My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21503
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 6:53:03 AM
Creation date
4/15/2020 6:52:36 AM
Metadata
Fields
Template:
Building Department
Company Name
CITY OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
19-21503
Building Department - Name
CITY OF ZEPHYRHILLS (POLICE DEPT)
Address
6118 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 23 75 33—100% OUTSIDE AIR UNITS <br /> PART 1 -GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of Contract, including General and supplementary Conditions <br /> and Division 01 specification sections, apply to work of this section. <br /> B. Examine other sections of the Project Manual for requirements which affect work of this section <br /> whether or not such work is specifically mentioned in this section. <br /> C. Section 23 00 00- HVAC applies to work of this section. <br /> 1.2 SUBMITTALS <br /> A. Submit manufacturer's technical product data, including dimensions, ratings, electrical <br /> characteristics, weight, capacities, materials of construction, and installation instructions <br /> B. Submit manufacturer's assembly-type shop drawings showing all piping and electrical <br /> connections and all mounting requirements. Show methods of fastening and assembly of <br /> components. Provide wiring diagrams. <br /> C. Submit manufacturer's maintenance data including parts lists. Include these data, product data, <br /> and shop drawings in maintenance manual; in accordance with requirements of Division 1. <br /> PART 2-PRODUCTS <br /> 2.1 100% OUTDOOR AIR DEHUMIDIFICATION UNIT-GENERAL <br /> A. Test and rate the 100% Outdoor Air Units in accordance with ARI Standard 210, 240 and 360 as <br /> applicable, and provide certified rating seal. Sound test and rate units in accordance with ARI <br /> Standard 270. <br /> B. Construct refrigeration system of split system units in accordance with ASHRAE 15 (ANSI B 9.1) <br /> "Safety Code for Mechanical Refrigeration". <br /> C. Provide split system units that are designed, manufactured, and tested in accordance with UL or <br /> ETL requirements. <br /> D. The complete unit shall be built and tested in the USA. All parts and components shall be <br /> domestic, brand name, UL or ETL listed, and readily available locally. The manufacturer of the <br /> dehumidification system shall have a minimum of five (5) years of experience in the production of <br /> these systems, including local reference installations <br /> E. Provide a heavy-duty industrial moisture-removal unit as scheduled and detailed on the Contract <br /> Documents. The unit is to include the following minimum components: scroll compressor(s), <br /> dehumidification/cooling coil, liquid sub-cooling reheat coil, receiver, blower, blower motor, <br /> controls and condenser. Each unit shall be provided with a reheat lockout for first stage sensible <br /> cooling (pull cooling option). <br /> F. The following are minimum requirements on all 100% outside air dehumidifying units: <br /> 1. Compressors must be of scroll type. <br /> 2. Eight(8) row direct expansion coil. <br /> CEA#18010 100% OUTSIDE AIR UNITS 23 75 33- 1 <br /> COPYRIGHT©2018 CONSULTING ENGINEERING ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.