PLUMBING GENERAL NOTES
<br />I. FURNISH ALL LABOR, MATERIAL, AND EQUIPMENT REQUIRED FOR THE
<br />COMPLETION AND OPERATION OF ALL SYSTEMS IN THI5 SECTION OF WORK IN
<br />ACCORDANCE WITH ALL APPLICABLE CODES.
<br />2. ALL PLUMBING FIXTURES AND PLUMBING SYSTEM EQUIPMENT SHALL BE
<br />PROVIDED COMPLETE WITH ALL ACCESSORIES, HANGERS, VALVES, STOPS,
<br />TAILPIECES, TRAPS, FAUCETS, STRAINERS, ETC. SEE FIXTURE SCHEDULE.
<br />3. FURNISH AND INSTALL COMPLETE SYSTEMS OF SOIL, WASTE, VENT, HOT AND
<br />COLD WATER PIPING FROM ALL PLUMBING FIXTURES, AND/OR OTHER
<br />EQUIPMENT.
<br />4. CLEANOUT PLUGS SHALL BE INSTALLED IN ACCORDANCE WITH PLUMBING CODE
<br />REQUIREMENTS. PROVIDE CLEANOUT5 AT THE BASE OF ALL WASTE STACKS,
<br />AT EVERY FOUR 45 DEGREE TURNS, AND AT EVERY 100 FEET. CLEANOUTS
<br />SHALL BE PLACED IN READILY ACCE551BLE LOCATIONS.
<br />5. ALL SOIL, WASTE, AND VENT LINES SHALL BE CONCEALED IN THE BUILDING
<br />CONSTRUCTION.
<br />6. COPPER PIPING SHALL BE PROTECTED AGAINST CONTACT WITH MASONRY OR
<br />DISSIMILAR METALS. ALL HANGERS, SUPPORTS, ANCHORS, AND CLIPS SHALL
<br />BE COPPER OR COPPER PLATED. WHERE COPPER PIPING 15 CARRIED ON IRON
<br />TRAPEZE HANGERS WITH OTHER PIPING, SATISFACTORY AND PERMANENT
<br />ELECTROLYTIC ISOLATION MATERIAL SHALL PROTECT THE COPPER AGAINST
<br />CONTACT WITH OTHER METALS.
<br />7. WHERE COPPER PIPING 15 SLEEVED THROUGH MASONRY, SLEEVES SHALL BE
<br />COPPER OR RED BRASS. WHERE COPPER MUST BE CONCEALED IN A
<br />MASONRY PARTITION OR AGAINST MASONRY, CONTACT SHALL BE
<br />PREVENTED BY COATING THE COPPER HEAVILY WITH ASPHALTIC ENAMEL AND
<br />PROVIDING 15# ASPHALT SATURATED FELT BETWEEN THE PIPE AND MASONRY.
<br />8. THE PLUMBING CONTRACTOR SHALL COORDINATE CLOSELY WITH THE
<br />MECHANICAL AND THE ELECTRICAL CONTRACTORS TO AVOID CONFLICT WITH
<br />OTHER TRADES.
<br />9. CEILING AREA HAS LIMITED SPACE. CONTRACTOR MUST COORDINATE WITH
<br />OTHER TRADES FOR ALL STRUCTURES, PIPING, CONDUIT, DUCTWORK,
<br />LIGHTING, ETC. TO PROPERLY BE INSTALLED.
<br />10. ALL PIPE INSULATION SHALL RUN CONTINUOUSLY TNROIJGI-I FLOORS, WALLS,
<br />AND PARTITIONS.
<br />II. PROVIDE DRAIN VALVES IN THE NOT AND COLD WATER SYSTEM AT ALL LOW
<br />POINTS TO ALLOW FOR COMPLETE DRAINAGE.
<br />12. VACUUM BREAKERS SHALL BE PROVIDED FOR ALL FIXTURES TO WHICH HOSES
<br />MAY BE ATTACHED. VACUUM BREAKERS SHALL BE PERMANENTLY ATTACHED.
<br />13. WASTE AND VENT PIPING SHALL BE AS FOLLOWS:
<br />BELOW SLAB: PVC PIPE, PVC SOCKET FITTINGS, AND SOLVENT -CEMENTED
<br />FITTINGS.
<br />ABOVE SLAB: PVC PIPE, PVC SOCKET FITTINGS, AND SOLVENT -CEMENTED
<br />FITTINGS.
<br />14. STORM PIPING SHALL BE AS FOLLOWS: N/A
<br />15. DOMESTIC WATER PIPING ABOVE SLAB SHALL BE TYPE 'L' COPPER.
<br />DOMESTIC WATER PIPING BELOW SLAB SHALL BE TYPE 'K' COPPER.
<br />INSULATION IS REQUIRED ON ALL WATER SUPPLY PIPING ABOVE FINISHED
<br />FLOOR IN ACCORDANCE WITH THE STATE PLUMBING CODE OR PER LOCAL
<br />JURISDICTION.
<br />16. INVERT ELEVATIONS SHALL BE ESTABLISHED AND VERIFIED BEFORE WASTE
<br />PIPING 15 INSTALLED 50 THAT PROPER SLOPES WILL BE MAINTAINED.
<br />17. THE PLUMBING CONTRACTOR SHALL PROVIDE WATER HAMMER PROTECTION ON
<br />ALL WATER DISTRIBUTION PIPING WHERE QUICK -CLOSING VALVES ARE
<br />UTILIZED. INSTALLATION OF AIR CHAMBERS OR SHOCK ARRESTORS SHALL BE
<br />IN ACCORDANCE WITH PDI-WH2O1. SEE SHOCK ARRESTOR SCHEDULE (IF
<br />PROVIDED).
<br />16. PROVIDE FULL PORT VALVES IN ALL BRANCH LINES OF THE HOT AND COLD
<br />WATER DISTRIBUTION SYSTEM ON %' AND LARGER CW 4 HW AND AS SHOWN
<br />ON PLANS, RISERS, AND SCHEMATIC DETAILS.
<br />19. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS OF PLUMBING
<br />FIXTURES.
<br />20. PROVIDE ACCESS DOORS FOR ALL VALVES AND DEVICES REQUIRING ACCESS
<br />WHEN LOCATED IN WALLS OR ABOVE INACCESSIBLE CEILING CONSTRUCTION.
<br />21. PROVIDE DEEP SEAL TRAPS FOR ALL FLOOR DRAINS.
<br />22. WHERE EARTHQUAKE LOADS ARE APPLICABLE IN &CORDANCE WITH THE
<br />STATE PLUMBING CODE, PIPING AND EQUIPMENT SUPPORTS SHALL BE
<br />DESIGNED AND INSTALLED FOR THE SEISMIC FORCES IN ACCORDANCE WITH
<br />THE STATE BUILDING CODE.
<br />23. PROVIDE A U.L. LISTED ASSEMBLY FOR ALL PENETRATIONS THRU FIFE
<br />RATED WALLS AND FLOORS.
<br />24. PROVIDE PRESSURE REDUCING VALVE IF PRESSURE EXCEEDS 80 P51.
<br />25. ALL SUSPENDED MATERIALS AND EQUIPMENT SHALL BE INDIVIDUALLY
<br />SUPPORTED FROM THE BUILDING STRUCTURE. DO NOT SUSPEND ITEMS FROM
<br />THE CEILING OR ITS SUPPORT 5YTEM.
<br />26. NO INSULATION PERMITTED ON BACKFLOW PREVENTOR ASSEMBLY.
<br />SHOCK ARRESTOR SCHEDULE
<br />P.D.I. SIZE
<br />FIXTURE UNITS
<br />MANUFACTURER OR EQUAL
<br />SA'A'
<br />I - II
<br />ZURN, SMITH, PPI, 51OUX-CHIEF
<br />SA'B'
<br />12 - 32
<br />"
<br />LOCATE SHOCK ARRESTORS IN AN ACCE551BLE LOCATION, OR PROVIDE
<br />51OUX-CHIEF 54-IOCK ARRESTORS ONLY.
<br />PROVIDE SHOCK ARRESTORS AS INDICATED PER SCHEDULE.
<br />SHOCK ARRE5TOR5 SHALL BE SAME 51ZE AS PIPE INSTALLED ON, MINIMUM.
<br />P.C. TO FIELD VERIFY 'ALL' EXISTING CONDITIONS BEFORE ANY PLUMBING WORK 15
<br />TO BE DONE. NEW AND EXISTING INVERT ELEVATIONS ARE ALSO TO BE FIELD
<br />VERIFIED AND/OR DETERMINED PRIOR TO INSTALLATION OF PIPING.
<br />P.C. SHALL SAWCUT SLAB AS N,CE55ARY TO INSTALL CODE COMPLIANT SANITARY
<br />SYSTEM AS SHOWN ON PLANS. COORDINATE WITH GC.
<br />PLUMBING I..C-GEND
<br />DOMESTIC COLD WATER PIPING
<br />DOMESTIC NOT WATER PIPING
<br />- - - - - - - VENT PIPING
<br />WASTE (SANITARY SEWER)
<br />FULL PORT VALVE
<br />-t CHECK VALVE
<br />-O PIPE UP
<br />PIPE DOWN
<br />(E) EXISTING PIPING
<br />CONNECT TO EXISTING
<br />AAV
<br />AIR ADMITTANCE VALVE
<br />ABV
<br />ABOVE
<br />AFF
<br />ABOVE FINISHED FLOOR
<br />CW
<br />COLD WATER
<br />DN
<br />DOWN
<br />E.C.
<br />ELECTRICAL SUB -CONTRACTOR
<br />FR
<br />FROM
<br />G.C.
<br />GENERAL CONTRACTOR
<br />HW
<br />NOT WATER
<br />M.C.
<br />MECHANICAL SUB -CONTRACTOR
<br />P.C.
<br />PLUMBING SUB -CONTRACTOR
<br />V
<br />VENT
<br />W
<br />WASTE
<br />GENERAL NOTES
<br />I. THESE PLANS ARE DIAGRAMMATIC AND MAY NOT
<br />SHOW MINOR DETAILS AND LOCATIONS. FOR
<br />DIMENSIONS, REFER TO THE ARCHITECTURAL PLANS.
<br />2. COORDINATE ALL WORK WITH OTHER TRADES PRIOR.
<br />TO INSTALLATION OF ANY VIORK.
<br />3. VERIFY THE LOCATION OF ALL EQUIPMENT SUPPLIED
<br />BY OTHERS.
<br />4. PROVIDE A DIELECTRIC UNION WHEN CONNECTING
<br />DISSIMILAR METALS.
<br />5. PROVIDE FIRE RATED SLEEVES IN ALL LOCATIONS
<br />WHERE PENETRATIONS OF RATED WALLS AND FLOORS
<br />ARE MADE. ALL OPENINGS WILL BE MADE FIREPROOF.
<br />6. ALL VENT LINES SHALL SLOPE UP TO VENT THROUGH
<br />WALL. VENT THROUGH WALL SHALL BE 10'-0'
<br />MINIMUM FROM ANY FRESH AIR INTAKES.
<br />7. ALL WASTE STACKS SHALL HAVE A CLEAN OUT AT
<br />THE BASE OF THE STACK. COORDINATE LOCATION OF
<br />CLEAN OUTS WITH CASEWORK.
<br />8. PROVIDE ISOLATION VALVES AT ALL FIXTURES.
<br />9. SEE ARCHITECTURAL DRAWINGS FOR MOUNTING
<br />HEIGHTS OF PLUMBING FIXTURES.
<br />10. ALL LAVATORIES SHALL HAVE INSULATION ON ANY
<br />EXPOSED PIPES.
<br />11, COMPLETELY ROD AND FLUSH OUT ALL SANITARY
<br />WASTE LINES AFTER BUILDING IS COMPLETED.
<br />12. PROVIDE CHROME ESCUTCHEON RINGS AT ALL
<br />EXPOSED CEILING AND WALL PENETRATIONS.
<br />13. ALL HW 4 CW PIPING TO BE INSULATED WITH I'
<br />F@ERGLASS INSULATION.
<br />14. I;FtNT TAPE BALL BE PROVIDED FUR ALL ILYONESTIC
<br />rdr1TER D, jES LOCATED IN EX i !'RIOR WALLS IN
<br />CLIMATE.:: WHERE PIPES ARE SUBJECT TO FREF7114G.
<br />15. ROUTE ALI. PLUMBING !WATER SUFPLY LINE5 12'
<br />MINIMUM BELOW mc5T LINE IN CL!MATFS WHERE
<br />PINES ARE SUBJECT TO FREEZING.
<br />16. GC. SHALL REPAIR/REPi-.ACE AND REFINISH ANY
<br />PORTION OF THE EXISTING CONCRETE SLAB WHICH IS
<br />REQUIRED TO BE REMOVED IN ORDER TO INSTALL
<br />UNDER SLAB SYSTEM.
<br />17. GC SHALL BE RESPONSIBLE FOR ANY ADJUSTMENT
<br />REQUIRED TO EXISTING SANITARY FOR CONNECTION
<br />TO BE ACHIEVED.
<br />KEYED NOTES THIS SHEET ONLY
<br />OI CONNECT TO EXISTING WASTE OF THE SAME SIZE OR
<br />LARGER BELOW SLAB.
<br />OCONNECT TO EXISTING CW OF THE SAME SIZE OR LARGER
<br />AT CEILING.
<br />PLUMBING FIXTURE SPECIFICATIONS AND CONNECTION SCHEDULE
<br />FAUCETNALVE
<br />GRAIN
<br />PIPE SIZES
<br />MARK
<br />FIXTURE
<br />TYPE
<br />MANUFACTURER
<br />MODEL NO.
<br />MATERIAL
<br />STYLE
<br />AND STOP5
<br />MOWING
<br />REMARKS
<br />MANUFACT.
<br />MODEL NO.
<br />SPOUTHANDLES
<br />CENTERS
<br />TYPE
<br />SIZE
<br />WASTE
<br />VENT
<br />CW
<br />M
<br />P-I
<br />WATER
<br />FLUSH
<br />AMERICAN
<br />2898.012
<br />VITREOUS
<br />STANDARD
<br />_
<br />_
<br />_
<br />_
<br />_
<br />_
<br />McQUIRE
<br />3"
<br />2"
<br />"
<br />-
<br />FLOOR
<br />WROIPOVIDE WNO p N OPEN FRONT SEAT
<br />CLOSET
<br />TANK
<br />STANDARD
<br />CHINA
<br />ELONGATED
<br />185
<br />P-2
<br />LAVATORY
<br />WALL
<br />AMERICAN
<br />0355.012
<br />VITREOUS
<br />ADA
<br />DELTA
<br />CENTERSET
<br />SINGLE
<br />4 "
<br />GRID
<br />lie "
<br />MGQUIRE
<br />175 WITH
<br />2 "
<br />1� "
<br />�Z "
<br />"
<br />WALL
<br />MOUNT AT ADA HEIGHT.
<br />HUNG
<br />STANDARD
<br />CHINA
<br />COMPLIANT
<br />523-HDF
<br />LEVER
<br />PW2125
<br />HUNG
<br />PROVIDE MOP HANGER, NOSE,
<br />P-3
<br />MOP SINK
<br />FLOOR
<br />FLORESTONE
<br />MSR-2424
<br />TERRAllO
<br />24" X 24'
<br />FIAT
<br />AT
<br />THREADED
<br />TWO
<br />8"
<br />-
<br />-
<br />3"
<br />Q2"
<br />�4"
<br />%0
<br />FLOOR
<br />NOSE BRACKET, AND VACUUM
<br />MOUNTED
<br />12" HIGH
<br />83
<br />HANDLES
<br />BREAKER.
<br />P-4
<br />WATER
<br />DOUBLE
<br />OASIS
<br />PSACSL
<br />STAINLESS
<br />ADA
<br />_
<br />_
<br />_
<br />_
<br />_
<br />ly'
<br />2
<br />McQUIRE
<br />2'
<br />1�2"
<br />y'
<br />2
<br />-
<br />WALL
<br />MOUNT AT ADA HEIGHT
<br />COOLER
<br />STATION
<br />STEEL
<br />COMPLIANT
<br />165
<br />FGO
<br />FLOOR
<br />SQUARE
<br />J.R. SMITH
<br />��
<br />CAST
<br />NICKEL
<br />_
<br />_
<br />-
<br />-
<br />-
<br />-
<br />-
<br />-
<br />-
<br />-
<br />-
<br />FLOOR
<br />CLEAN -OUT
<br />TOP
<br />IRON
<br />BRONZE TOP
<br />WCO
<br />WALL
<br />ROUND
<br />J.R. SMITH
<br />4472
<br />CAST
<br />S.S.
<br />_
<br />_
<br />_
<br />_
<br />_
<br />_
<br />_
<br />_
<br />_
<br />-
<br />-
<br />WALL
<br />CLEAN -OUT
<br />COVER
<br />IRON
<br />COVER
<br />WATER
<br />GLA55
<br />SEE
<br />SEE
<br />SEE
<br />10 GAL. STORAGE, 3.OKW, 20BV,
<br />EWN-I
<br />NEATER
<br />ELECTRIC
<br />A.O.SMITH
<br />DEL-100
<br />LINED
<br />LOWBOY
<br />_
<br />_
<br />_
<br />_
<br />_
<br />_
<br />_
<br />_
<br />PLAN
<br />PLAN
<br />DETAIL
<br />IS GPH REC AT 100'F RISE
<br />PROVIDE DRAIN PAN
<br />NOTES:
<br />I. CATALOG NUMBERS AND MANUFACTURERS ARE TO INDICATE TYPE AND QUALITY OF FIXTURE DESIRED. SUBMIT CUTSHEETS OF THESE AND ALTERNATE MANUFACTURERS FOR
<br />ARCHITECT AND OWNER APPROVAL PRIOR TO PURCHASE OF ANY FIXTURES. INFORMATION ON ALTERNATE FIXTURES PROPOSED BY THE CONTRACTOR SHALL INCLUDE THE ADD/DEDUCT
<br />ASSOCIATED WITH ACCEPTANCE OF THAT FIXTURE (OR THE ALTERNATE PACKAGE AS A WHOLE).
<br />�iI
<br />THRREADEL
<br />CLEANOUT
<br />PLUG
<br />TEST TEE
<br />'-OVER PLATE WITH
<br />SECURING SCREW
<br />FOR BLOCK WALLS
<br />FINISHED
<br />WALL.
<br />( :D�NO
<br />ALL CLEANOUT DETAIL
<br />SCALE (WCO)
<br />SERVICE FAUrF*
<br />WITH VACUUI'
<br />BREAKER -
<br />30" NOS
<br />NOSE
<br />BRACKET
<br />a
<br />IIMOP
<br />SINK
<br />cz -
<br />MOP HANGER
<br />MOP
<br />(BY OTHERS)
<br />PROVIDE SILICONE SEALANT
<br />AROUND TOP OF SINK AT
<br />ALL WALLS
<br />--FIN. FLR.
<br />P-TRAP
<br />0 MOP SINS: DETAIL
<br />NO SCALE
<br />VACUUM BREAKER
<br />SHUT --OFF
<br />VALVE
<br />WALL
<br />UNION (TYP) -
<br />SECURE
<br />TO WALL
<br />lye" DEEP GALV.
<br />DRAIN PAN -
<br />r CW
<br />NW
<br />EXPANSION TANK
<br />TEMPERATURE AND
<br />PRESSURE RELIEF VALVE
<br />EW14-1 DISCHARGE FULL SIZE
<br />OF VALVE DISCHARGE.
<br />SPILL INTO MOP SINK
<br />�NrNB
<br />l NOTE:
<br />MOUNT WATER NEATER AS
<br />NIGH AS POSSIBLE ABOVE CEILING.
<br />PLATFORM BY GC. SIZE PER LOCAL SEISMIC
<br />REQUIREMENTS AND TOTAL WEIGHT OF
<br />WATER NEATER FULL OF WATER.
<br />I' DRAIN LINE
<br />TO MOP SINK.
<br />P-4
<br />DPARTIAL WASTE PLAN
<br />1 /4 = 1 -0
<br />91
<br />P-4
<br />PARTIAL WASTE PLAN
<br />1 /4" = 1'-0"
<br />WA"rFR PIPING SIZES SIIALL BE y2
<br />UNLESS OTEERWISE SPECIFIED.
<br />�I� 3"VTR
<br />3 !N0
<br />ATER HEATER DETAIL 6 PARTIAL WASTE PLAN
<br />SCALE 1/4 of = 1'-0"
<br />NOTE:
<br />I. INSTALL WATER HEATER PER MANUFACTURER REQUIREMENTS.
<br />2. PROVIDE NEAT TRAP ON CW AND NW LINES PER ENERGY CODE.
<br />P-3
<br />4 HW
<br />WH-I
<br />-3
<br />FINISH FLOOR LEVEL
<br />Charlotte, North Carolina 28203
<br />tel 704.373.0068 fax 704.373.0260
<br />MECHANICAL ELECTRICAL PLUMBING
<br />%,001111111111
<br />,�� 000•0000•o.•
<br />`��'
<br />• -
<br />V."
<br />STATE OF.0 A--
<br />;
<br />111 j j% 5a
<br />TOP SUITABLE FOR
<br />FINISHED FLOOR
<br />TILE, CARPET, tONC., ETC.
<br />SOIL PIPE
<br />INTERIOR CLEANOUT DETAIL
<br />NO SCALE (FCO)
<br />W
<br />�o
<br />N��
<br />Q) CV 9)
<br />�00M
<br />N
<br />�
<br />0
<br />cu
<br />�
<br />ns d-�
<br />�j
<br />c: 0
<br />�
<br />�L� c6
<br />�Qorn�
<br />Z g)
<br />� \
<br />\\✓J
<br />U)
<br />M
<br />O
<br />�o
<br />L
<br />U Ucc
<br />.-.
<br />o �-
<br />ISSUED FOR REVIEW
<br />DATE:
<br />ISSUED FOR PERMIT
<br />DATE:
<br />ISSUED FOR CONSTRUCTION
<br />DATE:
<br />w
<br />Q
<br />0
<br />z
<br />0
<br />a
<br />U
<br />w
<br />0
<br />W
<br />00-0
<br />� Q
<br />z
<br />Q
<br />LLJ
<br />J
<br />D
<br />Lu
<br />C0 U
<br />o
<br />0
<br />ti
<br />z
<br />0
<br />o_
<br />00-0 CV
<br />O It (�
<br />c z
<br />J
<br />ou-
<br />LL > J m
<br />J _
<br />_ w
<br />w N a-
<br />z (0N
<br />DATE: 12.29.10
<br />DRAWN BY: SABER
<br />CHECKED BY: SABER.
<br />SHEET
<br />p 1
<br />LRZ-1019-POl.dwg, Plotted sy: Rick
<br />Jan 04, 2011 - &37am