My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-20704
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-20704
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 8:37:06 AM
Creation date
1/14/2020 8:37:01 AM
Metadata
Fields
Template:
Building Department
Company Name
HCRA PROPERTIES I LLC
Building Department - Doc Type
Permit
Permit #
19-20704
Building Department - Name
HCRA PROPERTIES I LLC
Address
38220 HENRY DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DONNELLY ENGINEERING ELECTRICAL <br /> 1.12 COORDINATION <br /> A. General: Compare drawings and specifications with those of other trades and report any discrepancies <br /> between them to the Engineer. Obtain from the Engineer written instructions to make the necessary <br /> changes in any of the affected work. All work shall be installed in cooperation with other trades installing <br /> interrelated work. Before installation, all trades shall make proper provisions to avoid interferences in a <br /> manner approved by the Engineer. <br /> B. Adjustments: Locations of conduit and equipment shall be adjusted to accommodate the work with <br /> interferences anticipated and encountered. Determine the exact routing and location of all systems prior <br /> to fabrication or installation. <br /> C. Priorities: Lines which pitch shall have the right of way over those which do not pitch. For example, <br /> plumbing drains shall normally have the right of way. Lines whose elevations cannot be changed shall <br /> have the right of way over lines whose elevations can be changed. <br /> D. Modifications: Offsets and changes of direction in all conduit systems shall be made as required to <br /> maintain proper headroom and pitch of sloping lines whether or not indicated on the drawings. Provide <br /> elbows, boxes, etc., as required to allow offsets and changes to suit job conditions. <br /> E. Replacement: All work shall be installed in a way to permit removal (without damage to other parts) of <br /> all other system components provided under this Contract requiring periodic replacement or <br /> maintenance. All conduits shall be arranged in a manner to clear the openings of swinging overhead <br /> access doors as well as ceiling tiles. <br /> F. Layout: The Contract Drawings are diagrammatic only intending to show general runs and locations of <br /> conduit and equipment, and not necessarily showing all required offsets, details and accessories and <br /> equipment to be connected. All work shall be accurately laid out with other Trades to avoid conflicts and <br /> to obtain a neat and workmanlike installation which will afford maximum accessibility for operation, <br /> maintenance and headroom. <br /> G. Contract Conflicts: Where discrepancies exist in the Scope of Work as to what Trade provides items <br /> such as starters, disconnects, flow switches, etc. such conflicts shall be coordinated between the <br /> divisions involved. It is the intent of the Contract Documents that all work shall be provided complete as <br /> one bid price. <br /> H. Drawing Conflicts: Where drawing details, plans or specification requirements are in conflict and <br /> where sizes of the same item run are shown to be different within the contract documents, the most <br /> stringent requirement shall be included in the Contract. Systems and equipment called for in the <br /> specification or as shown on the drawings shall be provided under the Contract of each trade as if it was <br /> required by both the drawings and specifications. Prior to ordering or installation of any portion of work. <br /> which appears to be in conflict, such work shall be brought to Architect's attention for direction as to, <br /> what is to be provided. <br /> I. Working Clearances: Working clearances about electrical equipment shall be as referenced in NEC <br /> 110, and shall include new equipment installed in existing ceiling spaces. <br /> J. Motor Circuits: Contractor shall coordinate circuit breaker, wire and conduit sizes with actual motors <br /> supplied. All changes required shall be made at no additional cost to the Owner. <br /> 1.13 DEMOLITION <br /> A. General: During the execution of the work, all required relocation, rerouting, etc., of existing equipment <br /> and systems in the existing building areas where the work is required, shall be performed by the <br /> Heartland Health Care Center of Zephyrhills-3181 16010-7 DE No 217032 <br /> 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 <br />
The URL can be used to link to this page
Your browser does not support the video tag.