Laserfiche WebLink
ROOF PLAN <br />3/16"=1'-0" <br />GENERAL SHEET NOTES <br />1. NOT ALL ITEMS MAY BE USED. <br />2. DIMENSIONS ARE TAKEN TO FACE OF STUD, FACE OF MASONRY OR <br />CONCRETE , CENTERLINE OF EQUIPMENT/SKYLIGHT, OR COLUMN <br />CENTERLINE, UNLESS INDICATED OTHERWISE. <br />3. ALL HEIGHTS SHOWN ARE FROM FIRST FLOOR FINISH SLAB. <br />4. PRIOR TO ROUGH —IN AND ROOF ENCLOSURE, COORDINATE ALL WORK <br />WITH TENANT/OWNER VENDOR REQUIREMENTS. <br />5. PRIOR TO ROUGH —IN AND ROOF ENCLOSURE, COORDINATE LOCATION OF <br />ALL ROOF MOUNTED EQUIPMENT AND DEVICES. THIS SHALL INCLUDE, <br />BUT NOT BE LIMITED TO: ALL CONTRACTOR, TENANT/OWNER, AND <br />TENANT/OWNER VENDOR SUPPLIED ITEMS. <br />6. PRIOR TO ROOF ENCLOSURE, CONTRACTOR SHALL PROVIDE ALL BLOCKING <br />AND/OR SUPPORT AS REQUIRED FOR ROOF MOUNTED ITEMS. THIS SHALL <br />INCLUDE, BUT NOT BE LIMITED TO: ALL CONTRACTOR, TENANT/OWNER, <br />AND TENANT/OWNER VENDOR SUPPLIED ITEMS. <br />6.1. COORDINATE FINAL LOCATIONS OF OWNER AND THIRD PARTY VENDOR <br />FURNISHED ITEMS IN THE FIELD WITH TENANT/OWNER REP AND THE <br />VENDOR. <br />6.2. UNLESS INDICATED OTHERWISE, ALL BLOCKING SHALL BE ENCLOSED <br />INSIDE FINISH CONSTRUCTION. PROVIDE FIRE RETARDANT TREATED <br />WOOD BLOCKING. <br />7. SEE ELECTRICAL DRAWINGS FOR ALL ELECTRICAL AND LIGHT FIXTURE <br />TYPES AND MODELS. <br />8. SEE MECHANICAL DRAWINGS FOR ALL MECHANICAL EQUIPMENT. <br />9. ALL ROOF EQUIPMENT AND PENETRATIONS SHALL BE PROVIDED WITH <br />STRUCTURAL SUPPORT, SEE STRUCTURAL DRAWINGS FOR FRAMING <br />INFORMATION AND LOCATIONS. <br />9.1. VERIFY LOCATIONS OF ALL VENTS AND ROOF PENETRATIONS WITH <br />ALL DISCIPLINES. <br />9.2. VERIFY LOCATIONS OF ALL MECHANICAL EQUIPMENT WITH <br />STRUCTURAL DRAWINGS. <br />9.3. NO EQUIPMENT SHALL BE LOCATED WITHIN 10'-0" OF THE EDGE OF <br />THE ROOF. THIS INCLUDES, BUT IS NOT LIMITED TO, RTUs, <br />EXHAUST FANS, CONDENSING UNITS, AND VENTS. <br />9.4. THE MECHANICAL CONTRACTOR SHALL COORDINATE INSTALLATION AND <br />ACCEPTANCE OF PREFABRICATED CURBS AND PENETRATIONS WITH <br />THE ROOFING CONTRACTOR AND THE G.C. IN ORDER TO PROVIDE <br />ALL NECESSARY BLOCKING, NAILING, FLASHING, ETC. AS REQUIRED <br />FOR A WATER —TIGHT INSTALLATION. <br />9.5. ALL ROOF EQUIPMENT SHALL BE MOUNTED ON ELEVATED, INSULATED <br />PREFABRICATED CURBS. WHERE EQUIPMENT SITS ON A SLOPED <br />SURFACE, PROVIDE A CURB MATCHED TO THE SLOPED SURFACE. <br />ALL EQUIPMENT SHALL SIT LEVEL. MAINTAIN 8" MIN. FROM TOP OF <br />FINISH ROOF TO TOP OF CURB. ALL CURBS SHALL BE SET LEVEL, <br />PROVIDE FACTORY FABRICATED CURBS WITH SLOPED BOTTOMS <br />MATCHING THE ROOF SLOPE. ALL CURBS SHALL BE INSTALLED AND <br />FLASHED PER THE MANUFACTURER'S RECOMMENDATIONS. <br />10. ROOFING REQUIREMENTS: <br />10.1. THE CONTRACTOR, AND ANY ROOFING SUBCONTRACTOR WORKING <br />UNDER THE CONTRACTOR, SHALL BE RESPONSIBLE FOR PROVIDING A <br />COMPLETE WARRANTED, WATER —TIGHT ROOFING SYSTEM. THIS SHALL <br />INCLUDE, BUT NOT BE LIMITED TO, SEPARATION BOARDS, VAPOR <br />BARRIERS, NAILERS AND BLOCKING, ROOF INSULATION, TAPERED <br />OVERBUILD INSULATION, TAPERED OVERBUILD CRICKETS, ROOF <br />MEMBRANE, WALL FLASHING, TERMINATIONS AND FLASHING, ETC. AS <br />REQUIRED FOR PROVIDING A COMPLETE WARRANTED, WATER —TIGHT <br />ROOFING SYSTEM. COMPLY WITH MANUFACTURER'S AND NRCA'S <br />REQUIREMENTS. COORDINATE THESE DETAILS WITH THE ROOFING <br />SYSTEM PROVIDED AND FIELD CONDITIONS. <br />10.2. ALL ROOFING SLOPES SHALL HAVE A MINIMUM 1/4" PER FOOT <br />SLOPE. ALL TAPERED OVERBUILD INSULATION AND TAPERED <br />OVERBUILD CRICKETS SHALL HAVE THE SAME MINIMUM SLOPE. <br />WHERE VALLEYS OCCUR IN CRICKETS AND TAPERED INSULATION, THE <br />TAPERED INSULATION SHALL BE PROVIDED IN SUFFICIENT DEPTH AND <br />SLOPE TO ENSURE A MINIMUM 1/4" PER FOOT SLOPE IN THE <br />VALLEY TO THE ROOF DRAIN; ALL AREAS SHALL BE PROVIDED WITH <br />POSITIVE DRAINAGE. THE CONTRACTOR SHALL NOTIFY THE <br />ARCHITECT OF ANY DISCREPANCIES PRIOR TO BID. NO CHANGE <br />ORDERS SHALL BE ACCEPTED FOR ADDITIONAL ROOFING MATERIAL <br />REQUIRED TO CREATE THE SLOPES. <br />10.3. PROVIDE ROOF INSULATION IN THE THICKNESS REQUIRED TO MEET <br />THE MINIMUM R VALUE INDICATED. WHERE INDICATED R VALUE DOES <br />NOT COINCIDE WITH THE MANUFACTURER'S STANDARD INSULATION <br />THICKNESS, ROUND UP TO THE NEXT EVEN NUMBER. ALL CRICKETS <br />AND TAPERED INSULATION SHALL BE INSTALLED OVER THE MINIMUM <br />THICKNESS OF THE BASE INSULATION. <br />10.4. PROVIDE MANUFACTURER'S STANDARD CONTINUOUS WALKWAY/TRAFFIC <br />PADS FROM THE ROOF HATCH TO ALL ROOF TOP MECHANICAL <br />EQUIPMENT AND TO ALL ROOF LADDERS. AT MECHANICAL <br />EQUIPMENT PROVIDE WALKWAY PADS AT ALL (4) SIDES OF THE <br />EQUIPMENT. <br />10.5. PROVIDE CRICKETS AT THE UPSLOPE SIDE OF ALL ROOFTOP <br />EQUIPMENT. THIS INCLUDES, BUT IS NOT LIMITED TO, SKYLIGHTS, <br />ROOF HATCHES, RTUs, EXHAUST FANS, AND OTHER LARGE ITEMS. <br />CRICKETS ARE NOT REQUIRED AT PLUMBING PENETRATIONS. <br />TAPERED <br />INSULATION <br />C-31-D <br />ROOF <br />LADDER <br />ROOF PRIMARY ROOF tSLOPE— ROOF SLOPE <br />SCUPPER AND OVERFLOW ARROWS, LARGE <br />CONDUCTOR SCUPPER AND SMALL <br />ABBREVIATIONS <br />B.O.D. BOTTOM OF DECK T.O.D. TOP OF CONCRETE <br />L.P. LOW POINT T.O.M. TOP OF MASONRY <br />H.P. HIGH POINT T.O.P. TOP OF PARAPET <br />T.O.S. TOP OF STEEL. <br />KEYNOTES <br />1. ROOF ACCESS LADDER, PROVIDE CAGE IF REQUIRED, SEE 5/A-6.2. <br />2. AREA OF TAPERED INSULATION/CRICKET TO BE INSTALLED OVER BASE <br />ROOFING INSULATION. SLOPE 1/4" PER FOOT MINIMUM. <br />3. DASHED LINE INDICATES FACE OF WALL BELOW. <br />4. ROOF WALKWAY PADS. <br />5. SCUPPER, COLLECTOR HEAD, AND DOWNSPOUT, COLOR TO MATCH TRIM. <br />SEE ELEVATIONS AND 4/A-5.13. <br />6. OVER FLOW SCUPPER, SEE ELEVATIONS AND 4/A-5.13. <br />7. ROOF TOP UNIT ON CURB, SEE 2/A-6.2 FOR DETAILS AND SEE <br />STRUCTURAL AND MECHANICAL, ADJUST PLACEMENT OF UNITS WITH <br />LOCATIONS OF ROOF STRUCTURE. UNITS TO BE 10'-0" MIN FROM EDGE <br />OF ROOF, TYPICAL. <br />8. ROOFING OVER KICKERS <br />9. FULLY ADHERED, 60 MIL, WHITE TPO ROOF SYSTEM OVER RIGID R-25 <br />INSULATION. PROVIDE TAPERED INSULATION WHERE SHOWN AND WHERE <br />REQUIRED FOR POSITIVE DRAINAGE. PROVIDE TAPERED INSULATION <br />CRICKETS AT ALL UPSLOPE SIDES OF ROOF EQUIPMENT, TYPICAL. <br />10. PREFINISHED METAL CANOPY BELOW. <br />d d <br />3 M N <br />M <br />Ln <br />M '�O <br />a 0 N <br />z <br />0 <br />M M <br />W <br />O <br />Z <br />�= <br />v00 <br />N <br />O <br />L �} <br />Of <br />J <br />iW V <br />E <br />t� <br />vs <br />v v <br />C C <br />co <br />N <br />J .0 <br />a <br />¢ <br />~ <br />L <br />Q, Q <br />N <br />� <br />4- <br />C <br />M .o <br />.� <br />V <br />fr <br />o <br />U. <br />a <br />w <br />a) <br />< <br />Z <br />•L 'B <br />0 <br />0 <br />0 <br />L <br />N <br />W <br />N <br />> <br />o <br />O <br />W <br />L <br />p <br />WW <br />V <br />x <br />N <br />o <br />a <br />N <br />0 <br />E u_ <br />0��0 <br />0 <br />< P W M 0 O W <br />}cnwZn-OpW W <br />o�dDwzWWO <br />N = W _ ¢ a = <br />0_lxw¢M~o-r <br />}oW��C)uwjOf0 <br />aWE- -Z W0�0 <br />00MW WQwt—w <br />0 It <br />C/) 0Wti�Qt=_— <br />0�03: <br />H <br />0 <br />a <br />N <br />N <br />O <br />N_ <br />T <br />0 <br />as <br />C) <br />LJ.. <br />W <br />n. <br />W <br />0 <br />LL <br />0 <br />w <br />a3 <br />Sheet Name: <br />ROOF PLAN <br />Proj #: <br />Issue Date: <br />210316 <br />09/01 /2022 <br />Sheet No.: <br />A-201 <br />Drawn By: <br />Checked By: <br />DL <br />DS <br />— <br />ISSUED FOR CONSTRUCTION <br />