Laserfiche WebLink
TABLE 1A:WOOD DECKS-NEW CONSTRUCTION,REROOF(Tear-Off)or RECOVER <br /> SYSTEM TYPE C: MECHANICALLY ATTACHED INSULATION,BONDED ROOF COVER <br /> System Deck Top Insulation layer MOP <br /> Base Insulation Layer Roof Cover(Note 16) <br /> No. (Note 1) Type I Fasteners Attach (Psf) <br /> W-1 Min.19/32"plywood or (Optional)One or more layers, Min.1.5-inch Poly ISO 1,H-Shield,ACFoam II, Note 2 1 per 2 fP Mule-Hide TPO-c/TPO-c BA or Aqua -45 0, <br /> wood plank any combination,loose laid Poly ISO 2 or ENRGY 3 1 Base 120 BA <br /> TABLE 1B: WOOD DECKS—NEW CONSTRUCTION,REROOF(Tear-Off)or RECOVER <br /> SYSTEM TYPE D-1: INSULATED,MECHANICALLY ATTACHED ROOF COVER <br /> System Roof Deck Insulation Layer(Note 14) Roof Cover MDP <br /> No. Type Attach Membrane Fasteners Spacing (PA <br /> Min.19/32-inch plywood or wood plank at max.24"spans One or more Preliminarily Mule-Hide Mule-Hide EHD 6-inch o.c.within 5.5-Inch wide laps spaced 90.5-inch <br /> W-2 attached using 8d ring shank nails spaced 6"D.C.in the field layers,any Fasteners and 2.4 -52.5 <br /> and#10 ring shank nails spaced 4"D.C.at the perimeter combination attached TPO-c Seam Plates - D.C. Outside of lap sealed with 1.5-inch heat-weld <br /> Min.19/32-inch plywood or wood plank at max.24"spans One or more Mule-Hide EHD <br /> W-3 attached using Sd ring shank nails spaced 6"D.C.in the field layers,any Preliminarily Mule-Hide Fasteners and 2.4 O D.C.within sealed <br /> wide laps spaced-wee Inch -67.5 <br /> and#10 ring shank nails spaced 4"D.C.at the perimeter combination attached TPA Seam Plates C.C.o.c.Outside of lap sealed with SS-inch heat-weld <br /> 6-inch D.C.within 5-inch wide laps spaced 67-inch D.C. <br /> Min.23/32-inch OSB at max.24-inch spans attached using One or more Mule-Hide EHD Outside of lap sealed with 1.5-Inch heat-weld and 6- <br /> W-4 8d ring shank nails spaced 6"D.C.in the field and 8"D.C.at layers,any Preliminarily attached tckedTPA Fasteners Mule-Hide Fasteners and 2A inch D.C.in one row centered between the laps. -67.5 <br /> intermediate supports combination Seani Plates Center row Covered with 6-inch wide cover strip <br /> sealed with 1.5-inch heat weld at all edges <br /> TABLE 1C:WOOD DECKS-NEW CONSTRUCTION,REROOF(TEAR-OFF)OR RECOVER <br /> SYSTEM TYPE D-3:INSULATED,MECHANICALLY ATTACHED BASE SHEET,BONDED ROOF COVER <br /> System insulation(Note 14) Base Sheet Roof Cover MDP <br /> No Deck(Note 1) Type Attach Base Sheet Fasteners Attach Membrane Adhesive (Psf) <br /> Min.19/32-inch plywood at One or more Atlas Summit Mule-Hide Drill Point 12-inch D.C.at the 4-inch laps and 12- Self- <br /> layers,max.24-inch spans;#10 x 2- layers,any Loose-laid Synthetic Fastener and Mule-Hide 2" inch D.C.at three,equally spaced Mule-Hide SA-TPO adhered -120.0 <br /> inch wood screws,6-Inch o.c. combination Underlayment Seam Plate rows in the center of the sheet. <br /> Exterior Research and Design,I.I.C.d/b/a Trinity I ERD Evaluation Report M15060.06.09-R4 for FL12772-R4 <br /> Certificate of Authorization#9503 FBC NON-HVHZ EVALUATION;Mule-Hide TPO-c Single Ply Roof Systems Revision 4:04/03/2017 <br /> Prepared by: Robert.Nieminen,PE-59166 Mule-Hide Products Co.,Inc.;(608)365-3111 Appendix 1,Page 4 of 26 <br />