VENDOR CONTACT LIST
<br />CONTRACTOR IS RESPONSIBLE, UPON AWARD, TO CONTACT AND VERIFY ALL DELIVERY DATES/TIMES WITH
<br />EVERY VENDOR LISTED BELOW. THIS IS UNIQUE TO CAPITAL EXPENDITURES PROJECTS. DATE CHANGE
<br />REQUESTS MUST BE SENT TO BOTH shoran.ha—marLoom AND duane davh*vvd—mwLcam
<br />VENDOR PHONE CONTACT
<br />HILL PHOENIX REFRIG. SYSTEMS 800-518-6630 Ext 3025 JOEL CRANE
<br />KYSOR//WARREN 888-899-9184 TOM BOLTON
<br />THE MARCO CO. 800-356-2848 AUTUMN ARMSTRONG
<br />NOVAR 800-341-7795 CAROL DEATHERAGE
<br />PRODEW 770-420-3060 ISHERRY WILSON
<br />WAL— M ART CONTACT LIST
<br />CONTACT PHONE AND/OR EMAIL TITLE
<br />WAL—MART SUPERCENTER #0706 813 782-1957 STORE
<br />KOENIG, JACQUE (479) 633-5814 CONSTRUCTION MANAGER
<br />jacque.koenig@wol—mart.com
<br />PERMITTING CONTACT LIST
<br />UPON N071CATION OF CONTRACT AWARD. CONTRACTOR MUST CONTACT ENGINEERING FIRMS PERMITTING
<br />SPECIALIST REGARDING BUILDING PERMIT STATUS. CONTRACTOR SHALL NOT CONTACT AHJ PRIOR TO
<br />CONTACTING PERMITTING SPECIALIST. IN SOME JURISDICTIONS IT MAY BE NECESSARY FOR THE CONTRACTOR
<br />TO DELIVER PERMIT PLAN SETS AND PAY PERMIT FEES TO THE AHJ IN ORDER TO RECEIVE CONSTRUCTION
<br />PERMITS. UPON REVIEW OF PROJECT SCOPE THE AHJ MAY REQUIRE THE CONTRACTOR TO SUBMIT FOR
<br />ADDITIONAL REVIEW TO ADDITIONAL LOCAL. COUNTY. STATE. AND/OR FEDERAL AUTHORITIES WHICH MAY
<br />NOT BE LOCATED WITHIN THE PROJECT AREA.
<br />CONTACT EMAIL TITLE
<br />JOANNA HAILE 'oanno.haile0hei—en .com PERMITTING SPECIALIST
<br />LIZ BROWN Iiz.brownOahei—ena.com PERMITTING COORDINATOR
<br />SCOPE OF WORK SUMMARY
<br />NOTE: THE INTENT OF THIS SUMMARY IS TO ASSIST
<br />VENDORS IN IDENTIFYING EQUIPMENT NEEDS. IT IS
<br />NOT INTENDED FOR USE BY CONTRACTOR TO CAPTURE
<br />ALL SCOPE ISSUES. REFER TO PLANS AND
<br />SPECIFICATIONS (WHERE APPLICABLE) FOR ADDITIONAL
<br />INFORMATION.
<br />REPLACE MULTI —DECK PRODUCE CASES
<br />REPLACE PRODUCE MISTING SYSTEM
<br />CODE COMPLIANCE
<br />ALL DRAWINGS ARE IN COMPLIANCE WITH THE
<br />FOLLOWING CODES:
<br />THE FLORIDA BUILDING CODE, 2010 EDITION (2009
<br />IBC)
<br />THE NATIONAL ELECTRICAL CODE, 2008 EDITION
<br />THE FLORIDA BUILDING CODE, 2010 MECHANICAL
<br />EDITION (2009 IMC)
<br />THE FLORIDA BUILDING CODE, 2010 PLUMBING
<br />EDITION (2009 IPC)
<br />USE AND OCCUPANCY GROUP: M
<br />CONSTRUCTION TYPE: V
<br />BUILDING AREA: UNCHANGED
<br />OCCUPANT LOAD: UNCHANGED
<br />FIRE PROTECTION: YES
<br />Y
<br />U
<br />a
<br />0
<br />U
<br />cn
<br />E.5 �
<br />VER. 6.2.05
<br />t1lainiart
<br />REFRIGERATION CAP=X PROJECT
<br />FIXTURE
<br />T1 TITLE SHEET
<br />F1 FIXTURE PLANS AND DETAIL
<br />USMVmOO5779
<br />ZEPHYRHILL , FL
<br />STORE #0706
<br />INDEX OF DRAWINGS
<br />PLUMBING
<br />P1 PLUMBING PLAN AND SCHEDULE
<br />REFRIGERATION
<br />R1 REFRIGERATION PLAN AND DETAIL
<br />R2 REFRIGERATION LEGEND
<br />1 2 3 4 5 6 7 8
<br />I I
<br />KEY PLAN.
<br />1 SCALE: 1 " = 40'
<br />ELECTRICAL
<br />REM1 REFRIGERATION ENERGY MANAGEMENT PLAN
<br />AND DETAIL
<br />RE1 REFRIGERATION ELECTRICAL PLAN AND
<br />SCHEDULE
<br />9 10 11 12
<br />14.1
<br />13 13.6 14
<br />I
<br />DEMOLITION REQUIREMENTS I GENERAL REQUIREMENTS
<br />1. ALL DEMOLITION SHALL BE CARRIED OUT IN A 1. THE PLANS SHOWN THROUGHOUT THESE DOCUMENTS ARE BASED
<br />SAFE MANNER AND IN STRICT ACCORDANCE ON LIMITED INFORMATION PROVIDED BY WALMART; THE DESIGN
<br />WITH OSHA REGULATIONS. PROFESSIONAL HAS NOT SURVEYED THIS STORE AND CANNOT BE
<br />HELD RESPONSIBLE FOR THE ACCURACY OF THE EXISTING
<br />2. THE CONTRACTOR SHALL FIELD VERIFY THE CONDITIONS ILLUSTRATED.
<br />EXTENT OF DEMOLITION. THE WORK INCLUDES,
<br />BUT IS NOT LIMITED TO, THE DEMOLITION AND 2. ALL SUBCONTRACTORS ARE TO INSPECT THE STORE PRIOR TO
<br />REMOVAL OF WALLS, DOORS, FLOORS, AND COMMENCING WITH ANY WORK AND NOTIFY THE WALMART
<br />ELECTRICAL ITEMS INCLUDING CONDUITS AS MECHANICAL SERVICES CONSTRUCTION MANAGER OF ANY
<br />SHOWN ON DRAWING OR AS REQUIRED FOR DISCREPANCIES BETWEEN THESE PLANS AND THE EXISTING
<br />THE INSTALLATION OF NEW WORK FOR A CONDITIONS.
<br />COMPLETE JOB.
<br />3. ALL WORK SHALL BE DONE IN A SAFE AND WORKMANLIKE
<br />3. WHEN UTILITIES ARE REMOVED, CAP AND SEAL MANNER AND IN STRICT ACCORDANCE WITH THE LOCAL GOVERNING
<br />A MINIMUM OF 8" BELOW FINISH FLOOR OR A BUILDING CODE, NATIONAL ELECTRIC CODE, ADA—ADAAGS, AND ALL
<br />MINIMUM OF 6" ABOVE FINISHED CEILING. SHOW APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING
<br />ALL ABANDONED AND CAPPED UTILITIES ON JURISDICTION.
<br />AS—BUILTS, DRAWINGS, AND RECORDED
<br />DOCUMENTS. 4. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH
<br />KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR
<br />4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO RELATED FIELD. THE FAILURE TO ACQUAINT HIMSELF WITH THIS
<br />PROVIDE ADEQUATE SHORING, BRACING, AND KNOWLEDGE DOES NOT RELIEVE HIM OF ANY RESPONSIBILITY FOR
<br />SUPPORT SYSTEMS AND TO KEEP THE EXISTING PERFORMING HIS WORK PROPERLY. NO ADDITIONAL
<br />STRUCTURE INTACT AND IN A SAFE CONDITION COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT
<br />DURING THE REMOVAL OF STRUCTURAL ITEMS OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS
<br />AND NEW CONSTRUCTION. KNOWLEDGE.
<br />5. THE CONTRACTOR SHALL RETAIN A REGISTERED 5. THE EXISTING BUILDING SHALL BE PROTECTED FROM MOISTURE,
<br />PROFESSIONAL ENGINEER TO DESIGN THE DUST AND DEBRIS. INSTALL DUST PARTITIONS OR DRAPES AS
<br />SHORING AND SPECIFY DEMOLITION SHOWN OR AS REQUIRED TO KEEP DUST AND MOISTURE FROM
<br />PROCEDURES. WALMART PREMISES.
<br />6. IT IS THE CONTRACTOR'S RESPONSIBILITY FOR 6. ANY DAMAGE TO WALMART PROPERTY WHICH OCCURS DURING THE
<br />MEANS AND METHODS OF DEMOLITION AND NEW PROCESS OF CONSTRUCTION SHALL BE REPAIRED AT NO
<br />CONSTRUCTION. PRIOR TO THE EXCAVATION OF ADDITIONAL COST TO WALMART; THIS INCLUDES ALL MERCHANDISE.
<br />FOUNDATIONS ADJACENT TO THE EXISTING CONTRACTOR SHALL PAY WALMART THE COST FOR ALL DAMAGED
<br />STRUCTURE, PROVIDE ADEQUATE SUPPORT FOR MERCHANDISE.
<br />THE SUB —BASE TO PREVENT UNDERMINING.
<br />7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECEIVING,
<br />7. DURING DEMOLITION AND RECONSTRUCTION, THE HANDLING, AND STORAGE OF OWNER FURNISHED EQUIPMENT.
<br />CONTRACTOR SHALL COORDINATE WITH THE CONTRACTOR SHALL COORDINATE DELIVERY DATE CHANGES WITH
<br />WALMART MECHANICAL SERVICES CONSTRUCTION WALMART REFRIGERATION ADMINISTRATOR. CONTRACTOR SHALL
<br />MANAGER ANY REQUIRED SAFETY BARRIERS OR PROVIDE EITHER ON —SITE STORAGE CONTAINERS AND/OR OFF —SITE
<br />BARRICADES. REFER TO THE WALMART STORAGE FOR OWNER FURNISHED EQUIPMENT AND ANY OTHER
<br />MECHANICAL SERVICES CONSTRUCTION MANAGER CONSTRUCTION ITEMS. CONTRACTOR SHALL COORDINATE LOCATION
<br />FOR PHASING AND SCHEDULING DEMOLITION OF ANY ON —SITE STORAGE CONTAINERS WITH STORE MANAGEMENT
<br />AND NEW CONSTRUCTION. PRIOR TO PLACEMENT. CONTRACTOR IS RESPONSIBLE FOR
<br />SECURITY AND CONDITION OF OWNER FURNISHED EQUIPMENT KEPT
<br />8. IMMEDIATE SALVAGE/LEGAL DISPOSAL OF ALL IN STORAGE AND SHALL PROVIDE PERSONNEL TO RECEIVE AND
<br />DECOMMISSIONED EQUIPMENT SHALL BE THE MOVE EQUIPMENT.
<br />RESPONSIBILITY OF THE CONTRACTOR. AT THE
<br />DISCRETION OF THE WALMART MECHANICAL 8. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN THE
<br />SERVICES CONSTRUCTION MANAGER WALMART INTEGRITY OF ALL EXISTING SECURITY SYSTEMS. THE CONTRACTOR
<br />SHALL RETAIN THE OPTION TO OCCASIONALLY SHALL OBTAIN PERMISSION FROM THE WALMART STORE MANAGER
<br />SALVAGE EMS EQUIPMENT, VARIABLE FREQUENCY PRIOR TO THE MODIFICATION OF ANY EXISTING SECURITY SYSTEM
<br />DRIVE EQUIPMENT, COMPRESSORS, WALK—IN FOR THE OPENING (DEMOLITION) OF ANY EXTERIOR WALL.
<br />DOORS, EVAPORATORS, REFRIGERATED CASES,
<br />ETC. FROM REFRIGERATION EQUIPMENT TO BE 9. THE CONTRACTOR SHALL KEEP THIS AREA CLEAN AND FREE OF
<br />REPLACED DURING THE CAP—X PROJECT. THE DEBRIS AND IS TO REMOVE ALL TRASH AND DEBRIS FROM THE
<br />CONTRACTOR SHALL COORDINATE WITH THE CONSTRUCTION AREA DAILY. NO FLAMMABLE MATERIALS OR LIQUIDS
<br />WALMART MECHANICAL SERVICES CONSTRUCTION MAY BE STORED IN THE EXISTING BUILDING OR IN THE NEW
<br />MANAGER ALL ITEMS TO BE RETAINED BY ADDITION.
<br />WALMART PRIOR TO REMOVAL OF THE
<br />EQUIPMENT SHOWN ON THE DEMOLITION PLANS. 10. REMOVE ANY EXISTING ITEMS, SERVICES, FINISHES/OR SURFACES
<br />THE CONTRACTOR SHALL CAREFULLY REMOVE AS REQUIRED FOR THE INSTALLATION OF NEW CONSTRUCTION.
<br />ANY ITEMS TO BE RETAINED BY WALMART AND
<br />DELIVER THOSE ITEMS, READY FOR SHIPMENT, 11. PROVIDE FURRING FOR CONDUITS AND PIPING, SHOWN OR NOT,
<br />TO THE WALMART MECHANICAL SERVICES AND FINISH OUT FURRING TO MATCH ADJACENT EXISTING FINISHES.
<br />CONSTRUCTION MANAGER. ALL REMOVED ITEMS
<br />NOT ALLOCATED FOR SALVAGE BY WALMART 12. REPAIR, REROUTE, AND EXTEND ALL SERVICES, PIPING, CONDUIT
<br />SHALL BE THE CONTRACTOR'S RESPONSIBILITY OF EXISTING ITEMS AND EQUIPMENT AS REQUIRED DURING THE
<br />TO IMMEDIATELY REMOVE FROM THE JOB SITE CONSTRUCTION PROCESS FOR THE COMPLETE INSTALLATION AND
<br />AND ARRANGE DISPOSAL IN ACCORDANCE WITH OPERATION OF NEW EQUIPMENT. THIS INCLUDES ALL ITEMS
<br />LOCAL CODES. SHOWN OR NOT SHOWN ON THE DRAWINGS.
<br />13. RESET EXISTING EQUIPMENT OR RELATED ITEMS AS REQUIRED FOR
<br />PROPER OPERATION. WHERE EXISTING FINISHES ARE TO REMAIN,
<br />IT 2q I CLEAN, REPAIR, PATCH, AND/OR RE —PAINT AS NECESSARY TO `r
<br />6—A
<br />,lBLEND WITH ADJACENT SURFACES.
<br />14. CONSULT WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER
<br />er�(,`�,,, ) FOR COMPLETE APPLICABLE SCOPE OF WORK. THE CONTRACTOR
<br />/� �CJ S SHALL MAINTAIN THE REQUIRED NUMBER OF EXITS WITHIN THE
<br />CA /� / (` STORE. MAINTAIN EXIT SIGNS AND EMERGENCY LIGHTING AT ALL
<br />TIMES, AS REQUIRED BY THE LOCAL BUILDING OFFICIAL.
<br />REVIEW DATE � 1 I -j� 15. WALMART SHALL OCCUPY THE BUILDING DURING CONSTRUCTION.
<br />-- j� THE CONTRACTOR SHALL COORDINATE WITH WALMART STORE
<br />CITY OF ZEPHYRHIL_L MANAGER AND THE WALMART MECHANICAL SERVICES CONSTRUCTION
<br />PLANS EXgMINRR_-- MANAGER ALL CONSTRUCTION PROCEDURES WHICH WILL INTERFERE
<br />WITH THE NORMAL DAILY OPERATIONS OF THE STORE.
<br />16. THE CONTRACTOR SHALL OBTAIN PERMISSION FROM WALMART FOR
<br />ALL INTERRUPTIONS OF UTILITY SERVICES TO THE EXISTING
<br />BUILDING PRIOR TO THE INTERRUPTION. ACCIDENTAL
<br />INTERRUPTIONS SHALL BE REMEDIED IMMEDIATELY WITH
<br />ALL WORK SHALL COMPLY WITH ALL APPROPRIATE FORCES.
<br />PREVAILING CODES, FLORIDA BUILDING 17. ALL CAP—X REFRIGERATION PROJECTS ARE TO BE BID AS NIGHT
<br />CODE, NATIONAL ELECTRIC CODE AND WORK. THE CONTRACTOR IS TO ASSUME ALL WORK IS TO BE
<br />CITY OF ZEPHYRHILLS ORDINANCES CONDUCTED ONLY AS OVERNIGHT WORK. SOME WORK MAY BE
<br />ALLOWED DURING REGULAR WORKING HOURS TO FACILITATE
<br />COMPLETION SCHEDULES. WORK WILL ONLY BE PERMITTED DURING
<br />REGULAR WORKING HOURS WITH THE STORE MANAGEMENT'S
<br />AND/OR MECHANICAL SERVICES CONSTRUCTION MANAGER'S
<br />PERMISSION. WORK TO BE PERFORMED ON THE EXTERIOR OF THE
<br />BUILDING, ROOFTOP, BACK ROOM, BEHIND DUST WALLS, AND
<br />WORK THAT DOES NOT SIGNIFICANTLY INTERFERE WITH STORE
<br />OPERATIONS MAY BE ALLOWED WITH THE STORE MANAGEMENT'S
<br />AND/OR MECHANICAL SERVICES CONSTRUCTION MANAGER'S
<br />PERMISSION. THE CONTRACTOR SHALL PAY FOR ADDITIONAL
<br />SECURITY PERSONNEL TO SUPERVISE ACCESS TO THE BUILDING AS
<br />REQUIRED BY STORE MANAGEMENT. CONTRACTOR SHALL PROVIDE
<br />ALL SAFETY EQUIPMENT AND EXTERIOR LIGHTING AS REQUIRED TO
<br />MAINTAIN A SAFE WORKING ENVIRONMENT FOR WORK REQUIRED AT
<br />NIGHT. THE CONTRACTOR SHALL PREPARE, AND DELIVER TO STORE
<br />MANAGEMENT, A SCHEDULE OF WORK FOR THE ENTIRE PROJECT
<br />SCOPE OF WORK. THIS SCHEDULE WILL INCLUDE ALL PHASES OF
<br />WORK TO BE PERFORMED AND SHALL LIST THE START AND
<br />COMPLETION TIMES FOR EACH PHASE OF WORK. THE CONTRACTOR
<br />SHALL UPDATE THIS SCHEDULE WEEKLY AS CONSTRUCTION
<br />PROGRESSES.
<br />NOTE TO BIDDING CONTRACTORS
<br />THESE PLANS ARE TYPICALLY ISSUED FOR BID AS REDUCED "1/2 (HALF) SIZE" DOCUMENTS.
<br />SCALES SHOWN APPLY TO ORIGINAL "FULL SIZE" DOCUMENTS ONLY. DO NOT SCALE
<br />DRAWINGS, FIELD VERIFY ALL DIMENSIONS.
<br />EXISTING CONDITIONS WERE TAKEN EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
<br />FROM ORIGINAL DRAWINGS AND MAY A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
<br />NOT REFLECT EXACT "AS —BUILT" SPECIFICATIONS IN THEIR RELATED FIELD. THE
<br />CONDITIONS. CONTRACTOR SHALL FAILURE TO ACQUAINT HIMSELF WITH THIS
<br />FIELD VERIFY ALL EXISTING CONDITIONS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY
<br />NOTE: ALL WORK ON THIS SHEET IS PRIOR TO SUBMITTING FINAL BIDS. OF PERFORMING HIS WORK PROPERLY. NO
<br />TO BE COMPLETED BY WALMART CONTRACTOR SHALL CAREFULLY ADDITIONAL COMPENSATION SHALL BE ALLOWED
<br />APPROVED CONTRACTOR. COORDINATE NEW WORK AND BECAUSE OF CONDITIONS THAT OCCUR DUE
<br />DEMOLITION WITH ALL OTHER TO FAILURE TO FAMILIARIZE WORKERS WITH THIS
<br />DISCIPLINES AND EXISTING CONDITIONS. KNOWLEDGE.
<br />ZN
<br />ow
<br />o
<br />0
<br />N
<br />O
<br />Oco
<br />mN
<br />Z49
<br />W"�
<br />• OlZO
<br />OW
<br />WZO
<br />X
<br />O
<br />a
<br />}
<br />Ld OwLOZ 1
<br />-
<br /><z ,c("
<br />LL fir .wcn�wzo
<br />Of Lam �za`cRQ5060-
<br />W,* z a0 0Ld <N3
<br />(n
<br />O wI.- ll(,,�JJ 1-JLL, zo
<br />L a
<br />Ls=O=N�a
<br />tn�w��VOXcnwpjQ�
<br />O 3tn Q �li�NwK Z d La, oo
<br />Q 0-003waia- Na
<br />z-a �n w' o w<
<br />J <CWLW<Z���r�i' _fr
<br />0 (lI 0wNWKFwUWWz0z
<br />a Nac��� �WWa?3eLd0
<br />odD)zoa(xaaawoam
<br />ca co
<br />o w �17!�I�
<br />v � O
<br />co
<br />w
<br />z
<br />GCi
<br />0
<br />ISSUE BLOCK
<br />CHECKED BY: RDF/JAL
<br />DRAWN BY: RDF
<br />DOCUMENT DATE: 01 /03/12
<br />TITLE
<br />SHEET
<br />SHEET:
<br />Tl
<br />
|