2. Temperature and humidity shall be measured and recorded in each room during each <br /> season's testing. Test and calibrate all temperature and humidity sensors. Provide all <br /> readings in the final report. <br /> 3. Notification to perform the opposite season test and balance will be made by the Owner. <br /> The work shall then be scheduled by mutual agreement. The report shall be submitted <br /> within fifteen (15) days after completion of the work and shall include: <br /> a. Characterization of the system quality of operation. <br /> b. Data and results of test and balance work. <br /> C. Description of system deficiencies found and recommendations. <br /> D. Cooperate with the test and balance agency in establishing a schedule to perform this work. If <br /> changes in the construction schedule affecting test and balance work are necessary, all such <br /> changes shall be coordinated with the test and balance firm. <br /> E. Additional balancing dampers required to effect proper air balance shall be provided by the <br /> Contractor at no additional cost to the contract. The test and balance firm shall furnish the <br /> Contractor and Project Architect/Engineer at the end of each day a list of items that must be <br /> added, repaired, replaced or adjusted. <br /> F. Air filters shall be replaced before proceeding with test and balance and thereafter as required by <br /> the test and balance firm. <br /> G. Systems shall be placed into service using approved startup procedures. The Contractor shall be <br /> responsible for proper initial setting and adjustment of HVAC equipment furnished and installed <br /> by him and shall verify same for the test and balance firm. <br /> H. Contractor shall provide test openings as required, shall operate HVAC equipment and provide <br /> trade persons to assist and make adjustments for test and balance and commissioning during the <br /> process. <br /> I. The test and balance firm shall periodically visit the site during construction of the HVAC system. <br /> No less than two visits shall be made. After each visit, the test and balance firm shall report in <br /> writing to the Architect, with copy to the Engineer, its observations from the visit and potential <br /> problem areas. Should methods, materials or workmanship being used adversely affect <br /> balancing and adjusting work, the test and balance agency shall report its findings in the report to <br /> the Architect with recommendations for correction. <br /> J. The test and balance firm executing this test and balance work shall hold valid Certificate of <br /> Authorization from the State of Florida Board of Professional Engineers to provide services under <br /> the firm name. <br /> K. The test and balance firm shall carry out the test and balance work in accordance with the AABC <br /> National Standards for Total Systems Balance or the NEBB Procedural Standard for Testing, <br /> Adjusting and Balancing of Environmental systems, and in conformance with ASHRAE <br /> Handbook, Testing,Adjusting and Balancing. <br /> L. The Contractor shall furnish to the testing and balancing agency a complete set of current plans <br /> and specifications, addenda, shop drawings, schedules and change orders as may be required. <br /> 1.4 QUALITY ASSURANCE <br /> A. Installer: A firm with not less than 5 years of similar experience and certified by Associated Air <br /> Balance Council (AABC) or NEBB in testing and balancing disciplines similar to those required for <br /> this project shall be employed. <br /> B. Industry Standards: Comply with ASHRAE recommendations pertaining to measurements, <br /> CEA#18010 TESTING,ADJUSTING AND BALANCING 23 05 93-2 <br /> COPYRIGHT©2018 CONSULTING ENGINEERING ASSOCIATES, INC. <br />