Laserfiche WebLink
DONNELLY ENGINEERING ELECTRICAL <br /> and acceptance received prior to ordering equipment. Obtain acknowledgment of receipt of the email <br /> submittal. The Engineer's receipt date will be the basis of the date of the submittal. All shop drawings <br /> shall be submitted on the same day. Include, with the submission, an index of shop drawings sent. <br /> Multiple emails can be done as long as they are immediately consecutive. List how many emails have <br /> been sent e.g 1 of 6 etc. All accepted submittals shall be printed in a binder and made available at the <br /> construction site for review. <br /> B. Responsibility: It is the Contractors responsibility to provide all material in accordance with the <br /> contract documents and specifications. Material not provided in accordance with the contract <br /> documents and specifications will be removed and replaced at the Contractors expense. The <br /> Contractor shall submit one of the manufacturers specified. No substitutions are allowed except where <br /> a 10 day prior is specified. <br /> C. Official Record: The shop drawing submittal shall become the official record of the materials to be <br /> installed. If materials are installed which do not correspond to the record submittal they shall be <br /> removed from the project without any additional cost to the Owner. Project completion delays for <br /> construction will not be allowed as a result of the material removal or handling. <br /> D. Information: The shop drawing record submittal shall include the following information to the extent <br /> applicable to the particular item; <br /> 1. Manufacturer's name and product designation or catalog number. <br /> 2. Standards or specifications of ANSI, ASTM, ICEA, IEEE, ISA, NEMA, NFPA, OSHA, UL, or <br /> other organizations, including the type, size, or other designation. <br /> 3. Dimensioned plan, sections, and elevations showing means for mounting, conduit <br /> connections, and grounding, and showing layout of components. <br /> 4. Materials and finish specifications, including paints. <br /> 5. List of components including manufacturer's names and catalog numbers. <br /> 6. Internal wiring diagram indicating all connections to components and the terminals for <br /> external connections. <br /> 7. Manufacturer's instructions and recommendations for installation, operation, and <br /> maintenance. <br /> 8. Manufacturer's recommended list of spare parts. <br /> E. Preparation: Prior to submittal, all shop drawings shall be checked for accuracy and contract <br /> requirements. Shop drawings shall bear the date checked and shall be accompanied by a statement <br /> that the shop drawings have been examined for conformity to Specifications and Drawings. This <br /> statement shall also list all discrepancies with the Specifications and Drawings. Shop drawings not so <br /> checked and noted shall be returned to Contractor unreviewed. <br /> F. Basis of Review: The Engineer's review shall be for compliance with the Contract documents <br /> G. Responsibility: The responsibility that all dimensions are confirmed and correlated with proper <br /> coordination of all other trades shall be included as part of the Contract Documents. The responsibility <br /> and the necessity of providing materials and workmanship required by the Specifications and Drawings <br /> which may not be indicated on the shop drawings shall be included as part of the Contract Documents. <br /> The Contractor is responsible for any delays in job progress occurring directly or indirectly from late <br /> submissions or resubmissions of shop drawings, product data, or samples. <br /> H. Ordering Equipment: No material shall be ordered or shop work started until the Engineer has <br /> officially. received the shop drawing record submittal and has formally released the Contractor for <br /> processing. <br /> I. Brochure Requirements: Provide Technical Information Brochures at the start of construction or no <br /> later than 30 days after Award of the Contract. Each brochure shall consist of an adequately sized, <br /> Heartland Health Care Center of Zephyrhills-3181 16010-9 DE No 217032 <br /> 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 <br />