PLUMBING GENERAL NOTES <br />I. FURNISH ALL LABOR, MATERIAL, AND EQUIPMENT REQUIRED FOR THE <br />COMPLETION AND OPERATION OF ALL SYSTEMS IN THI5 SECTION OF WORK IN <br />ACCORDANCE WITH ALL APPLICABLE CODES. <br />2. ALL PLUMBING FIXTURES AND PLUMBING SYSTEM EQUIPMENT SHALL BE <br />PROVIDED COMPLETE WITH ALL ACCESSORIES, HANGERS, VALVES, STOPS, <br />TAILPIECES, TRAPS, FAUCETS, STRAINERS, ETC. SEE FIXTURE SCHEDULE. <br />3. FURNISH AND INSTALL COMPLETE SYSTEMS OF SOIL, WASTE, VENT, HOT AND <br />COLD WATER PIPING FROM ALL PLUMBING FIXTURES, AND/OR OTHER <br />EQUIPMENT. <br />4. CLEANOUT PLUGS SHALL BE INSTALLED IN ACCORDANCE WITH PLUMBING CODE <br />REQUIREMENTS. PROVIDE CLEANOUT5 AT THE BASE OF ALL WASTE STACKS, <br />AT EVERY FOUR 45 DEGREE TURNS, AND AT EVERY 100 FEET. CLEANOUTS <br />SHALL BE PLACED IN READILY ACCE551BLE LOCATIONS. <br />5. ALL SOIL, WASTE, AND VENT LINES SHALL BE CONCEALED IN THE BUILDING <br />CONSTRUCTION. <br />6. COPPER PIPING SHALL BE PROTECTED AGAINST CONTACT WITH MASONRY OR <br />DISSIMILAR METALS. ALL HANGERS, SUPPORTS, ANCHORS, AND CLIPS SHALL <br />BE COPPER OR COPPER PLATED. WHERE COPPER PIPING 15 CARRIED ON IRON <br />TRAPEZE HANGERS WITH OTHER PIPING, SATISFACTORY AND PERMANENT <br />ELECTROLYTIC ISOLATION MATERIAL SHALL PROTECT THE COPPER AGAINST <br />CONTACT WITH OTHER METALS. <br />7. WHERE COPPER PIPING 15 SLEEVED THROUGH MASONRY, SLEEVES SHALL BE <br />COPPER OR RED BRASS. WHERE COPPER MUST BE CONCEALED IN A <br />MASONRY PARTITION OR AGAINST MASONRY, CONTACT SHALL BE <br />PREVENTED BY COATING THE COPPER HEAVILY WITH ASPHALTIC ENAMEL AND <br />PROVIDING 15# ASPHALT SATURATED FELT BETWEEN THE PIPE AND MASONRY. <br />8. THE PLUMBING CONTRACTOR SHALL COORDINATE CLOSELY WITH THE <br />MECHANICAL AND THE ELECTRICAL CONTRACTORS TO AVOID CONFLICT WITH <br />OTHER TRADES. <br />9. CEILING AREA HAS LIMITED SPACE. CONTRACTOR MUST COORDINATE WITH <br />OTHER TRADES FOR ALL STRUCTURES, PIPING, CONDUIT, DUCTWORK, <br />LIGHTING, ETC. TO PROPERLY BE INSTALLED. <br />10. ALL PIPE INSULATION SHALL RUN CONTINUOUSLY TNROIJGI-I FLOORS, WALLS, <br />AND PARTITIONS. <br />II. PROVIDE DRAIN VALVES IN THE NOT AND COLD WATER SYSTEM AT ALL LOW <br />POINTS TO ALLOW FOR COMPLETE DRAINAGE. <br />12. VACUUM BREAKERS SHALL BE PROVIDED FOR ALL FIXTURES TO WHICH HOSES <br />MAY BE ATTACHED. VACUUM BREAKERS SHALL BE PERMANENTLY ATTACHED. <br />13. WASTE AND VENT PIPING SHALL BE AS FOLLOWS: <br />BELOW SLAB: PVC PIPE, PVC SOCKET FITTINGS, AND SOLVENT -CEMENTED <br />FITTINGS. <br />ABOVE SLAB: PVC PIPE, PVC SOCKET FITTINGS, AND SOLVENT -CEMENTED <br />FITTINGS. <br />14. STORM PIPING SHALL BE AS FOLLOWS: N/A <br />15. DOMESTIC WATER PIPING ABOVE SLAB SHALL BE TYPE 'L' COPPER. <br />DOMESTIC WATER PIPING BELOW SLAB SHALL BE TYPE 'K' COPPER. <br />INSULATION IS REQUIRED ON ALL WATER SUPPLY PIPING ABOVE FINISHED <br />FLOOR IN ACCORDANCE WITH THE STATE PLUMBING CODE OR PER LOCAL <br />JURISDICTION. <br />16. INVERT ELEVATIONS SHALL BE ESTABLISHED AND VERIFIED BEFORE WASTE <br />PIPING 15 INSTALLED 50 THAT PROPER SLOPES WILL BE MAINTAINED. <br />17. THE PLUMBING CONTRACTOR SHALL PROVIDE WATER HAMMER PROTECTION ON <br />ALL WATER DISTRIBUTION PIPING WHERE QUICK -CLOSING VALVES ARE <br />UTILIZED. INSTALLATION OF AIR CHAMBERS OR SHOCK ARRESTORS SHALL BE <br />IN ACCORDANCE WITH PDI-WH2O1. SEE SHOCK ARRESTOR SCHEDULE (IF <br />PROVIDED). <br />16. PROVIDE FULL PORT VALVES IN ALL BRANCH LINES OF THE HOT AND COLD <br />WATER DISTRIBUTION SYSTEM ON %' AND LARGER CW 4 HW AND AS SHOWN <br />ON PLANS, RISERS, AND SCHEMATIC DETAILS. <br />19. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS OF PLUMBING <br />FIXTURES. <br />20. PROVIDE ACCESS DOORS FOR ALL VALVES AND DEVICES REQUIRING ACCESS <br />WHEN LOCATED IN WALLS OR ABOVE INACCESSIBLE CEILING CONSTRUCTION. <br />21. PROVIDE DEEP SEAL TRAPS FOR ALL FLOOR DRAINS. <br />22. WHERE EARTHQUAKE LOADS ARE APPLICABLE IN &CORDANCE WITH THE <br />STATE PLUMBING CODE, PIPING AND EQUIPMENT SUPPORTS SHALL BE <br />DESIGNED AND INSTALLED FOR THE SEISMIC FORCES IN ACCORDANCE WITH <br />THE STATE BUILDING CODE. <br />23. PROVIDE A U.L. LISTED ASSEMBLY FOR ALL PENETRATIONS THRU FIFE <br />RATED WALLS AND FLOORS. <br />24. PROVIDE PRESSURE REDUCING VALVE IF PRESSURE EXCEEDS 80 P51. <br />25. ALL SUSPENDED MATERIALS AND EQUIPMENT SHALL BE INDIVIDUALLY <br />SUPPORTED FROM THE BUILDING STRUCTURE. DO NOT SUSPEND ITEMS FROM <br />THE CEILING OR ITS SUPPORT 5YTEM. <br />26. NO INSULATION PERMITTED ON BACKFLOW PREVENTOR ASSEMBLY. <br />SHOCK ARRESTOR SCHEDULE <br />P.D.I. SIZE <br />FIXTURE UNITS <br />MANUFACTURER OR EQUAL <br />SA'A' <br />I - II <br />ZURN, SMITH, PPI, 51OUX-CHIEF <br />SA'B' <br />12 - 32 <br />" <br />LOCATE SHOCK ARRESTORS IN AN ACCE551BLE LOCATION, OR PROVIDE <br />51OUX-CHIEF 54-IOCK ARRESTORS ONLY. <br />PROVIDE SHOCK ARRESTORS AS INDICATED PER SCHEDULE. <br />SHOCK ARRE5TOR5 SHALL BE SAME 51ZE AS PIPE INSTALLED ON, MINIMUM. <br />P.C. TO FIELD VERIFY 'ALL' EXISTING CONDITIONS BEFORE ANY PLUMBING WORK 15 <br />TO BE DONE. NEW AND EXISTING INVERT ELEVATIONS ARE ALSO TO BE FIELD <br />VERIFIED AND/OR DETERMINED PRIOR TO INSTALLATION OF PIPING. <br />P.C. SHALL SAWCUT SLAB AS N,CE55ARY TO INSTALL CODE COMPLIANT SANITARY <br />SYSTEM AS SHOWN ON PLANS. COORDINATE WITH GC. <br />PLUMBING I..C-GEND <br />DOMESTIC COLD WATER PIPING <br />DOMESTIC NOT WATER PIPING <br />- - - - - - - VENT PIPING <br />WASTE (SANITARY SEWER) <br />FULL PORT VALVE <br />-t CHECK VALVE <br />-O PIPE UP <br />PIPE DOWN <br />(E) EXISTING PIPING <br />CONNECT TO EXISTING <br />AAV <br />AIR ADMITTANCE VALVE <br />ABV <br />ABOVE <br />AFF <br />ABOVE FINISHED FLOOR <br />CW <br />COLD WATER <br />DN <br />DOWN <br />E.C. <br />ELECTRICAL SUB -CONTRACTOR <br />FR <br />FROM <br />G.C. <br />GENERAL CONTRACTOR <br />HW <br />NOT WATER <br />M.C. <br />MECHANICAL SUB -CONTRACTOR <br />P.C. <br />PLUMBING SUB -CONTRACTOR <br />V <br />VENT <br />W <br />WASTE <br />GENERAL NOTES <br />I. THESE PLANS ARE DIAGRAMMATIC AND MAY NOT <br />SHOW MINOR DETAILS AND LOCATIONS. FOR <br />DIMENSIONS, REFER TO THE ARCHITECTURAL PLANS. <br />2. COORDINATE ALL WORK WITH OTHER TRADES PRIOR. <br />TO INSTALLATION OF ANY VIORK. <br />3. VERIFY THE LOCATION OF ALL EQUIPMENT SUPPLIED <br />BY OTHERS. <br />4. PROVIDE A DIELECTRIC UNION WHEN CONNECTING <br />DISSIMILAR METALS. <br />5. PROVIDE FIRE RATED SLEEVES IN ALL LOCATIONS <br />WHERE PENETRATIONS OF RATED WALLS AND FLOORS <br />ARE MADE. ALL OPENINGS WILL BE MADE FIREPROOF. <br />6. ALL VENT LINES SHALL SLOPE UP TO VENT THROUGH <br />WALL. VENT THROUGH WALL SHALL BE 10'-0' <br />MINIMUM FROM ANY FRESH AIR INTAKES. <br />7. ALL WASTE STACKS SHALL HAVE A CLEAN OUT AT <br />THE BASE OF THE STACK. COORDINATE LOCATION OF <br />CLEAN OUTS WITH CASEWORK. <br />8. PROVIDE ISOLATION VALVES AT ALL FIXTURES. <br />9. SEE ARCHITECTURAL DRAWINGS FOR MOUNTING <br />HEIGHTS OF PLUMBING FIXTURES. <br />10. ALL LAVATORIES SHALL HAVE INSULATION ON ANY <br />EXPOSED PIPES. <br />11, COMPLETELY ROD AND FLUSH OUT ALL SANITARY <br />WASTE LINES AFTER BUILDING IS COMPLETED. <br />12. PROVIDE CHROME ESCUTCHEON RINGS AT ALL <br />EXPOSED CEILING AND WALL PENETRATIONS. <br />13. ALL HW 4 CW PIPING TO BE INSULATED WITH I' <br />F@ERGLASS INSULATION. <br />14. I;FtNT TAPE BALL BE PROVIDED FUR ALL ILYONESTIC <br />rdr1TER D, jES LOCATED IN EX i !'RIOR WALLS IN <br />CLIMATE.:: WHERE PIPES ARE SUBJECT TO FREF7114G. <br />15. ROUTE ALI. PLUMBING !WATER SUFPLY LINE5 12' <br />MINIMUM BELOW mc5T LINE IN CL!MATFS WHERE <br />PINES ARE SUBJECT TO FREEZING. <br />16. GC. SHALL REPAIR/REPi-.ACE AND REFINISH ANY <br />PORTION OF THE EXISTING CONCRETE SLAB WHICH IS <br />REQUIRED TO BE REMOVED IN ORDER TO INSTALL <br />UNDER SLAB SYSTEM. <br />17. GC SHALL BE RESPONSIBLE FOR ANY ADJUSTMENT <br />REQUIRED TO EXISTING SANITARY FOR CONNECTION <br />TO BE ACHIEVED. <br />KEYED NOTES THIS SHEET ONLY <br />OI CONNECT TO EXISTING WASTE OF THE SAME SIZE OR <br />LARGER BELOW SLAB. <br />OCONNECT TO EXISTING CW OF THE SAME SIZE OR LARGER <br />AT CEILING. <br />PLUMBING FIXTURE SPECIFICATIONS AND CONNECTION SCHEDULE <br />FAUCETNALVE <br />GRAIN <br />PIPE SIZES <br />MARK <br />FIXTURE <br />TYPE <br />MANUFACTURER <br />MODEL NO. <br />MATERIAL <br />STYLE <br />AND STOP5 <br />MOWING <br />REMARKS <br />MANUFACT. <br />MODEL NO. <br />SPOUTHANDLES <br />CENTERS <br />TYPE <br />SIZE <br />WASTE <br />VENT <br />CW <br />M <br />P-I <br />WATER <br />FLUSH <br />AMERICAN <br />2898.012 <br />VITREOUS <br />STANDARD <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />McQUIRE <br />3" <br />2" <br />" <br />- <br />FLOOR <br />WROIPOVIDE WNO p N OPEN FRONT SEAT <br />CLOSET <br />TANK <br />STANDARD <br />CHINA <br />ELONGATED <br />185 <br />P-2 <br />LAVATORY <br />WALL <br />AMERICAN <br />0355.012 <br />VITREOUS <br />ADA <br />DELTA <br />CENTERSET <br />SINGLE <br />4 " <br />GRID <br />lie " <br />MGQUIRE <br />175 WITH <br />2 " <br />1� " <br />�Z " <br />" <br />WALL <br />MOUNT AT ADA HEIGHT. <br />HUNG <br />STANDARD <br />CHINA <br />COMPLIANT <br />523-HDF <br />LEVER <br />PW2125 <br />HUNG <br />PROVIDE MOP HANGER, NOSE, <br />P-3 <br />MOP SINK <br />FLOOR <br />FLORESTONE <br />MSR-2424 <br />TERRAllO <br />24" X 24' <br />FIAT <br />AT <br />THREADED <br />TWO <br />8" <br />- <br />- <br />3" <br />Q2" <br />�4" <br />%0 <br />FLOOR <br />NOSE BRACKET, AND VACUUM <br />MOUNTED <br />12" HIGH <br />83 <br />HANDLES <br />BREAKER. <br />P-4 <br />WATER <br />DOUBLE <br />OASIS <br />PSACSL <br />STAINLESS <br />ADA <br />_ <br />_ <br />_ <br />_ <br />_ <br />ly' <br />2 <br />McQUIRE <br />2' <br />1�2" <br />y' <br />2 <br />- <br />WALL <br />MOUNT AT ADA HEIGHT <br />COOLER <br />STATION <br />STEEL <br />COMPLIANT <br />165 <br />FGO <br />FLOOR <br />SQUARE <br />J.R. SMITH <br />�� <br />CAST <br />NICKEL <br />_ <br />_ <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />FLOOR <br />CLEAN -OUT <br />TOP <br />IRON <br />BRONZE TOP <br />WCO <br />WALL <br />ROUND <br />J.R. SMITH <br />4472 <br />CAST <br />S.S. <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />- <br />- <br />WALL <br />CLEAN -OUT <br />COVER <br />IRON <br />COVER <br />WATER <br />GLA55 <br />SEE <br />SEE <br />SEE <br />10 GAL. STORAGE, 3.OKW, 20BV, <br />EWN-I <br />NEATER <br />ELECTRIC <br />A.O.SMITH <br />DEL-100 <br />LINED <br />LOWBOY <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />PLAN <br />PLAN <br />DETAIL <br />IS GPH REC AT 100'F RISE <br />PROVIDE DRAIN PAN <br />NOTES: <br />I. CATALOG NUMBERS AND MANUFACTURERS ARE TO INDICATE TYPE AND QUALITY OF FIXTURE DESIRED. SUBMIT CUTSHEETS OF THESE AND ALTERNATE MANUFACTURERS FOR <br />ARCHITECT AND OWNER APPROVAL PRIOR TO PURCHASE OF ANY FIXTURES. INFORMATION ON ALTERNATE FIXTURES PROPOSED BY THE CONTRACTOR SHALL INCLUDE THE ADD/DEDUCT <br />ASSOCIATED WITH ACCEPTANCE OF THAT FIXTURE (OR THE ALTERNATE PACKAGE AS A WHOLE). <br />�iI <br />THRREADEL <br />CLEANOUT <br />PLUG <br />TEST TEE <br />'-OVER PLATE WITH <br />SECURING SCREW <br />FOR BLOCK WALLS <br />FINISHED <br />WALL. <br />( :D�NO <br />ALL CLEANOUT DETAIL <br />SCALE (WCO) <br />SERVICE FAUrF* <br />WITH VACUUI' <br />BREAKER - <br />30" NOS <br />NOSE <br />BRACKET <br />a <br />IIMOP <br />SINK <br />cz - <br />MOP HANGER <br />MOP <br />(BY OTHERS) <br />PROVIDE SILICONE SEALANT <br />AROUND TOP OF SINK AT <br />ALL WALLS <br />--FIN. FLR. <br />P-TRAP <br />0 MOP SINS: DETAIL <br />NO SCALE <br />VACUUM BREAKER <br />SHUT --OFF <br />VALVE <br />WALL <br />UNION (TYP) - <br />SECURE <br />TO WALL <br />lye" DEEP GALV. <br />DRAIN PAN - <br />r CW <br />NW <br />EXPANSION TANK <br />TEMPERATURE AND <br />PRESSURE RELIEF VALVE <br />EW14-1 DISCHARGE FULL SIZE <br />OF VALVE DISCHARGE. <br />SPILL INTO MOP SINK <br />�NrNB <br />l NOTE: <br />MOUNT WATER NEATER AS <br />NIGH AS POSSIBLE ABOVE CEILING. <br />PLATFORM BY GC. SIZE PER LOCAL SEISMIC <br />REQUIREMENTS AND TOTAL WEIGHT OF <br />WATER NEATER FULL OF WATER. <br />I' DRAIN LINE <br />TO MOP SINK. <br />P-4 <br />DPARTIAL WASTE PLAN <br />1 /4 = 1 -0 <br />91 <br />P-4 <br />PARTIAL WASTE PLAN <br />1 /4" = 1'-0" <br />WA"rFR PIPING SIZES SIIALL BE y2 <br />UNLESS OTEERWISE SPECIFIED. <br />�I� 3"VTR <br />3 !N0 <br />ATER HEATER DETAIL 6 PARTIAL WASTE PLAN <br />SCALE 1/4 of = 1'-0" <br />NOTE: <br />I. INSTALL WATER HEATER PER MANUFACTURER REQUIREMENTS. <br />2. PROVIDE NEAT TRAP ON CW AND NW LINES PER ENERGY CODE. <br />P-3 <br />4 HW <br />WH-I <br />-3 <br />FINISH FLOOR LEVEL <br />Charlotte, North Carolina 28203 <br />tel 704.373.0068 fax 704.373.0260 <br />MECHANICAL ELECTRICAL PLUMBING <br />%,001111111111 <br />,�� 000•0000•o.• <br />`��' <br />• - <br />V." <br />STATE OF.0 A-- <br />; <br />111 j j% 5a <br />TOP SUITABLE FOR <br />FINISHED FLOOR <br />TILE, CARPET, tONC., ETC. <br />SOIL PIPE <br />INTERIOR CLEANOUT DETAIL <br />NO SCALE (FCO) <br />W <br />�o <br />N�� <br />Q) CV 9) <br />�00M <br />N <br />� <br />0 <br />cu <br />� <br />ns d-� <br />�j <br />c: 0 <br />� <br />�L� c6 <br />�Qorn� <br />Z g) <br />� \ <br />\\✓J <br />U) <br />M <br />O <br />�o <br />L <br />U Ucc <br />.-. <br />o �- <br />ISSUED FOR REVIEW <br />DATE: <br />ISSUED FOR PERMIT <br />DATE: <br />ISSUED FOR CONSTRUCTION <br />DATE: <br />w <br />Q <br />0 <br />z <br />0 <br />a <br />U <br />w <br />0 <br />W <br />00-0 <br />� Q <br />z <br />Q <br />LLJ <br />J <br />D <br />Lu <br />C0 U <br />o <br />0 <br />ti <br />z <br />0 <br />o_ <br />00-0 CV <br />O It (� <br />c z <br />J <br />ou- <br />LL > J m <br />J _ <br />_ w <br />w N a- <br />z (0N <br />DATE: 12.29.10 <br />DRAWN BY: SABER <br />CHECKED BY: SABER. <br />SHEET <br />p 1 <br />LRZ-1019-POl.dwg, Plotted sy: Rick <br />Jan 04, 2011 - &37am <br />