It
<br />PLUMBING SPECIFICATIONS
<br />SCOPE: THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS BEFORE SUBMITTING A PROPOSAL. ALL WORK SHALL BE IN ACCORDANCE
<br />WITH THE FLORIDA BUILDING CODES SEVENTH EDITION (2020), WITH AMENDMENTS, AND LOCAL CODES AND ORDINANCES. INSTALLATION SHALL COMPLY WITH THE CODE
<br />REFERENCED STANDARDS SET BY NFPA, ASHRAE, ASPE, SMACNA, NEC AND UL. THE SYSTEMS, EQUIPMENT, DEVICES AND ACCESSORIES SHALL BE INSTALLED, FINISHED,
<br />TESTED AND ADJUSTED FOR CONTINUOUS AND PROPER OPERATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIS WORK FITTING IN PLACE AND SHALL COORDINATE
<br />WITH OTHER TRADES TO AVOID INTERFERENCE WITH THEIR WORK. THE INFORMATION GIVEN HEREIN AND ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED, BUT ITS
<br />EXTREME ACCURACY IS NOT GUARANTEED. THE DRAWINGS ARE DIAGRAMMATIC, INTENDED TO SHOW GENERAL ARRANGEMENT, CAPACITY AND LOCATION OF VARIOUS
<br />COMPONENTS, EQUIPMENTS, AND DEVICES. IF WORK IS REQUIRED IN A MANNER TO MAKE IT IMPOSSIBLE TO PRODUCE FIRST CLASS WORK, OR SHOULD DISCREPANCIES
<br />APPEAR AMOUNG THE CONTRACT DOCUMENTS, OR BETWEEN THE CONTRACT DOCUMENTS AND THE MANUFACTURER'S RECOMMENDATIONS,THE CONTRACTOR SHALL REQUEST
<br />INTERPRETATION BEFORE PROCEDING WITH WORK. CONTRACTOR SHALL FURNISH AND INSTALL ALL MINOR ITEMS WHICH ARE OBVIOUSLY AND REASONABLY NECESSARY TO
<br />COMPLETE THE INSTALLATION WHETHER OR NOT SPECIFIED IN THE DOCUMENTS.
<br />REQUIRED COORDINATION: ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS AND PIPING (INCLUDING DIVIDED DUCTS) AND TRANSITIONS
<br />AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
<br />CONSTRUCTION PLANS: IN GENERAL, PLANS AND DIAGRAMS ARE SCHEMATIC ONLY AND SHOULD NOT BE SCALED.
<br />REQUIRED ACCESS: CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT AND DEVICES THAT REQUIRE REPLACEMENT, SERVICING, ADJUSTING OR MAINTENANCE SHALL BE
<br />LOCATED TO ALLOW EASY ACCESS AND SPACE FOR REMOVAL OF INTERNAL ASSMBLIES, IF REQUIRED. CONTRACTOR SHALL PROVIDE ACCESS PANELS WHERE REQUIRED TO
<br />ALLOW ACCESS, EVEN IF NOT INDICATED ON THE DRAWINGS AT NO ADDITIONAL COST TO OWNER.
<br />WIND RESISTANCE: ALL EQUIPMENT, APPLIANCE AND SUPPORTS LOCATED EXTERIOR OF THE FACILITY SHALL BE INSTALLED TO RESIST WIND LOADS AS DETAILED IN THE
<br />BUILDING CODE.
<br />CUTTING AND PATCHING: ALL OPENINGS AROUND DUCT OR PIPE PENETRATIONS THROUGH SMOKE OR FIRE RATED FLOORS, CEILINGS OR WALLS SHALL BE SEALED AIRTIGHT
<br />WITH MATERIALS HAVING A RATING EQUAL TO THE MATERIAL OF THE WALL, CEILING OR FLOOR PENETRATED.
<br />ALL EQUIPMENT WILL HAVE A PERMANENTLY FIXED TAG CORRESPONDING TO THE EQUIPMENT TAG ON THE ENGINEER'S DRAWINGS.
<br />FIRESTOPPING: UL APPROVED MATERIALS AND METHODS SHALL PROTECT THE PENETRATIONS OF FIRE AND/OR SMOKE RATED WALLS, CEILINGS OR FLOORS. THE RATING OF
<br />THE FIRESTOPPING SHALL EQUAL THE RATING OF THE RATED ASSEMBLY. ALL INSULATION SHALL HAVE COMPOSITE FIRE AND SMOKE HAZARD RATINGS AS TESTED BY
<br />PROCEDURE ASTM E-84, NFPA-225, UL-723 NOT EXCEEDING:
<br />FLAME SPREAD 25
<br />SMOKE DEVELOPED 50
<br />FUEL DISTRIBUTED 50
<br />ACCESSORIES SUCH AS ADHESIVE, MASTIC, CEMENTS AND TAPES SHALL HAVE THE SAME COMPONENT RATING AS LISTED ABOVE.
<br />SERVICE AND PERMITS: CONTRACTOR SHALL MAKE ALL ARRANGEMENTS WITH UTILITY COMPANIES FOR SERVICE AND CONNECTIONS AND SHALL PAY FOR PERMITS.
<br />SHOP DRAWINGS: EACH TRADE SHALL PREPARE AND SUBMIT SHOP DRAWINGS IN ACCORDANCE WITH PROCEDURES OUTLINED IN DIVISION 1. RESPONSIBILITY FOR ERRORS
<br />OR OMISSIONS IN THE SUBMITTALS SHALL NOT BE RELIEVED BY THE ARCHITECT'S OR ENGINEER'S REVIEW. ENGINEER'S PROCESSING WILL NOT CONSTITUTE A COMPLETE
<br />CHECK BUT WILL INDICATE ONLY THAT A GENERAL METHOD OF CONSTRUCTION AND DETAILING IS SATISFACTORY. AT A MINIMUM SUBMITTALS SHALL INCLUDE FIXTURES,
<br />VALVES, PIPING, INSULATION AND ACCESSORIES.
<br />START-UP: CONTRACTOR SHALL STARTUP ALL EQUIPMENT AND FOLLOW THE MANUFACTURER'S START-UP PROCEDURES.
<br />OPERATING AND MAINTENANCE DATA: SUBMIT THREE COPIES OF MANUFACTURER'S OPERATING AND MAINTENANCE INSTRUCTIONS AND SPARE PARTS LIST FOR EACH PIECE OF
<br />EQUIPMENT.
<br />SUPPLEMENTARY SUPPORTS: CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL EQUIPMENT AND MATERIALS, IN ORDER TO
<br />PROVIDE A "VIBRATION -FREE" RIGID INSTALLATION.
<br />DIELECTRIC UNIONS: PROVIDE DIELECTRIC UNIONS OR FLANGES AT CONNECTIONS OR CONTACT BETWEEN PIPES OF DISSIMILAR METALS.
<br />WATER PIPING: WATER PIPING SHALL BE CPVC TUBING. TUBING, FITTINGS AND CEMENT SHALL MEET ASTM D-2846, 100 PSI ® 1807 CONTINUOUS RATING. CPVC TUBING
<br />AND FITTINGS SHALL MEET 25/50 FLAME SPREAD/SMOKE DEVELOPED REQUIREMENTS FOR PLENUMS. CONTRACTOR SHALL INSTALL CPVC IN ACCORDANCE WITH
<br />MANUFACTURER'S INSTRUCTIONS. CONTRACTOR SHALL PROVIDE FOR EXPANSION AND CONTRACTION OF TUBING. TUBING SHALL BE SLEEVED AT PENETRATION OF CONCRETE
<br />SLABS OR WALLS. CPVC TUBING SHALL BE BFGOODRICH FLOWGUARD GOLD OR APPROVED EQUAL. INSTALL PIPE SUPPORTS AT 3-FOOT INTERVALS FOR SIZES 1" OR
<br />SMALLER; INSTALL PIPE SUPPORTS AT 4-FOOT INTERVALS FOR 1-1/4" AND LARGER.
<br />WATER HAMMER ARRESTORS: INSTALL WATER HAMMER ARRESTERS AT EACH HOT AND COLD FIXTURE SUPPLY.
<br />EXPOSED PIPING: EXPOSED PIPING SHALL BE POLISHED CHROMIUM ON EITHER BRASS OR BRONZE. PROVIDE ADA INSULATED WATER AND WASTE LINE COVERINGS FOR WALL
<br />HUNG SINKS AND LAVATORIES.
<br />VALVES: ALL VALVES SHALL HAVE A MINIMUM OF 125 PSIG WORKING PRESSURE. VALVES AND COCKS MAY NOT BE INDICATED IN EVERY INSTANCE ON THE DRAWINGS, BUT
<br />WHETHER OR NOT SHOWN, ALL VALVES, COCKS AND CHECK VALVES NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM SHALL BE FURNISHED AND INSTALLED.
<br />INSTALL ISOLATION/SHUT-OFF VALVES AT ALL MAIN RISERS, AND MAIN BRANCH TAKEOFFS. INSTALL ISOLATION/SHUT-OFF VALVES ON EACH INLET AND OUTLET OF EACH
<br />PIECE OF EQUIPMENT. PROVIDE A FLANGE OR UNION BETWEEN THE VALVE AND THE EQUIPMENT TO PERMIT DISCONNECTION, REMOVAL AND SERVICE.
<br />STERILIZATION OF DOMESTIC WATER SYSTEM: THE ENTIRE DOMESTIC WATER DISTRIBUTION SYSTEM SHALL BE THOROUGHLY STERILIZED AS REQUIRED BY THE HEALTH
<br />AUTHORITY OR WATER PURVEYOR HAVING JURISDICTION, OR IN THE ABSENCE OF A PRESCRIBED METHOD, THE PROCEDURE DESCRIBED IN EITHER AWWA C651 OR AWWA C652,
<br />OR AS DESCRIBED IN SECTION 610 FBC-P.
<br />NATURAL GAS SYSTEM: A SERVICE LINE, METER AND PRESSURE REDUCING VALVE HAS BEEN FURNISHED BY THE LOCAL GAS UTILITY COMPANY. THE COMPLETE GAS PIPING
<br />SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH SEVENTH EDITION FBC (2020) - FUEL GAS CODE. ABOVE GROUND GAS TO BE SCHEDULE 40 BLACK STEEL PIPING,
<br />ASTM A53. BELOW GROUND TO BE POLYETHYLENE GAS PIPING WITH CODE REQUIRED TRACER WIRE (FBC-FG, SECTION 404.17.3), ASTM D 2513. GAS PIPING INSTALLED
<br />UNDER SLAB SHALL BE RUN IN STEEL CONDUIT AND SEALED IN ACCORDANCE WITH FBC-FG, SECTION 404.14. PROVIDE UNION AND GAS SHUT-OFF VALVE TO EACH PIECE
<br />OF GAS FIRED EQUIPMENT OR APPLIANCE. PIPE INSTALLATION MUST BE TESTED IN ACCORDANCE WITH FCB-FC, SECTION 406.
<br />VENTING: THE STACKS SHALL BE EXTENDED THROUGH ROOF OF BUILDING TO POINTS NOT LESS THAN 12" ABOVE ROOF. VENTS SHALL BE OFFSET AS REQUIRED TO
<br />PENETRATE ROOFS AT LEAST 3 FEET FROM THE RIDGE OR EDGE OF BUILDING AND 10 FEET FROM ANY FRESH AIR INTAKE OR OPERABLE WINDOW OR DOOR,
<br />SANITARY, WASTE. AND VENT PIPING: ALL BURIED AND UNBURIED PIPING AND FITTINGS SHALL BE SCHEDULE 40 PVC-DWV. (SOLID CORE) SLOPE OF SANITARY OR
<br />DRAINAGE PIPING 2-1 /2" AND SMALLER SHALL BE A MINIMUM OF 1 /4" PER FOOT; PIPING 3" AND LARGER SHALL BE SLOPED A MINIMUM OF 1 /8" PER FOOT. CLEANOUTS
<br />WILL BE LOCATED NOT MORE THAN 100 FEET APART AND AT EACH CHANGE OF DIRECTION GREATER THAN 45' ALONG THE HORIZONTAL DRAIN. CLEANOUTS SHALL BE
<br />INSTALLED AT BASE OF EACH STACK. CONCEALED CLEANOUTS SHALL HAVE CAST BRASS CHROMIUM PLATED FLAT ACCESS COVER PLATE.
<br />FLOOR DRAINS/SINKS: FLOOR DRAINS SHALL BE CAST IRON AND ADJUSTABLE TO ACCOMMODATE THE FINISHED FLOOR. FLOOR SINKS SHALL HAVE AN ACID -RESISTANT
<br />ENAMELED INTERIOR. STRAINERS SHALL BE PROVIDED WITH BARRIER -TYPE TRAP SEAL PROTECTION (ASSE 1072) AND FLASHING FLANGE OR CLAMP, UNLESS OTHERWISE
<br />INDICATED.
<br />PLUMBING FIXTURES AND TRIM: PLUMBING FIXTURES SHALL BE FURNISHED AND INSTALLED IN A NEAT AND WORKMANLIKE MANNER WITH PROPER CONNECTIONS TO SUPPLY
<br />AND DRAINAGE PIPING. ALL FIXTURES SHALL BE FREE OF FLAWS AND DEFECTS OF ANY SORT IN MATERIAL AND WORKMANSHIP AND SHALL OPERATE PERFECTLY WHEN
<br />INSTALLED IN ACCORDANCE WITH MANUFACTURER'S DIRECTIONS. CONTRACTOR SHALL PROVIDE ROUGH -IN, AND SHALL CONNECT ALL FIXTURES TO THE PLUMBING SYSTEMS.
<br />ALL FIXTURES TO BE PROVIDED WITH CHROME -PLATED SUPPLIES AND STOPS. PROVIDE 17 GAUGE CHROME -PLATED BRASS TRAPS FOR ALL FIXTURES WITHOUT INTEGRAL
<br />TRAPS. PROVIDE CONCEALED ARM CARRIERS AND SUPPORTS FOR ALL FIXTURES REQUIRING SAME.
<br />PIPE INSULATION: INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. SEAL
<br />ALL JOINTS, BREAKS, TEARS AND PENETRATIONS WITH FIRE RETARDENT, VAPOR BARRIER MASTIC. COVER VALVES, FITTINGS AND SIMILAR ITEMS IN EACH PIPING SYSTEMS.
<br />INSULATE ALL DOMESTIC HOT WATER PIPE WITH 1" THICK FIBERGLASS SECTIONAL PIPE COVERING WITH CANVAS JACKET OR ARMAFLEX AP (ASTM E-84).
<br />TESTING: TEST ALL WASTE AND VENT PIPING FOR A PERIOD OF NOT LESS THAN 8 HOURS BY CAPPING OR PLUGGING. ALL JOINTS TO A LEVEL OF THE HIGHEST FIXTURE OR
<br />FITTINGS. FILLING THE SYSTEM WITH WATER, AND OBSERVING FOR LEAKS. TEST WATER PIPING AT 100 PSIG FOR A PERIOD OF 8 HOURS, OBSERVING FOR ANY VISIBLE
<br />LEAKS. TEST PIPING AGAIN WITH FIXTURES INSTALLED. REPAIR ANY LEAKS FOUND BY REMAKING JOINT. DO NOT USE CAULKING OR SIMILAR METHODS TO CORRECT LEAKS.
<br />UPON REPAIRING ANY LEAKS FOUND. AGAIN TEST THAT PORTION OF THE SYSTEM AS DESCRIBED ABOVE.
<br />EQUIPMENT FURNISHED BY OTHERS: WHERE SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL MAKE ALL PIPING CONNECTIONS TO EQUIPMENT FURNISHED BY OTHERS.
<br />THIS WORK SHALL INCLUDE FURNISHING AND INSTALLATION OF ALL WATER AND DRAIN PIPING. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH RECOMMENDATIONS
<br />OF EQUIPMENT MANUFACTURER.
<br />GUARANTEE: THE ONE-YEAR GUARANTEE PERIOD SHALL NOT START UNTIL THE PROJECT IS FULLY COMPLETED AND THE CONTRACTOR HAS RECEIVED THE FINAL PAYMENT
<br />AND CERTIFICATION OF COMPLETION. ALL EQUIPMENT AND ALL WORK SHALL BE FULLY GUARANTEED, PARTS AND LABOR, FOR ONE YEAR FROM THE DATE OF THE
<br />CERTIFICATE OF COMPLETION. REPAIRS MADE DURING THIS PEROID MUST BE FULLY GUARANTEED FOR AN ADDITIONAL ONE YEAR PERIOD FROM THE DATE OF REPAIRS. IN
<br />ADDITION, THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY DAMAGE TO THE BUILDING, AND ITS CONTENTS OR OTHER EQUIPMENT, CAUSED BY DEFECTS OR
<br />IMPROPER INSTALLATION OF EQUIPMENT OR MATERIAL INSTALLED.
<br />SUBSTITUTIONS: CONTRACTOR 'SHALL PAY FOR ANY AND ALL ADDED COSTS ASSOCIATED WITH ANY SUBSTITUTION, INCLUDING SUBSTITUTIONS THAT REQUIRE CHANGES TO THE
<br />OTHER BUILDING COMPONENTS, SUCH AS ELECTRICAL, STRUCTURAL REINFORCING, CEILINGS, WALLS, ROOFS, ETC. THIS WILL INCLUDE ANY ENGINEERING/ARCHITECTURAL
<br />RE -DESIGN COSTS AS A RESULT OF SAID SUBSTITUTION. THESE COSTS SHALL NOT BE BORNE BY THE OWNER, ARCHITECT, NOR ENGINEER, REGARDLESS OF ACCEPTABILITY
<br />OF SUBSTITUTION. ENGINEER RESERVES THE RIGHT TO ACCEPT OR DENY ANY SUBSTITUTION THAT HE DOES NOT DEEM TO BE EQUIVALENT, AND CONTRACTOR SHALL
<br />PROVIDE SPECIFIED OR EQUIVALENT MATERIALS/EQUIPMENT AT NO ADDITIONAL COST TO OWNER, SHOULD A SUBSTITUTION BE DENIED.
<br />PLUMBING LEGEND
<br />DESCRIPTION
<br />ABBREV.
<br />SYMBOL
<br />SANITARY PIPING
<br />SAN
<br />GREASE PIPING
<br />GR
<br />GR
<br />VENT PIPING
<br />V
<br />DOMESTIC COLD WATER
<br />CW
<br />---------
<br />DOMESTIC HOT WATER
<br />HW
<br />----------
<br />GAS PIPING
<br />GAS
<br />--w---�—�-
<br />BALL/ISOLATION VALVE
<br />BV
<br />-----lei---
<br />DUAL-CHECK BACKFLOW
<br />PREVENTER
<br />GRADE CLEAN OUT
<br />COTG
<br />COTG
<br />WALL CLEAN OUT
<br />WCO
<br />WCO I
<br />FLOOR CLEAN OUT
<br />FCO
<br />FCO
<br />PIPE TURNING UP
<br />0-------
<br />PIPE TURNING DOWN
<br />------
<br />CAPPED PIPING
<br />TYPICALITEM
<br />TYP
<br />CONNECTION BETWEEN
<br />NEW & EXISTING
<br />EXISTING
<br />(E)
<br />NEW
<br />(N)
<br />BALANCE VALVE
<br />BV
<br />NOTE ON EXISTING UTILITIES:
<br />CONTRACTOR SHALL FIELD VERIFY LOCATIONS & INVERTS
<br />OF ALL EXISTING UTILITY MAINS INSIDE BUILDING (I.E.
<br />SEWER, GAS, DOMESTIC WATER, ETC.) PRIOR TO ANY
<br />DEMOLITION OR CONSTRUCTION. ADVISE ENGINEER OF
<br />ANY DISCREPANCIES BEFORE PROCEEDING ANY FURTHER.
<br />** CCTV VIDEO CAMERA INVESTIGATION REQUIRED BY PLUMBER
<br />(PRIOR TO ANY WORK) TO VERIFY INVERT ADEQUATE AT MOST
<br />REMOTE AREA OF NEW SANITARY UNDERGROUND CONNECTION.
<br />NOTIFY ENGINEER OF RESULTS OF CAMERA WORK.
<br />NOTE TO CONTRACTOR
<br />ON EXISTING CONDITIONS:
<br />1 CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID AND
<br />SURVEY ALL EXISTING CONDITIONS AND EQUIPMENT
<br />PRIOR TO SUBMITTING BID FOR WORK REQUIRED BY
<br />THESE DOCUMENTS. THIS INCLUDES ABOVE THE
<br />CEILING AND ON TOP OF THE ROOF.
<br />2. CONTRACTOR SHALL REFER TO AND READ THROUGH
<br />ALL OF THE "CONTRACTOR'S SCOPE OF WORK" AS
<br />DEFINED IN THE BID SPECIFICATIONS AND DOCUMENTS
<br />AS PART OF THE BID PROCESS.
<br />3. IF AT ANY TIME, THERE IS DISCREPANCY BETWEEN THE
<br />PLANS & SPECS. OR CONFUSION/CONCERN OVER
<br />REQUIRED WORK, CONTRACTOR SHALL IMMEDIATELY
<br />NOTIFY ARCHITECT. ENGINEER, &/OR OWNER AND GET
<br />DIRECTION BEFORE PROCEEDING WITH WORK IN
<br />I#l1j*v `•l.e
<br />4. FOR ALL NEW ROOF PENETRATIONS, CONTRACTOR
<br />SHALL INCLUDE IN HIS BID THE COST TO HIRE THE
<br />ROOFING FIRM HOLDING THE WARRANTY TO PROVIDE
<br />ROOF PENETRATIONS.
<br />5. FOR ALL EXISTING EQUIPMENT TO BE RE -LOCATED
<br />&/OR RE -USED, CONTRACTOR SHALL BE RESPONSIBLE
<br />FOR DISCONNECTION, SAFE STORAGE, &
<br />RE -CONNECTION OF SAID EQUIPMENT COMPLETELY.
<br />6. FOR ALL EXISTING EQUIPMENT TO BE DEMOLISHED (I.E.
<br />DEMO) CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />DISCONNECTION, REMOVAL, & DISPOSAL OFF -SITE PER
<br />CODE, OF SAID EQUIPMENT COMPLETELY.
<br />CIYIIII
<br />/� M 0)
<br />V 0 � � ao
<br />I
<br />0
<br />F_ t N
<br />Q V) U
<br />O 3 M
<br />w
<br />Y V) Yd
<br />o
<br />V) J
<br />W i�
<br />Z< Wa�� M
<br />aVi
<br />CL Q W U M
<br />/uj w Z � J � y J
<br />w
<br />Q
<br />u-
<br />�9
<br />a�
<br />o
<br />L
<br />r j
<br />A
<br />a a
<br />a R
<br />>>
<br />R
<br />E
<br />Vl
<br />4 r y
<br />+'
<br />O
<br />N O
<br />O
<br />(4--
<br />0z
<br />(�
<br />Q
<br />tl)
<br />z
<br />W
<br /><
<br />a
<br />(a
<br />a
<br />(.)
<br />o
<br />O
<br />v
<br />Q
<br /><
<br />to
<br />O
<br />�
<br />Z
<br />-p
<br />Lo
<br />(�
<br />a_
<br />LIA
<br />N
<br />e�
<br />�
<br />W
<br />ti
<br />O
<br />q r~
<br />Al
<br />Nu 56189
<br />°. MATE OF
<br />s'
<br />TONAL
<br />Date: 4. 25.22
<br />Checked by: mil
<br />Drawn: TJ/KB
<br />.lob: 21-042
<br />Sheet
<br />POO 1
<br />
|