Laserfiche WebLink
DONNELLY ENGINEERING ELECTRICAL <br /> C. Performance: Personnel shall not be used in the performance of the installation of material and <br /> equipment who, in the opinion of the Engineer or owners representative or contractor are deemed to be <br /> careless or unqualified to perform the assigned tasks. Material and equipment installations not in <br /> compliance with the Contract Documents, or installed with substandard workmanship and not <br /> acceptable to the Engineer, shall be removed and reinstalled by qualified craftsmen, at no change in the <br /> contract price. <br /> 3.2 PROTECTION AND CLEAN UP <br /> A. Protection and Restoration: Suitably protect all equipment provided under this Division during <br /> construction. Restore all damaged surfaces and items to "like new" condition before a request for <br /> substantial completion inspection. <br /> B. Handling: All materials shall be properly protected and all conduit openings shall be temporarily closed <br /> by the Contractor to prevent obstruction and damage. Post notice prohibiting the use of all systems <br /> provided under this Contract, prior to completion of work and acceptance of all systems by the Owner's <br /> representative. The Contractor shall take precautions to protect his materials from damage and theft. <br /> C. Safeguards: The Contractor shall furnish, place and maintain proper safety guards for the prevention of <br /> accidents that might be caused by the workmanship, materials, equipment or systems provided under <br /> this contract. <br /> D. Cleanup: Keep the job site free from all debris and rubbish. Remove all debris and rubbish from the site <br /> and leave premises in clean condition on a daily basis. <br /> 3.3 SYSTEMS GUARANTEE <br /> A. General: Provide a one-year guarantee. This guarantee shall be by the Contractor to the Owner for <br /> any defective workmanship or material which has been provided under this Contract at no cost to the <br /> Owner for a period of one year from the date of substantial completion of the System. The guarantee <br /> shall include all lamps, for ninety days after date of Substantial Completion of the System. Explain the <br /> provisions of guarantee to the Owner at the"Demonstration of Completed System". <br /> 3.4 FINAL OBSERVATION <br /> A. General: All work shall be completed, and all forms and other information shall be submitted for <br /> acceptance one week prior to the request for final observation of the installation. <br /> 3.5 SPECIAL CONSIDERATIONS <br /> A. Attire: All workmen shall wear proper work clothing attire at all times. Shirts shall not be removed. <br /> Cleanliness of clothing shall not cause discomfort or problems with building residents and employees. <br /> END OF SECTION <br /> Heartland Health Care Center of Zephyrhills-3181 16010-14 DE No 217032 <br /> 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 <br />