Laserfiche WebLink
DONNELLY ENGINEERING ELECTRICAL ' <br /> hard-cover, 3-ring binder for 8-1/2" X 11" sheets. Provide correct designation on outside cover and on <br /> end of brochure. When one binder is not enough to adequately catalog all data, additional binders shall <br /> be provided. The intent of the brochure is a printed hard copy of which will be present at the job site and <br /> accessible to the Engineer and owner's representative. All brochures shall become part of the record <br /> documents. <br /> J. Brochure Contents: First sheet in the brochure shall be a photocopy of the Electrical Index pages in <br /> these specifications. Second sheet shall be a list of Project Addresses for this project. Third sheet shall <br /> list Project Information. Provide reinforced separation sheets tabbed with the appropriate specification <br /> reference number and typed index for each section in the Electrical Schedule. Technical Information <br /> consisting of marked catalog sheets or shop drawings shall be inserted in the brochure in proper order <br /> on all items specified and shown on drawings. At the end of the brochure, provide and insert a copy of <br /> the specifications for this Division and all addenda applicable to this Division. <br /> K. Contractor's Review: Review the brochures before submitting to the Engineer. No request for <br /> payment shall be considered until the brochure has been reviewed, stamped and submitted for review. <br /> L. Cost: Submit cost breakdown on work in the Technical Information Brochures. The cost of material and <br /> labor for each item shall be indicated. The cost of fittings and incidentals are not required. <br /> M. Title Drawings: Title drawings to include identification of project and names of Engineer, Contractors, <br /> and supplier, data, number sequentially and indicate in general; <br /> 1. Fabrication and Erection dimensions. <br /> 2. Arrangements and sectional views. <br /> 3. Necessary details, including complete information for making connections with other work. <br /> 4. Kinds of materials and finishes. <br /> 5. Descriptive names of equipment. <br /> 6. Modifications and options to standard equipment required by the contract. <br /> 7. Leave blank area, size approximately 4 by 2-1/2 inches, near title block (for Engineer's stamp <br /> imprint). <br /> 8. In order to facilitate review of shop drawings, they shall be noted, indicating by cross reference <br /> the contract drawings, notes, and specification paragraph numbers where items occur in the <br /> contract documents. <br /> 9. See specific sections of specifications for further requirements. <br /> N. Technical Data: Submit technical data verifying that the item submitted complies with the requirements <br /> of the specifications. Technical data shall include manufacturer's name and model number, dimensions, <br /> weights, electrical characteristics, and clearances required. Indicate all optional equipment and <br /> changes from the standard item as called for in the specifications. Provide drawings, or diagrams, <br /> dimensioned and in correct scale, covering equipment, showing arrangement of components and overall <br /> coordination. <br /> O. Samples: .Provide two samples of materials and finishes. Each sample shall be tagged, labeled, or <br /> marked, "Sample of .......... for (PROJECT). Accompany samples with copy, in duplicate of <br /> manufacturer's instructions regarding installation, and maintenance. <br /> P. Same Manufacturer: In general, relays, contactors, starters, motor control centers, switchboards, <br /> panelboards, dry type transformers, disconnect switches, circuit breakers, manual motor starter <br /> switches, etc., shall be supplied and manufactured by the same manufacturer. <br /> Heartland Health Care Center of Zephyrhills-3181 16010-10 DE No 217032 <br /> 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 <br />