIND SPEED: 138 MPH
<br />EXISTING CONDITIONS WERE TAKEN FROM
<br />ORIGINAL DRAWINGS AND MAY NOT REFLECT
<br />EXACT "AS -BUILT" CONDITIONS. CONTRACTOR
<br />SHALL FIELD VERIFY ALL EXISTING CONDITIONS
<br />PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR
<br />SHALL CAREFULLY COORDINATE NEW WORK AND
<br />DEMOLITION WITH ALL OTHER DISCIPLINES AND
<br />EXISTING CONDITIONS.
<br />EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
<br />A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
<br />SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
<br />TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
<br />NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
<br />THE WORK PROPERLY. NO ADDITIONAL
<br />COMPENSATION SHALL BE ALLOWED BECAUSE OF
<br />CONDITIONS THAT OCCUR DUE TO FAILURE TO
<br />FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
<br />SHEET: -