Laserfiche WebLink
VENDOR CONTACT LIST <br />CONTRACTOR IS RESPONSIBLE, UPON AWARD, TO CONTACT AND VERIFY ALL DELIVERY DATES/TIMES WITH <br />EVERY VENDOR LISTED BELOW. THIS IS UNIQUE TO CAPITAL EXPENDITURES PROJECTS. DATE CHANGE <br />REQUESTS MUST BE SENT TO BOTH shoran.ha—marLoom AND duane davh*vvd—mwLcam <br />VENDOR PHONE CONTACT <br />HILL PHOENIX REFRIG. SYSTEMS 800-518-6630 Ext 3025 JOEL CRANE <br />KYSOR//WARREN 888-899-9184 TOM BOLTON <br />THE MARCO CO. 800-356-2848 AUTUMN ARMSTRONG <br />NOVAR 800-341-7795 CAROL DEATHERAGE <br />PRODEW 770-420-3060 ISHERRY WILSON <br />WAL— M ART CONTACT LIST <br />CONTACT PHONE AND/OR EMAIL TITLE <br />WAL—MART SUPERCENTER #0706 813 782-1957 STORE <br />KOENIG, JACQUE (479) 633-5814 CONSTRUCTION MANAGER <br />jacque.koenig@wol—mart.com <br />PERMITTING CONTACT LIST <br />UPON N071CATION OF CONTRACT AWARD. CONTRACTOR MUST CONTACT ENGINEERING FIRMS PERMITTING <br />SPECIALIST REGARDING BUILDING PERMIT STATUS. CONTRACTOR SHALL NOT CONTACT AHJ PRIOR TO <br />CONTACTING PERMITTING SPECIALIST. IN SOME JURISDICTIONS IT MAY BE NECESSARY FOR THE CONTRACTOR <br />TO DELIVER PERMIT PLAN SETS AND PAY PERMIT FEES TO THE AHJ IN ORDER TO RECEIVE CONSTRUCTION <br />PERMITS. UPON REVIEW OF PROJECT SCOPE THE AHJ MAY REQUIRE THE CONTRACTOR TO SUBMIT FOR <br />ADDITIONAL REVIEW TO ADDITIONAL LOCAL. COUNTY. STATE. AND/OR FEDERAL AUTHORITIES WHICH MAY <br />NOT BE LOCATED WITHIN THE PROJECT AREA. <br />CONTACT EMAIL TITLE <br />JOANNA HAILE 'oanno.haile0hei—en .com PERMITTING SPECIALIST <br />LIZ BROWN Iiz.brownOahei—ena.com PERMITTING COORDINATOR <br />SCOPE OF WORK SUMMARY <br />NOTE: THE INTENT OF THIS SUMMARY IS TO ASSIST <br />VENDORS IN IDENTIFYING EQUIPMENT NEEDS. IT IS <br />NOT INTENDED FOR USE BY CONTRACTOR TO CAPTURE <br />ALL SCOPE ISSUES. REFER TO PLANS AND <br />SPECIFICATIONS (WHERE APPLICABLE) FOR ADDITIONAL <br />INFORMATION. <br />REPLACE MULTI —DECK PRODUCE CASES <br />REPLACE PRODUCE MISTING SYSTEM <br />CODE COMPLIANCE <br />ALL DRAWINGS ARE IN COMPLIANCE WITH THE <br />FOLLOWING CODES: <br />THE FLORIDA BUILDING CODE, 2010 EDITION (2009 <br />IBC) <br />THE NATIONAL ELECTRICAL CODE, 2008 EDITION <br />THE FLORIDA BUILDING CODE, 2010 MECHANICAL <br />EDITION (2009 IMC) <br />THE FLORIDA BUILDING CODE, 2010 PLUMBING <br />EDITION (2009 IPC) <br />USE AND OCCUPANCY GROUP: M <br />CONSTRUCTION TYPE: V <br />BUILDING AREA: UNCHANGED <br />OCCUPANT LOAD: UNCHANGED <br />FIRE PROTECTION: YES <br />Y <br />U <br />a <br />0 <br />U <br />cn <br />E.5 � <br />VER. 6.2.05 <br />t1lainiart <br />REFRIGERATION CAP=X PROJECT <br />FIXTURE <br />T1 TITLE SHEET <br />F1 FIXTURE PLANS AND DETAIL <br />USMVmOO5779 <br />ZEPHYRHILL , FL <br />STORE #0706 <br />INDEX OF DRAWINGS <br />PLUMBING <br />P1 PLUMBING PLAN AND SCHEDULE <br />REFRIGERATION <br />R1 REFRIGERATION PLAN AND DETAIL <br />R2 REFRIGERATION LEGEND <br />1 2 3 4 5 6 7 8 <br />I I <br />KEY PLAN. <br />1 SCALE: 1 " = 40' <br />ELECTRICAL <br />REM1 REFRIGERATION ENERGY MANAGEMENT PLAN <br />AND DETAIL <br />RE1 REFRIGERATION ELECTRICAL PLAN AND <br />SCHEDULE <br />9 10 11 12 <br />14.1 <br />13 13.6 14 <br />I <br />DEMOLITION REQUIREMENTS I GENERAL REQUIREMENTS <br />1. ALL DEMOLITION SHALL BE CARRIED OUT IN A 1. THE PLANS SHOWN THROUGHOUT THESE DOCUMENTS ARE BASED <br />SAFE MANNER AND IN STRICT ACCORDANCE ON LIMITED INFORMATION PROVIDED BY WALMART; THE DESIGN <br />WITH OSHA REGULATIONS. PROFESSIONAL HAS NOT SURVEYED THIS STORE AND CANNOT BE <br />HELD RESPONSIBLE FOR THE ACCURACY OF THE EXISTING <br />2. THE CONTRACTOR SHALL FIELD VERIFY THE CONDITIONS ILLUSTRATED. <br />EXTENT OF DEMOLITION. THE WORK INCLUDES, <br />BUT IS NOT LIMITED TO, THE DEMOLITION AND 2. ALL SUBCONTRACTORS ARE TO INSPECT THE STORE PRIOR TO <br />REMOVAL OF WALLS, DOORS, FLOORS, AND COMMENCING WITH ANY WORK AND NOTIFY THE WALMART <br />ELECTRICAL ITEMS INCLUDING CONDUITS AS MECHANICAL SERVICES CONSTRUCTION MANAGER OF ANY <br />SHOWN ON DRAWING OR AS REQUIRED FOR DISCREPANCIES BETWEEN THESE PLANS AND THE EXISTING <br />THE INSTALLATION OF NEW WORK FOR A CONDITIONS. <br />COMPLETE JOB. <br />3. ALL WORK SHALL BE DONE IN A SAFE AND WORKMANLIKE <br />3. WHEN UTILITIES ARE REMOVED, CAP AND SEAL MANNER AND IN STRICT ACCORDANCE WITH THE LOCAL GOVERNING <br />A MINIMUM OF 8" BELOW FINISH FLOOR OR A BUILDING CODE, NATIONAL ELECTRIC CODE, ADA—ADAAGS, AND ALL <br />MINIMUM OF 6" ABOVE FINISHED CEILING. SHOW APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING <br />ALL ABANDONED AND CAPPED UTILITIES ON JURISDICTION. <br />AS—BUILTS, DRAWINGS, AND RECORDED <br />DOCUMENTS. 4. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH <br />KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR <br />4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO RELATED FIELD. THE FAILURE TO ACQUAINT HIMSELF WITH THIS <br />PROVIDE ADEQUATE SHORING, BRACING, AND KNOWLEDGE DOES NOT RELIEVE HIM OF ANY RESPONSIBILITY FOR <br />SUPPORT SYSTEMS AND TO KEEP THE EXISTING PERFORMING HIS WORK PROPERLY. NO ADDITIONAL <br />STRUCTURE INTACT AND IN A SAFE CONDITION COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT <br />DURING THE REMOVAL OF STRUCTURAL ITEMS OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS <br />AND NEW CONSTRUCTION. KNOWLEDGE. <br />5. THE CONTRACTOR SHALL RETAIN A REGISTERED 5. THE EXISTING BUILDING SHALL BE PROTECTED FROM MOISTURE, <br />PROFESSIONAL ENGINEER TO DESIGN THE DUST AND DEBRIS. INSTALL DUST PARTITIONS OR DRAPES AS <br />SHORING AND SPECIFY DEMOLITION SHOWN OR AS REQUIRED TO KEEP DUST AND MOISTURE FROM <br />PROCEDURES. WALMART PREMISES. <br />6. IT IS THE CONTRACTOR'S RESPONSIBILITY FOR 6. ANY DAMAGE TO WALMART PROPERTY WHICH OCCURS DURING THE <br />MEANS AND METHODS OF DEMOLITION AND NEW PROCESS OF CONSTRUCTION SHALL BE REPAIRED AT NO <br />CONSTRUCTION. PRIOR TO THE EXCAVATION OF ADDITIONAL COST TO WALMART; THIS INCLUDES ALL MERCHANDISE. <br />FOUNDATIONS ADJACENT TO THE EXISTING CONTRACTOR SHALL PAY WALMART THE COST FOR ALL DAMAGED <br />STRUCTURE, PROVIDE ADEQUATE SUPPORT FOR MERCHANDISE. <br />THE SUB —BASE TO PREVENT UNDERMINING. <br />7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECEIVING, <br />7. DURING DEMOLITION AND RECONSTRUCTION, THE HANDLING, AND STORAGE OF OWNER FURNISHED EQUIPMENT. <br />CONTRACTOR SHALL COORDINATE WITH THE CONTRACTOR SHALL COORDINATE DELIVERY DATE CHANGES WITH <br />WALMART MECHANICAL SERVICES CONSTRUCTION WALMART REFRIGERATION ADMINISTRATOR. CONTRACTOR SHALL <br />MANAGER ANY REQUIRED SAFETY BARRIERS OR PROVIDE EITHER ON —SITE STORAGE CONTAINERS AND/OR OFF —SITE <br />BARRICADES. REFER TO THE WALMART STORAGE FOR OWNER FURNISHED EQUIPMENT AND ANY OTHER <br />MECHANICAL SERVICES CONSTRUCTION MANAGER CONSTRUCTION ITEMS. CONTRACTOR SHALL COORDINATE LOCATION <br />FOR PHASING AND SCHEDULING DEMOLITION OF ANY ON —SITE STORAGE CONTAINERS WITH STORE MANAGEMENT <br />AND NEW CONSTRUCTION. PRIOR TO PLACEMENT. CONTRACTOR IS RESPONSIBLE FOR <br />SECURITY AND CONDITION OF OWNER FURNISHED EQUIPMENT KEPT <br />8. IMMEDIATE SALVAGE/LEGAL DISPOSAL OF ALL IN STORAGE AND SHALL PROVIDE PERSONNEL TO RECEIVE AND <br />DECOMMISSIONED EQUIPMENT SHALL BE THE MOVE EQUIPMENT. <br />RESPONSIBILITY OF THE CONTRACTOR. AT THE <br />DISCRETION OF THE WALMART MECHANICAL 8. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN THE <br />SERVICES CONSTRUCTION MANAGER WALMART INTEGRITY OF ALL EXISTING SECURITY SYSTEMS. THE CONTRACTOR <br />SHALL RETAIN THE OPTION TO OCCASIONALLY SHALL OBTAIN PERMISSION FROM THE WALMART STORE MANAGER <br />SALVAGE EMS EQUIPMENT, VARIABLE FREQUENCY PRIOR TO THE MODIFICATION OF ANY EXISTING SECURITY SYSTEM <br />DRIVE EQUIPMENT, COMPRESSORS, WALK—IN FOR THE OPENING (DEMOLITION) OF ANY EXTERIOR WALL. <br />DOORS, EVAPORATORS, REFRIGERATED CASES, <br />ETC. FROM REFRIGERATION EQUIPMENT TO BE 9. THE CONTRACTOR SHALL KEEP THIS AREA CLEAN AND FREE OF <br />REPLACED DURING THE CAP—X PROJECT. THE DEBRIS AND IS TO REMOVE ALL TRASH AND DEBRIS FROM THE <br />CONTRACTOR SHALL COORDINATE WITH THE CONSTRUCTION AREA DAILY. NO FLAMMABLE MATERIALS OR LIQUIDS <br />WALMART MECHANICAL SERVICES CONSTRUCTION MAY BE STORED IN THE EXISTING BUILDING OR IN THE NEW <br />MANAGER ALL ITEMS TO BE RETAINED BY ADDITION. <br />WALMART PRIOR TO REMOVAL OF THE <br />EQUIPMENT SHOWN ON THE DEMOLITION PLANS. 10. REMOVE ANY EXISTING ITEMS, SERVICES, FINISHES/OR SURFACES <br />THE CONTRACTOR SHALL CAREFULLY REMOVE AS REQUIRED FOR THE INSTALLATION OF NEW CONSTRUCTION. <br />ANY ITEMS TO BE RETAINED BY WALMART AND <br />DELIVER THOSE ITEMS, READY FOR SHIPMENT, 11. PROVIDE FURRING FOR CONDUITS AND PIPING, SHOWN OR NOT, <br />TO THE WALMART MECHANICAL SERVICES AND FINISH OUT FURRING TO MATCH ADJACENT EXISTING FINISHES. <br />CONSTRUCTION MANAGER. ALL REMOVED ITEMS <br />NOT ALLOCATED FOR SALVAGE BY WALMART 12. REPAIR, REROUTE, AND EXTEND ALL SERVICES, PIPING, CONDUIT <br />SHALL BE THE CONTRACTOR'S RESPONSIBILITY OF EXISTING ITEMS AND EQUIPMENT AS REQUIRED DURING THE <br />TO IMMEDIATELY REMOVE FROM THE JOB SITE CONSTRUCTION PROCESS FOR THE COMPLETE INSTALLATION AND <br />AND ARRANGE DISPOSAL IN ACCORDANCE WITH OPERATION OF NEW EQUIPMENT. THIS INCLUDES ALL ITEMS <br />LOCAL CODES. SHOWN OR NOT SHOWN ON THE DRAWINGS. <br />13. RESET EXISTING EQUIPMENT OR RELATED ITEMS AS REQUIRED FOR <br />PROPER OPERATION. WHERE EXISTING FINISHES ARE TO REMAIN, <br />IT 2q I CLEAN, REPAIR, PATCH, AND/OR RE —PAINT AS NECESSARY TO `r <br />6—A <br />,lBLEND WITH ADJACENT SURFACES. <br />14. CONSULT WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER <br />er�(,`�,,, ) FOR COMPLETE APPLICABLE SCOPE OF WORK. THE CONTRACTOR <br />/� �CJ S SHALL MAINTAIN THE REQUIRED NUMBER OF EXITS WITHIN THE <br />CA /� / (` STORE. MAINTAIN EXIT SIGNS AND EMERGENCY LIGHTING AT ALL <br />TIMES, AS REQUIRED BY THE LOCAL BUILDING OFFICIAL. <br />REVIEW DATE � 1 I -j� 15. WALMART SHALL OCCUPY THE BUILDING DURING CONSTRUCTION. <br />-- j� THE CONTRACTOR SHALL COORDINATE WITH WALMART STORE <br />CITY OF ZEPHYRHIL_L MANAGER AND THE WALMART MECHANICAL SERVICES CONSTRUCTION <br />PLANS EXgMINRR_-- MANAGER ALL CONSTRUCTION PROCEDURES WHICH WILL INTERFERE <br />WITH THE NORMAL DAILY OPERATIONS OF THE STORE. <br />16. THE CONTRACTOR SHALL OBTAIN PERMISSION FROM WALMART FOR <br />ALL INTERRUPTIONS OF UTILITY SERVICES TO THE EXISTING <br />BUILDING PRIOR TO THE INTERRUPTION. ACCIDENTAL <br />INTERRUPTIONS SHALL BE REMEDIED IMMEDIATELY WITH <br />ALL WORK SHALL COMPLY WITH ALL APPROPRIATE FORCES. <br />PREVAILING CODES, FLORIDA BUILDING 17. ALL CAP—X REFRIGERATION PROJECTS ARE TO BE BID AS NIGHT <br />CODE, NATIONAL ELECTRIC CODE AND WORK. THE CONTRACTOR IS TO ASSUME ALL WORK IS TO BE <br />CITY OF ZEPHYRHILLS ORDINANCES CONDUCTED ONLY AS OVERNIGHT WORK. SOME WORK MAY BE <br />ALLOWED DURING REGULAR WORKING HOURS TO FACILITATE <br />COMPLETION SCHEDULES. WORK WILL ONLY BE PERMITTED DURING <br />REGULAR WORKING HOURS WITH THE STORE MANAGEMENT'S <br />AND/OR MECHANICAL SERVICES CONSTRUCTION MANAGER'S <br />PERMISSION. WORK TO BE PERFORMED ON THE EXTERIOR OF THE <br />BUILDING, ROOFTOP, BACK ROOM, BEHIND DUST WALLS, AND <br />WORK THAT DOES NOT SIGNIFICANTLY INTERFERE WITH STORE <br />OPERATIONS MAY BE ALLOWED WITH THE STORE MANAGEMENT'S <br />AND/OR MECHANICAL SERVICES CONSTRUCTION MANAGER'S <br />PERMISSION. THE CONTRACTOR SHALL PAY FOR ADDITIONAL <br />SECURITY PERSONNEL TO SUPERVISE ACCESS TO THE BUILDING AS <br />REQUIRED BY STORE MANAGEMENT. CONTRACTOR SHALL PROVIDE <br />ALL SAFETY EQUIPMENT AND EXTERIOR LIGHTING AS REQUIRED TO <br />MAINTAIN A SAFE WORKING ENVIRONMENT FOR WORK REQUIRED AT <br />NIGHT. THE CONTRACTOR SHALL PREPARE, AND DELIVER TO STORE <br />MANAGEMENT, A SCHEDULE OF WORK FOR THE ENTIRE PROJECT <br />SCOPE OF WORK. THIS SCHEDULE WILL INCLUDE ALL PHASES OF <br />WORK TO BE PERFORMED AND SHALL LIST THE START AND <br />COMPLETION TIMES FOR EACH PHASE OF WORK. THE CONTRACTOR <br />SHALL UPDATE THIS SCHEDULE WEEKLY AS CONSTRUCTION <br />PROGRESSES. <br />NOTE TO BIDDING CONTRACTORS <br />THESE PLANS ARE TYPICALLY ISSUED FOR BID AS REDUCED "1/2 (HALF) SIZE" DOCUMENTS. <br />SCALES SHOWN APPLY TO ORIGINAL "FULL SIZE" DOCUMENTS ONLY. DO NOT SCALE <br />DRAWINGS, FIELD VERIFY ALL DIMENSIONS. <br />EXISTING CONDITIONS WERE TAKEN EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br />FROM ORIGINAL DRAWINGS AND MAY A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />NOT REFLECT EXACT "AS —BUILT" SPECIFICATIONS IN THEIR RELATED FIELD. THE <br />CONDITIONS. CONTRACTOR SHALL FAILURE TO ACQUAINT HIMSELF WITH THIS <br />FIELD VERIFY ALL EXISTING CONDITIONS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY <br />NOTE: ALL WORK ON THIS SHEET IS PRIOR TO SUBMITTING FINAL BIDS. OF PERFORMING HIS WORK PROPERLY. NO <br />TO BE COMPLETED BY WALMART CONTRACTOR SHALL CAREFULLY ADDITIONAL COMPENSATION SHALL BE ALLOWED <br />APPROVED CONTRACTOR. COORDINATE NEW WORK AND BECAUSE OF CONDITIONS THAT OCCUR DUE <br />DEMOLITION WITH ALL OTHER TO FAILURE TO FAMILIARIZE WORKERS WITH THIS <br />DISCIPLINES AND EXISTING CONDITIONS. KNOWLEDGE. <br />ZN <br />ow <br />o <br />0 <br />N <br />O <br />Oco <br />mN <br />Z49 <br />W"� <br />• OlZO <br />OW <br />WZO <br />X <br />O <br />a <br />} <br />Ld OwLOZ 1 <br />- <br /><z ,c(" <br />LL fir .wcn�wzo <br />Of Lam �za`cRQ5060- <br />W,* z a0 0Ld <N3 <br />(n <br />O wI.- ll(,,�JJ 1-JLL, zo <br />L a <br />Ls=O=N�a <br />tn�w��VOXcnwpjQ� <br />O 3tn Q �li�NwK Z d La, oo <br />Q 0-003waia- Na <br />z-a �n w' o w< <br />J <CWLW<Z���r�i' _fr <br />0 (lI 0wNWKFwUWWz0z <br />a Nac��� �WWa?3eLd0 <br />odD)zoa(xaaawoam <br />ca co <br />o w �17!�I� <br />v � O <br />co <br />w <br />z <br />GCi <br />0 <br />ISSUE BLOCK <br />CHECKED BY: RDF/JAL <br />DRAWN BY: RDF <br />DOCUMENT DATE: 01 /03/12 <br />TITLE <br />SHEET <br />SHEET: <br />Tl <br />