Laserfiche WebLink
PLUMBING FIXTURES <br />II 11 1 1 1 1 I <br />PART1- GENERAL <br />1.01 SUMMARY <br />A. RELATED DOCUMENTS: PROVISIONS OF THE CONTRACT INCLUDING CONDITIONS OF THE CONTRACT AND <br />DRAWINGS APPLY TO THIS SECTION. <br />B. DESCRIPTION: PLUMBING FIXTURES ARE INDICATED BY CONTRACT DOCUMENTS AND SHALL INCLUDE WORK <br />NECESSARY AND INCIDENTAL TO COMPLETION AND PERFORMANCE OF THE WORK. <br />C. INCLUDED: PLUMBING FIXTURES INCLUDE, BUT ARE NOT LIMITED TO, FOLLOWING: <br />1. SINKS. <br />2. EYE WASH STATIONS. <br />E. RELATED WORK: <br />1. PLUMBING INSULATION. <br />2. UNDERGROUND PLUMBING. <br />3. ABOVEGROUND PLUMBING. <br />4. PLUMBING EQUIPMENT. <br />1.02 SYSTEM DESCRIPTION <br />A. PLUMBING FIXTURE STANDARDS: COMPLY WITH APPLICABLE PLUMBING CODE PERTAINING TO MATERIALS AND <br />INSTALLATION OF PLUMBING FIXTURES. <br />B. HANDICAPPED STANDARDS: COMPLY WITH MERICANS WITH DISABILITIES ACT (ADA) AND ANSI Al17.1 STANDARD <br />PERTAINING TO PLUMBING FIXTURES FOR HANDICAPPED. <br />C. FEDERAL STANDARDS: COMPLY WITH APPLICABLE FS WW-P-541 SERIES SPECIFICATIONS PERTAINING TO <br />PLUMBING FIXTURES. <br />D. ANSI STANDARDS: COMPLY WITH APPLICABLE ANSI STANDARDS PERTAINING TO PLUMBING FIXTURES AND <br />SYSTEMS. <br />E. ARI LABELS: PROVIDE DRINKING -WATER COOLERS WHICH ARE RATED WITH CERTIFIED IN ACCORDANCE WITH <br />APPLICABLE AIR CONDITIONING AND REFRIGERATION INSTITUTE STANDARDS. <br />F. PDI STANDARDS: COMPLY WITH PDI STANDARDS PERTAINING TO PLUMBING FIXTURE SUPPORTS. <br />G. UL LABELS: PROVIDE DRINKING WATER COOLERS WHICH ARE UL LISTED AND LABELED. <br />1.03 QUALITY ASSURANCE <br />A. MANUFACTURER QUALIFICATIONS: MANUFACTURER SHALL HAVE 5 YEARS MINIMUM DOCUMENTED EXPERIENCE <br />IN DESIGN, PRODUCTION, FABRICATION AND INSTALLATION OF TYPE WORK REQUIRED FOR THE WORK. UPON <br />REQUEST, PROVIDE PROOF OF QUALIFICATIONS. <br />B. INSTALLER QUALIFICATIONS: INSTALLER SHALL HAVE 5 YEARS MINIMUM DOCUMENTED EXPERIENCE IN DESIGN, <br />ENGINEERING, DETAILING, FABRICATION, INSTALLATION AND MAINTENANCE OF TYPE AND QUALITY REQUIRED <br />FOR WORK AND SHALL BE ACCEPTABLE TO MANUFACTURER. INSTALLER SHALL MAINTAIN AND HAVE <br />MAINTAINED A SERVICE CENTER WITH PARTS INVENTORY AND MANUFACTURER TRAINED PERSONNEL FOR 5 <br />YEARS MINIMUM. UPON REQUEST, PROVIDE PROOF OF QUALIFICATIONS. <br />1.04 SUBMITTALS <br />C. PRODUCT DATA: SUBMIT PRODUCT SPECIFICATIONS, TECHNICAL DATA, STANDARD DETAIL DRAWINGS AND <br />INSTALLATION INSTRUCTIONS OF MANUFACTURER FOR EACH PRODUCT, COMPONENT AND FINISH OF WORK. <br />INCLUDE PUBLISHED DATA, CERTIFIED CONFORMANCE REPORT OR CERTIFIED LABORATORY TEST REPORT OF <br />MANUFACTURER SUBSTANTIATING EACH PROPOSED PRODUCT MEETS REQUIREMENTS OF CONTRACT <br />DOCUMENTS AND HAS BEEN TESTED WITH ADJACENT PRODUCTS IDENTICAL TO PRODUCTS TO BE USED IN <br />WORK AND IS INTENDED FOR APPLICATION. <br />1.05 PRODUCT HANDLING <br />D. DELIVER PLUMBING FIXTURES INDIVIDUALLY WRAPPED IN FACTORY CONTAINERS. <br />E. HANDLE PLUMBING FIXTURES CAREFULLY TO PREVENT BREAKAGE, CHIPPING AND SCORING THE FIXTURE UNIT. <br />DO NOT INSTALL DAMAGED PLUMBING FIXTURES; REPLACE WITH NEW NON -DAMAGED UNITS. <br />1.06 PROJECT CONDITIONS <br />F. PROTECTION: INSTALLER SHALL PROTECT PLUMBING FIXTURES DURING CONSTRUCTION PERIOD, TO AVOID <br />CLOGGING WITH CONSTRUCTION MATERIALS AND DEBRIS AND TO PREVENT DAMAGE FROM TRAFFIC AND <br />OTHER WORK. <br />PART 2- PRODUCTS <br />2.01 GENERAL <br />A. PLUMBING FIXTURES SHALL BE INSTALLED IN A NEAT, FINISHED AND UNIFORM MANNER, WITH ALL REQUIRED <br />SERVICE CONNECTIONS PROPERLY MADE. FIXTURES SHALL BE RIGIDLY SUPPORTED IN A MANNER SO THAT NO <br />STRAIN WILL BE TAKEN BY PIPE CONNECTIONS. FIXTURES INSTALLED AGAINST FINISHED SURFACES SHALL BE <br />PROTECTED WITH SUPPORTS SO DESIGNED THAT WEIGHT OF FIXTURE WILL NOT BE CARRIED ON FINISHED <br />SURFACES. SUBMIT DETAILS OF SUPPORTS FOR ACCEPTANCE BY ARCHITECT BEFORE INSTALLATION. <br />B. EXPOSED METAL WORK OF FIXTURES, ALL FAUCETS, TRAPS, FLUSH VALVES, VACUUM BREAKERS, GRATES OF <br />DRAINS, SCREWS, RIM GUARDS, STOPS AND TRIMMINGS AND ALL EXPOSED PIPE FROM FIXTURES SHALL BE <br />BRASS, HEAVILY CHROMIUM PLATED AND POLISHED UNLESS OTHERWISE INDICATED ON DRAWINGS. PROVIDE <br />WASTE AND SUPPLY LINES AT ALL FIXTURES WITH CHROMIUM PLATED BRASS FLOOR AND WALL FLANGES WITH <br />SET SCREWS. <br />2.02 FIXTURE CONNECTIONS <br />A. CONNECTIONS TO PLUMBING FIXTURES SHALL BE OF SIZES AS INDICATED ON DRAWINGS. WHERE THESE SIZES <br />MAY BE IN CONFLICT WITH CODE SIZES, INSTALL THE LARGER OF THE TWO. WHERE FIXTURES ARE NOT LISTED, <br />THE SIZES RECOMMENDED BY MANUFACTURER SHALL BE USED. <br />2.03 TRAPS <br />A. EACH WASTE THROUGHOUT SHALL BE PROVIDED WITH A TRAP AT OR NEAR THE PLUMBING FIXTURES, UNLESS <br />OTHERWISE SPECIFIED. <br />2.04 COUPLINGS <br />A. PIPES SHALL BE JOINED TO PLUMBING FIXTURES WITH SCREWED TAIL PIECE COUPLINGS AND UNIONS OR <br />OTHER OUTLET ASSEMBLIES SO THAT FIXTURES CAN BE EASILY REMOVED AND RESET. <br />2.05 FIXTURES (SEE SCHEDULE ON P-001) <br />2.06 SINKS <br />A. SINK - (PROVIDED BY MILLWORK CONTRACTOR): <br />1. 2 INCH STAINLESS STEEL WASTE OUTLETS WITH STRAINER WITH 1-1/2 INCH TAILPIECE. <br />2. 1-1/2 INCH CHROME PLATED P-TRAP WITH CLEANOUT. <br />PART 3 - EXECUTION <br />3.01 EXAMINATION <br />A. GENERAL: EXAMINE AREAS AND CONDITIONS UNDER WHICH WORK IS TO BE INSTALLED FOR COMPLIANCE WITH <br />REQUIREMENTS OF CONTRACT DOCUMENTS AND TO DETERMINE IF CONDITIONS AFFECTING PERFORMANCE OF <br />WORK ARE SATISFACTORY. DO NOT PROCEED WITH INSTALLATION UNTIL UNSATISFACTORY CONDITIONS HAVE <br />BEEN RESOLVED. COMMENCEMENT OF INSTALLATION SHALL CONSTITUTE ACCEPTANCE OF CONDITIONS. <br />3.02 INSTALLATION - PLUMBING FIXTURES <br />A. INSTALL PLUMBING FIXTURES OF TYPES INDICATED WHERE REQUIRED AND AT INDICATED HEIGHTS; IN <br />ACCORDANCE WITH WRITTEN INSTRUCTIONS AND ROUGHING -IN DRAWINGS OF MANUFACTURER, AND WITH <br />RECOGNIZED INDUSTRY PRACTICES. ENSURE PLUMBING FIXTURES COMPLY WITH REQUIREMENTS AND SERVE <br />INTENDED PURPOSES. COMPLY WITH APPLICABLE CODE REQUIREMENTS PERTAINING TO INSTALLATION OF <br />PLUMBING FIXTURES. <br />B. FASTEN PLUMBING FIXTURES SECURELY TO INDICATED SUPPORTS OR BUILDING STRUCTURE; AND ENSURE <br />THAT FIXTURES ARE LEVEL AND PLUMB. <br />3.03 CLEANING AND PROTECTION <br />A. UPON COMPLETION OF INSTALLATION OF PLUMBING FIXTURES AND AFTER UNITS ARE WATER PRESSURIZED, <br />TEST FIXTURES TO DEMONSTRATE CAPABILITY AND COMPLIANCE WITH REQUIREMENTS. WHEN POSSIBLE, <br />CORRECT MALFUNCTIONING UNITS AT THE SITE, THEN RETEST TO DEMONSTRATE COMPLIANCE; OTHERWISE, <br />REMOVE AND REPLACE WITH NEW UNITS AND PROCEED WITH RETESTING. <br />B. INSPECT EACH INSTALLED UNIT FOR DAMAGE TO FINISH. IF FEASIBLE, RESTORE AND MATCH FINISH TO <br />ORIGINAL AT SITE; OTHERWISE, REMOVE FIXTURE AND REPLACE WITH NEW UNIT. FEASIBILITY AND MATCH TO <br />BE JUDGED BY ARCHITECT. REMOVE CRACKED OR DENTED UNITS AND REPLACE WITH NEW UNITS. <br />C. TEST OPERATE INSTALLED WATER COOLERS TO DEMONSTRATE OPERATION. <br />END OF SECTION <br />PLUMBING EQUIPMENT <br />PART 1- GENERAL <br />1.01 SUMMARY <br />A. RELATED DOCUMENTS: PROVISIONS OF THE CONTRACT, INCLUDING CONDITIONS OF THE CONTRACT AND <br />DRAWINGS APPLY TO THIS SECTION. <br />B. DESCRIPTION: PLUMBING EQUIPMENT IS INDICATED BY CONTRACT DOCUMENTS AND SHALL INCLUDE WORK <br />NECESSARY AND INCIDENTAL TO COMPLETION AND PERFORMANCE OF THE WORK. <br />C. INCLUDED: PLUMBING EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO, FOLLOWING: <br />1. WATER HEATER. <br />2. HOT WATER RECIRCULATING PUMPS. <br />D. RELATED WORK: <br />1. UNDERGROUND PLUMBING. <br />2. ABOVEGROUND PLUMBING. <br />3. PLUMBING FIXTURES. <br />1.02 STANDARDS <br />A. AGA AND NSF LABELS: PROVIDE WATER HEATERS WHICH HAVE BEEN LISTED AND LABELED BY AMERICAN GAS <br />ASSOCIATION AND NATIONAL SANITATION FOUNDATION. <br />B. ANSI STANDARDS: COMPLY WITH ANSI Z223.1/ NFPA 54 - NATIONAL FUEL GAS CODE, AS APPLICABLE TO <br />INSTALLATION OF GAS -FIRED WATER HEATERS. <br />C. ASME CODE SYMBOL STAMPS: PROVIDE SAFETY RELIEF VALVES COMPLYING WITH ASME CODE, AND STAMPED <br />WITH APPROPRIATE CODE SYMBOLS. <br />D. ASME SAFETY VALVE STAMPS: PROVIDE SAFETY RELIEF VALVES BEARING ASME VALVE MARKINGS. <br />E. NEC STANDARDS: COMPLY WITH NATIONAL ELECTRICAL CODE (NFPA 70) AS APPLICABLE TO INSTALLATION AND <br />CONNECTION OF ELECTRIC WATER HEATERS. <br />F. UL LABELS: PROVIDE EQUIPMENT WHICH HAS BEEN LISTED BY UNDERWRITERS LABORATORIES. <br />1.03 QUALITY ASSURANCE <br />A. MANUFACTURER QUALIFICATIONS: MANUFACTURER SHALL HAVE 5 YEARS MINIMUM DOCUMENTED EXPERIENCE <br />IN DESIGN, PRODUCTION, FABRICATION AND INSTALLATION OF TYPE WORK REQUIRED FOR THE WORK. <br />B. INSTALLER QUALIFICATIONS: INSTALLER SHALL HAVE 5 YEARS MINIMUM DOCUMENTED EXPERIENCE IN DESIGN, <br />ENGINEERING, DETAILING, FABRICATION, INSTALLATION AND MAINTENANCE OF TYPE AND QUALITY REQUIRED <br />FOR WORK AND SHALL BE ACCEPTABLE TO MANUFACTURER. INSTALLER SHALL MAINTAIN AND HAVE <br />MAINTAINED A SERVICE CENTER WITH PARTS INVENTORY AND MANUFACTURER TRAINED PERSONNEL FOR 5 <br />YEARS MINIMUM. UPON REQUEST, PROVIDE PROOF OF QUALIFICATIONS. <br />1.04 SUBMITTALS <br />A. WATER HEATERS: <br />1. PRODUCT DATA: SUBMIT PRODUCT SPECIFICATIONS, TECHNICAL DATA AND INSTALLATION INSTRUCTIONS <br />OF MANUFACTURER FOR WATER HEATERS. INCLUDE PUBLISHED DATA, CERTIFIED CONFORMANCE REPORT <br />OR CERTIFIED LABORATORY TEST REPORT OF MANUFACTURER SUBSTANTIATING WATER HEATERS <br />MEETING REQUIREMENTS OF CONTRACT DOCUMENTS. <br />2. SHOP DRAWINGS: SUBMIT DIMENSIONED DRAWINGS OF WATER HEATERS, SHOWING ACCURATELY SCALED <br />PACKAGED UNITS AND COMPONENTS; INCLUDING LAYOUTS AND SPACE RELATIONSHIPS TO ASSOCIATED <br />PIPING AND EQUIPMENT. <br />1.05 PRODUCT HANDLING <br />A. DELIVER AND STORE EQUIPMENT IN FACTORY WRAPPED PACKAGES WHICH PROPERLY PROTECT EQUIPMENT <br />AGAINST WEATHER, DIRT, FUMES, CONSTRUCTION DEBRIS AND DAMAGE. <br />B. HANDLE EQUIPMENT CAREFULLY TO AVOID DAMAGE TO MOTORS, COMPONENTS, ENCLOSURES AND FINISH. DO <br />NOT INSTALL DAMAGED UNITS; REPLACE AND RETURN DAMAGED UNITS TO MANUFACTURER. <br />1.06 PROJECT CONDITIONS <br />A. PROTECTION: INSTALLER SHALL PROTECT PLUMBING EQUIPMENT DURING CONSTRUCTION PERIOD, TO AVOID <br />DAMAGE WITH MATERIALS AND DEBRIS AND TO PREVENT DAMAGE FROM TRAFFIC AND OTHER WORK. <br />MEP / FP Engineer <br />EPSTEIN <br />600 West Fulton <br />Chicago, IL 60661 <br />312.454.9100 <br />Design Architect <br />EPSTEIN <br />600 West Fulton <br />Chicago, IL 60661 <br />312.454.9100 <br />1.07 WARRANTY <br />A. GENERAL: WARRANTY WORK MEETING PROVISIONS OF CONDITIONS OF THE CONTRACT, EXCEPT WARRANTY <br />SHALL INCLUDE ADDITIONAL REQUIREMENTS SPECIFIED IN THE ARTICLE. <br />B. COVERAGE AND TIME PERIOD: <br />1. WATER HEATERS: SUBMIT WARRANTY SIGNED BY THE MANUFACTURER, COUNTERSIGNED BY THE <br />INSTALLER AND CONTRACTOR, AGREEING TO ADJUST OR REPLACE HEATERS, OR PORTIONS THEREOF, AS <br />REQUIRED TO ACHIEVE THE REQUIRED PERFORMANCES, EXTENDED TO A 3 YEAR PERIOD. <br />2. PUMPS: SUBMIT WARRANTY SIGNED BY THE MANUFACTURER, COUNTERSIGNED BY INSTALLER AND <br />CONTRACTOR, AGREEING TO ADJUST OR REPLACE PUMPS, OR PORTIONS THEREOF, AS REQUIRED TO <br />ACHIEVE THE REQUIRED PERFORMANCES, EXTENDED TO A 2 YEAR PERIOD. <br />PART 2-PRODUCTS <br />2.01 (SEE SCHEDULES ON P-001) <br />2.02 WATER HEATERS <br />A. UNIT SHALL BE OF SIZE AND CAPACITY AS INDICATED ON DRAWINGS. <br />B. UNITS SHALL MEET REQUIREMENTS OF ASHRAE 90 STANDARD. <br />C. RELIEF VALVE DISCHARGE AND DRAIN VALVE PIPING SHALL DISCHARGE THROUGH EXTERIOR WALL WITH <br />RODENT SCREEN. <br />D. ACCEPTABLE MANUFACTURERS: LOCHINVAR, A. 0. SMITH, PVI INDUSTRIES <br />2.02 PUMPS <br />A. RECIRCULATING PUMPS: <br />1. UNIT SHALL BE OF SIZE AND CAPACITY AS INDICATED ON DRAWINGS, AS MANUFACTURED BY BELL ADN <br />GOSSETT, TACO, OR GRUNDFOS AS ACCEPTABLE BY ARCHITECT. <br />2. PUMPS SHALL BE FOR VERTICAL OR HORIZONTAL INSTALLATION AND SHALL HAVE ALL BRONZE <br />CONSTRUCTION, MECHANICAL SEAL, BUILT-IN MOTOR OVERLOAD PROTECTION, OIL CIRCULATING <br />LUBRICATION SYSTEM AND DIRECT CONNECTED MOTOR. <br />3. PUMPS SHALL BE CONTROLLED BY STRAP -ON AQUASTAT. <br />2.03 EQUIPMENT AND PIPE SUPPORTS <br />A. PROVIDE UNISTRUT, PIPE OR STRUCTURAL STEEL SUPPORTS FOR ALL EQUIPMENT MOUNTED ABOVE FLOOR. <br />B. SUPPORTS SHALL BE DESIGNED WITH A MINIMUM FACTOR OF SAFETY OF 2 AND SHALL BE OF BOLTED OR <br />WELDED FABRICATION AS BEST SUITS REQUIREMENTS AND SHALL BE ADEQUATELY BRACED TO FORM A RIGID <br />STRUCTURE. <br />2.04 PRESSURE RELIEF VALVES <br />A. PROVIDE PRESSURE AND TEMPERATURE RELIEF VALVES ON TOP OF DOMESTIC HOT WATER HEATERS AND <br />STORAGE TANKS AS MANUFACTURED BY KNUKLE, MCDONNELL-MILLER OR WATTS. <br />B. PROVIDE ASME PRESSURE RELIEF. <br />C. PRESSURE RELIEF VALVES SHALL BE FACTORY SET TO RELIEVE AT OR BELOW MAXIMUM ALLOWABLE WORKING <br />PRESSURE OF TANK OR LOWEST WORKING COMPONENT OF SYSTEM. <br />D. DISCHARGE PIPE FROM RELIEF VALVES SHALL RUN FULL SIZE OF VALVE DOWN. NO THREADS ON OPEN END OF <br />DISCHARGE PIPE. <br />PART 3 - EXECUTION <br />3.01 EXAMINATION <br />A. GENERAL: EXAMINE AREAS AND CONDITIONS UNDER WHICH WORK IS TO BE INSTALLED FOR COMPLIANCE WITH <br />REQUIREMENTS OF CONTRACT DOCUMENTS AND TO DETERMINE IF CONDITIONS AFFECTING PERFORMANCE OF <br />WORK ARE SATISFACTORY. DO NOT PROCEED WITH INSTALLATION UNTIL UNSATISFACTORY CONDITIONS HAVE <br />BEEN RESOLVED. COMMENCEMENT OF INSTALLATION SHALL CONSTITUTE ACCEPTANCE OF CONDITIONS. <br />3.02 INSTALLATION -WATER HEATERS <br />A. INSTALL WATER HEATERS IN ACCORDANCE WITH INSTRUCTIONS OF MANUFACTURER AND WITH RECOGNIZED <br />INDUSTRY PRACTICES, TO ENSURE THAT WATER HEATERS COMPLY WITH REQUIREMENTS OF STATE AND LOCAL <br />CODES, AND APPLICABLE NFPA STANDARDS AND ASME - BOILER AND PRESSURE VESSEL CODE. <br />B. FLUSH WATER HEATERS UPON COMPLETION OF INSTALLATION IN ACCORDANCE WITH INSTRUCTIONS OF <br />MANUFACTURER. <br />C. START-UP WATER HEATERS IN ACCORDANCE WITH PROCEDURES OF MANUFACTURER, AND DEMONSTRATE <br />COMPLIANCE WITH REQUIREMENTS. <br />3.03 FIELD QUALITY CONTROL <br />A. WATER HEATERS: TEST ASSEMBLED WATER HEATERS AND ACCESSORIES, INCLUDING BUT NOT LIMITED TO <br />PROOF AND HYDROSTATIC TYPE TESTING, IN ACCORDANCE WITH APPLICABLE SECTIONS OF ASME - BOILER AND <br />PRESSURE VESSEL CODE. <br />B. PUMPS: UPON COMPLETION OF INSTALLATION OF PUMPS, AND AFTER MOTORS HAVE BEEN ENERGIZED WITH <br />NORMAL POWER SOURCE, BLEED AIR FROM PUMP CASINGS AND TEST PUMPS TO DEMONSTRATE COMPLIANCE <br />WITH REQUIREMENTS. WHEN POSSIBLE, FIELD CORRECT MALFUNCTIONING UNITS, THEN RETEST TO <br />DEMONSTRATE COMPLIANCE. REPLACE UNIT WHICH CANNOT BE SATISFACTORILY CORRECTED. <br />END OF SECTION <br />Nestle Waters North America <br />Nestle Waters North America <br />4330 20th Street <br />Zephyrhills, Florida 33542-6703 <br />972.462.3663 <br />estle <br />Waters <br />NORTH AMERtCA <br />V� r- (I _j <br />4 <br />09.18.2013 <br />ISSUE FOR PERMIT <br />3 <br />09.11.2013 <br />ISSUE FOR BIDS <br />2 <br />09-03.2013 <br />CD REVIEW PACKAGE <br />1 <br />08.16.2013 <br />DD REVIEW PACKAGE <br />NO. <br />DATE <br />REVISIONS/ISSUANCES <br />""IEPSTEIN <br />Architecture <br />Chicago <br />Interiors <br />New York <br />Engineering <br />Bucharest <br />Construction <br />Warsaw <br />600 W. Fulton Street <br />Chicago, IL 60661-1259 <br />T 312.454.9100 <br />www.epsteinglobal.com <br />PROJECT NUMBER: <br />12386 <br />PROJECT MANAGER: <br />JK <br />ARCH/ENG: <br />VD <br />SCALE: <br />NTS <br />DRAWN BY: <br />PV <br />CHECKED BY: <br />VD <br />PLUMBING <br />SPECIFICATIONS <br />P-005' <br />A. Epstein and Sons International, Inc. AA rights reserved. <br />Z -ti ,/!r <br />