My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21503
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 6:53:03 AM
Creation date
4/15/2020 6:52:36 AM
Metadata
Fields
Template:
Building Department
Company Name
CITY OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
19-21503
Building Department - Name
CITY OF ZEPHYRHILLS (POLICE DEPT)
Address
6118 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 23 05 13—ELECTRICAL WORK ASSOCIATED WITH MECHANICAL EQUIPMENT <br /> PART 1 -GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. The Bidding Requirements and Contractual Conditions set forth in Division 01 apply to this <br /> section. <br /> B. Examine other sections of the Project Manual for requirements which affect work of this section <br /> whether or not such work is specifically mentioned in this section. <br /> 1.2 RELATED WORK <br /> A. Electrical work required: <br /> 1. All power wiring and conduit. (Provided under Division 26). <br /> 2. Control wiring. (Provided under Division 23). <br /> 3. Motor disconnects. (Provided under Division 26). <br /> 4. Starters provided under Division 26, except when furnished with packaged equipment; <br /> wiring under Division 26. <br /> 5. Conduit and control wiring for Division 23 work. <br /> 1.3 QUALITY ASSURANCE <br /> A. All electrical work shall conform to the National Electrical Code (NFPA 70). <br /> B. Electrical equipment shall conform to NEMA standards and shall be UL listed. <br /> 1.4 SUBMITTALS <br /> A. Furnish to Electrical Contractor equipment shop drawings that indicate all required power <br /> connections. <br /> B. Prepare complete terminal-to-terminal wiring diagrams that show terminal designation on control <br /> items and equipment. Diagrams may be part of temperature control submittals. <br /> C. Provide letter on mechanical subcontractor's letterhead certifying that coordination has taken <br /> place with the electrical subcontractor and all electrical requirements for mechanical equipment <br /> have been met. Additionally, mechanical submittals shall be provided to the electrical <br /> subcontractor. <br /> PART 2-PRODUCTS <br /> 2.1 MOTORS <br /> A. All motors shall be premium efficiency. <br /> B. General purpose motors shall be open drip-proof conforming to NEMA Design, Class B <br /> insulation, continuous 40° C ambient, 60 Hz, 1.15 service factor, and 1800 RPM maximum speed <br /> unless specified otherwise. Voltage and phase shall be as specified. <br /> C. Motors shall be single phase below 3/4 HP and three phase 3/4 HP and larger, unless specified <br /> otherwise. <br /> 1. Single phase motors shall have built in overload protection. <br /> CEA#18010 ELECTRICAL WORK ASSOCIATED WITH MECHANICAL EQUIPMENT 23 05 13- 1 <br /> COPYRIGHT©2018 CONSULTING ENGINEERING ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.