GENERAL FIRE PROTECTION NOTES <br />1. THESE PLANS HAVE BEEN PREPARED TO PROVIDE GUIDANCE FOR BIDDING. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. THE FIRE PROTECTION CONTRACTOR <br />SHALL ADHERE TO THIS PERFORMANCE SPECIFICATION AND PROVIDE A SPRINKLER DESIGN TO MEET ALL INTENTS OF THIS SPECIFICATION. THE WORK THAT IS INDICATED IN THIS <br />DOCUMENT IS AN OVERVIEW OF THE PROJECT, INTENDED TO ESTABLISH THE SCOPE OF THE CONTRACTOR'S RESPONSIBILITIES. THE CONTRACTOR PRIOR TO BID SHALL CONSULT <br />THE LOCAL AUTHORITY HAVING JURISDICTION FOR ANY ADDITIONAL REQUIREMENTS. THE CONTRACTOR SHALL SUBMIT A COMPLETE SET OF WORKING DRAWINGS, EQUIPMENT, <br />SPECIFICATIONS AND HYDRAULIC CALCULATIONS TO THE OWNER'S REPRESENTATIVE AND THE AUTHORITY HAVING JURISDICTION (AHJ) FOR REVIEW AND APPROVAL PRIOR TO <br />FABRICATION AND INSTALLATION, WITH THEIR ENGINEER SEAL. THE CONTRACTOR SHALL BE THE ENGINEER OF RECORD AND SHALL VALIDATE COVERAGES WITH LOCAL CODE <br />AND OWNER'S INSURANCE UNDERWRITER. THE FIRE PROTECTION CONTRACTOR SHALL PROVIDE A COMPLETE AND FULLY OPERABLE SPRINKLER SYSTEM. <br />2. THE CONTRACTOR SHALL MAINTAIN AN APPROVED COMPLETE SET OF DRAWINGS AT THE JOB SITE FOR USE IN "AS -BUILT DRAWINGS." ANY REVISIONS SHALL BE NOTED THERIN AND <br />SUBMITTED TO THE OWNER'S REPRESENTATIVE AT THE COMPLETION OF THE JOB. THE CONTRACTOR SHALL USE THE "AS -BUILT DRAWINGS" TO PROVIDE A REPRODUCIBLE RECORD <br />SET OF THE COMPLETED SYSTEM AND SUBMIT THE RECORD SET TO THE OWNER'S REPRESENTATIVE. <br />3. ALL COMPONENTS OF THE FIRE PROTECTION STANDPIPE -SPRINKLER SYSTEM SHALL BE UL LISTED AND/OR FACTORY MUTUAL GLOBAL APPROVED, AND HAVE PRIOR APPROVAL OF <br />THE AUTHORITY HAVING JURISDICTION FOR USE IN FIRE SPRINKLER SYSTEMS. <br />4. THE SCOPE OF WORK INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING: <br />A. SITE VISIT TO EXAMINE THE EXISTING CONDITIONS THAT MAY EFFECT THE EFFICIENT AND TIMELY PERFORMANCE OF THE WORK INDICATED. EXISTING WAREHOUSE <br />PROTECTED BY A ESFR SYSTEM. EXISTING SYSTEMS TO BE MODIFIED/ADJUSTED AS NECESSARY FOR NEWSPACES. <br />B. HYDRAULIC DESIGN OF SPRINKLER SYSTEMS, INCLUDING COORDINATED SHOP DRAWINGS AND CALCULATIONS, SUBMITTALS FOR APPROVALS TO <br />ARCHITECT/ENGINEER, AHJ AND OWNER'S INSURANCE UNDERWRITER. CALCULATIONS SHALL BE BASED ON NFPA #13 AND #14 AND A FLOW TEST PER NFPA 291 LESS THAN (1) YEAR <br />OLD. CONDUCT SUCH A TEST IF RECORD DATA IS UNAVAILABLE OR OUT OF DATE. <br />C. PIPE SLEEVES SET IN COORDINATED LOCATIONS, THROUGH WALLS, FLOORS AND STRUCTURAL ELEMENTS, WITH CHROME PLATED OR PRIMED FINISHED STEEL ESCUTCHEON <br />PLATES FOR EXPOSED TO VIEW PIPES, PASSING THROUGH FINISHED WALLS, FLOORS AND CEILINGS. <br />D. ALL CUTTING, SEALING, PATCHING AND PAINTING REQUIRED FOR INSTALLATION OF THE SPRINKLER SYSTEM. ALL PENETRATIONS SHALL BE SEALED WITH NONCOMBUSTIBLE <br />MATERIALS FOR THOSE PENETRATIONS THAT ARE THROUGH FIRE RATED WALLS, A U.L. LISTED FIRE STOPPING MATERIAL SHALL BE USED TO MAINTAIN FIRE RESISTANCE RATING. <br />E. ALL REQUIRED ACCEPTANCE TESTING AND DOCUMENTATION TO THE SATISFACTION OF THE AHJ. <br />F. PROVIDE TEMPORARY FIRE PROTECTION AS REQUIRED BY THE AHJ, FOR ALL REQUIRED CONSTRUCTION OPERATIONS. <br />G. PROVIDE EQUIPMENT MANUALS, RECORD DRAWINGS, VALVE TAG SCHEDULES, TESTING CERTIFICATES AND PERSONNEL INSTRUCTION FOR EACH SYSTEM, PRIOR TO SYSTEM <br />TURN -OVER TO THE OWNER. <br />H. ALL WORK PERFORMED BY THIS CONTRACTOR SHALL BE GUARANTEED IN WRITING, FOR A PERIOD OF NOT LESS THAN ONE YEAR, FROM THE DATE OF FINAL ACCEPTANCE. <br />I, THE OWNER'S REPRESENTATIVE IS AUTHORIZED TO ORDER MINOR CHANGES DURING THE COURSE OF THE WORK WHICH WILL NOT INVOLVE EXTRA COST OR TIME AND <br />WHICH ARE CONSISTENT WITH THE CONTRACT DOCUMENTS. <br />J. FULLY COORDINATE LOCATIONS OF FIRE PROTECTION COMPONENTS INCLUDING PIPING, ALARMS, DRAINS, TEST POINTS, ETC., WITH ALL ARCHITECTURAL, STRUCTURAL, <br />MECHANICAL, AND ELECTRICAL COMPONENTS. OBSTRUCTIONS TO SPRINKLER DISCHARGE MUST BE CONSIDERED DURING SHOP DRAWING PRODUCTION AND INSTALLATION. <br />EXTRA SPRINKLERS MAY BE REQUIRED AT NO ADDITIONAL COST. REFER TO SPECIFICATION FOR ANY OTHER ADDITIONAL REQUIREMENTS. SUBMIT COPIES OF SHOP DRAWINGS <br />TO THE ARCHITECT OF RECORD FOR REVIEW PRIOR TO INSTALLATION. <br />5. DESIGN EACH SPRINKLER SYSTEM GIVING FULL CONSIDERATION TO THE HORIZONTAL AND VERTICAL OBSTRUCTIONS TO SPRINKLER SPRAY PATTERNS, PRESENTED BY ARCHITECTURAL <br />LAYOUTS OF ROOMS, DIFFERENT ADJACENT CEILING ELEVATIONS, BUILDING CONSTRUCTION, DUCTWORK AND MECHANICAL EQUIPMENT, SUSPENDED LIGHTS, ELECTRICAL EQUIPMENT <br />AND CONDUIT BANKS. COORDINATE THE LOCATION AND LAYOUT OF SPRINKLERS, PIPING AND EQUIPMENT WITH THE DETAILED INSTALLATION DRAWINGS OF ALL OTHER TRADES. <br />6. SUBMIT AN RFI (REQUEST FOR INFORMATION), FOR ALL QUESTIONS RELATED TO THE FIRE PROTECTION DOCUMENTS AND COORDINATION. <br />7. PENETRATIONS OF RATED WALLS OR ASSEMBLIES SHALL BE "FIRE CAULKED" WITH APPROVED CAULKING PER METHODS REQUIRED BY THE AUTHORITY HAVING JURISDICTION, (AHJ), AND <br />PROJECT SPECIFICATIONS. <br />8. SPRINKLER PROTECTION IS REQUIRED ABOVE ALL ELECTRICAL ROOMS. NO MAIN PIPING SHALL PENETRATE THE ELECTRICAL ROOMS. SPRINKLER BRANCHLINES SHALL NOT BE ROUTED <br />OVER PANEL BOARD LOCATIONS. <br />9. THE SPRINKLER CONTRACTOR MUST REVIEW ALL CONSTRUCTION DOCUMENTS PRIOR TO BID. SHOULD MODIFICATION TO THESE PLANS BECOME NECESSARY TO PROPERLY <br />COORDINATE THE SYSTEM WITH OTHER TRADES, IT WILL BE THE CONTRACTORS RESPONSIBILITY TO OBTAIN APPROVAL OF THESE CHANGES BY THE AHJ, AND THE FIRE PROTECTION <br />ENGINEER OF RECORD. IN ADDITION TO OBTAINING THE NECESSARY APPROVALS, THE SPRINKLER CONTRACTOR MUST MAKE NOTE OF ALL FIELD OR COORDINATE CHANGES ON THE <br />INSTALLATION DRAWINGS. ONCE COMPLETE, THE SPRINKLER CONTRACTOR SHALL SUPPLY ONE COPY OF AS -BUILT DRAWINGS TO NESTLE FOR THEIR <br />RECORDS/USE. <br />10. THE SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE TO DIVERT ALL DRAIN AND INSPECTORS TEST CONNECTION DISCHARGE AWAY FROM FINISHED SURFACES AND PIPE TO <br />APPROVED DRAIN LOCATIONS. THE SPRINKLER CONTRACTOR WILL BE BACKCHARGED FOR ANY REPAIR, REPLACEMENT, OR CLEANING OF RUST STAINS ON PAVEMENT/CONCRETE DUE <br />TO WATER DISCHARGE FROM SPRINKLER SYSTEM DRAIN DOWNS. <br />11. IN EVENT OF CONFLICT, AMBIGUITY OR INCONSISTENCY IN OR BETWEEN THE ELEMENTS COMPRISING THE CONTRACT DOCUMENTS, NOT CLARIFIED BY A MODIFICATION, THE <br />CONTRACTOR WILL BE DEEMED TO HAVE ESTIMATED ON, AND AGREED TO PROVIDE, THE GREATER QUANTITY OR BETTER QUALITY OF PRODUCTS AND THE WORK IN ACCORDANCE WITH <br />THE INTERPRETATION BY ARCHITECT OF WHICH CONFLICTING REQUIREMENT GOVERNS, UNLESS HE SHALL HAVE, BEFORE SUBMISSION OF HIS BID, ASKED FOR AND OBTAINED WRITTEN <br />DECISION OF THE ARCHITECT AS TO WHICH PRODUCTS AND WORK WILL BE REQUIRED. IF THE OWNER WITH CONSULTATION OF THE ARCHITECT DECIDES TO ACCEPT A LESSER <br />QUANTITY OR LOWER QUALITY OF PRODUCTS AND WORK, THE CONTRACTOR SHALL REMIT TO THE OWNER THE DIFFERENCE BETWEEN THE COST OF THE WORK THAT THE OWNER <br />ACCEPTS AND THE COST OF THE GREATER QUANTITY OR BETTER QUALITY OF PRODUCTS AND WORK. <br />12. HEADS IN FINISHED SPACES SHALL BE FULLY RECESSED WITH WHITE COVERS. <br />MEP / FP Engineer <br />EPSTEIN <br />600 West Fulton <br />Chicago, IL 60661 <br />312.454.9100 <br />Design Architect <br />EPSTEIN <br />600 West Fulton <br />Chicago, IL 60661 <br />312.454.9100 <br />Nestle Waters North America <br />Nestle Waters North America <br />4330 20th Street <br />Zephyrhills, Florida 33542-6703 <br />972.462.3663 <br />11 <br />I�tle� <br />waters <br />i <br />NORTH AMERICA <br />••'gyp`':..-:: ?�i;"ep <br />STATE OF :4v <br />A e <br />Qc. <br />MAL <br />4 <br />3 <br />2 <br />09.18.2013 <br />09.11.2013 <br />09.03.2013 <br />ISSUE FOR PERMIT <br />ISSUE FOR BIDS <br />CD REVIEW PACKAGE <br />1 <br />NO. <br />08.16.2013 <br />DATE <br />DD REVIEW PACKAGE <br />REVISIONS/ISSUANCES <br />PSTEIN <br />Architecture <br />Chicago <br />Interiors <br />New York <br />Engineering <br />Bucharest <br />Construction <br />Warsaw <br />600 W. Fulton Street <br />Chicago, IL 60661-1259 <br />T 312.454.9100 <br />www.epsteinglobal.com <br />PROJECT NUMBER: 12386 <br />PROJECT MANAGER: JK <br />ARCH/ENG: PV <br />SCALE: NTS <br />DRAWN BY: PV <br />CHECKED BY: VD <br />FIRE PROTECTION <br />NOTES <br />FP=001 <br />�" - UX)= A. Epstein and Sons International, Inc. AA rights reserved, <br />