Laserfiche WebLink
a <br /> 21 Tamper- Resistant.Receptacles in accordance with 406.11 ofthe-2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet atoun&the structure. <br /> 25:.R403.5.3Hot water.pipe insulation. <br /> Insulation for hot water pipe With'a minimum thermal resistance (R-value) of.R-3 shall be applied to the <br /> following: <br /> Piping 3/:inch (1.9.1 mm)and larger in.:nominal diameter. <br /> Piping serving more than:one dwelling unit. <br /> Piping located.outside the conditioned space.. <br /> Piping from the.water heater to a distribution manifold:_ <br /> Piping located under.a floor slab: <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.-Blower.door-test shall be provilded before C.O. <br /> 26.A copy of the energy cacls shall be.with permit at all times. <br /> 27. Cony of final'insulation report shall be provided with permit before final <br /> 28.No fence, pool or screen enclosure Is issued with Ih is permit. . <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way. <br /> A.D.A.-.Americans with Disabilities Act N.E.C.-National Electric Code(2016) . <br />