My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (102)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (102)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 9:54:01 AM
Creation date
2/18/2025 3:47:08 PM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
AP C Electrical
Building Plans - Permit #
19380
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NO. DESCRIPTION DATE <br />2 <br />0- <br />0 <br />EXIST 2" V = -= <br />SEXIST 1/2"0 <br />EXIST I"*'EXIST 1r, <br />EXIST 1 <br />II <br />II 1 II <br />u <br />EXIST 2"C <br />EXIST 11 <br />-EXIST 1 "HWR <br />17 <br />1 /8," = 11.011 <br />EXIST 2" <br />SUPPLY <br />u ROOM <br />EXIST 1 1 H N <br />EXIST 1 1/2"CW <br />-EXIST 6" S- - <br />EXIST 2"CW <br />1 <br />ID <br />21/2" CW "7L <br />2112" HW <br />FEC <br />a <br />Z VI' 2"S <br />I III 11/2"CW j <br />II 11THW <br />i <br />-EXIST 2112"CW <br />EXIST 21/2"HW <br />EXIST 314"HWR <br />I EXIST <br />EXIST 1/2"OX <br />;t <br />CT SCAN-1 <br />EXISTING TO REMAIN <br />IV, 1A,1OX,1SL I <br />'C67,11f0extL, <br />6" S- <br />TEMP PARTITION- OUST CONTROL <br />CT SCAN-2 <br />EXISTING TO <br />REMAIN MEDICAL <br />GAS VALVE BOX-/ <br />EQUIP, <br />TLT. ALCOVE RAD <br />GRAVITY PIPING PLAN -1ST LEVEL - CT <br />PLUMBING KEYNOTES <br />P1 <br />PROVIDE NEW PLUMBING FIXTURE, SANITARY AND VENT PIPING <br />PROVIDE ALL NECESSARY HARDWARE AND FITTINGS FOR A <br />COMPLETE INSTALLATION (TYPICAL). <br />P2 <br />CONNECT NEW VENT AND SANITARY PIPING AT LOCATION <br />SHOWN ON PLANS. CONTRACTOR TO VERIFY EXISTING <br />CONDITIONS PRIOR TO CONSTRUCTION. <br />w <br />2 <br />1 /8„ = 1 9-014 <br />FEC <br />CORR <br />TEMPORARY PARTITION WALL <br />EQUIP. <br />TLT. ALCOVE RAD <br />MECHANICAL FLOOR PLAN -1 ST LEVEL - CT <br />MECHANICAL KEYNOTES <br />M1 <br />PROVIDE CERTIFIED TSB REPORT OF EXISTING AIR DISTRIBUTION <br />DEVICES WITHIN PROJECT SCOPE. REBALANCE ADJACENT <br />SPACES AS NECESSARY WITHOUT JEOPARDIZING AIRFLOW TO <br />ARCHIVE DESIGN FROM WITHIN SCOPE BOUNDARY. <br />M2 <br />EXISTING TO REMAIN QUICK RESPONSE SPRINKLER HEAD. <br />M3 <br />PROVIDE A TEMPORARY NEPA FILTERED NEGATIVE AIR FAN FOR <br />CONSTRUCTION AREA. MAINTAIN A 0.03" NEGATIVE PRESSURE IN <br />THIS AREA RELATIVE TO THE ADJACENT SPACES. PROVIDE <br />ADDITIONAL NEGATIVE AIR MACHINES AS REQUIRED TO ACHIEVE <br />MINIMUM NEGATIVE PRESSURE. PROVIDE TEMPORARY DUST <br />BARRIER PARTITIONS. ALL EXISTING RETURN AND EXHAUST <br />REGISTERS LOCATED WITHIN THE RENOVATION AREA SHALL BE <br />PROVIDED WITH TEMPORARY CONSTRUCTION FILTERS. ROUTE <br />TEMPORARY 120FLEXIBLE DUCT FROM DISCHARGE OF HEPA <br />UNIT TO OUTSIDE OF TEMPORARY BARRIER. FAN CRITERIA: <br />MANUFACTURER HEPA-AIRE, MODEL-1800 PAS VARIABLE CFM - <br />1000 TO 1800 CFM ELECTRICAL:115 V,10 FLA <br />ICRA CLASSIFICATION SCHEDULE <br />CLASS 1 <br />1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS. <br />2. IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION. <br />3. MINOR DEMOLITION FOR REMODELING. <br />1. PROVIDES ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE. <br />2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING. <br />3. SEAL UNUSED DOORS WITH DUCT TAPE. <br />CLASS 11 <br />4. BLOCK OFF AND SEAL AIR VENTS. <br />5. WIPE SURFACES WITH DISINFECTANT. <br />❑ <br />6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. <br />7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA <br />8. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA <br />9. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED, <br />1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS. <br />2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM. <br />3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS. <br />4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES. <br />5. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES DEPARTMENT. <br />CLASS 111 <br />6. VACUUM WORK WITH HEPA FILTERED VACUUMS. <br />gf <br />7. WET MOP WITH DISINFECTANT. <br />8. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. <br />9. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. <br />10. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING. <br />11. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. <br />1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS. <br />2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM. <br />3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS. <br />4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES. <br />5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY. <br />6. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER <br />BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE. <br />7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. <br />CLASS IV <br />8. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS THOROUGHLY CLEANED BY THE ENVIRONMENTAL SERVICES DEPARTMENT AND <br />❑ <br />RELEASED BY SAFETY AND INFECTION CONTROL. <br />9. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. <br />10. WET MOP WITH DISINFECTANT. <br />11. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. <br />12. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS, <br />13. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING. <br />14. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE CONSTRUCTION IS BEING DONE. <br />Y-IN <br />DIFFUSER <br />NOTE: TO BE USED WHEN WINDOWS CANNOT BE TEMPORARILY REMOVED. <br />4'-10" <br />BASIS OF DESIGN (PROVIDE EQUAL): MINTIE TECHNOLOGIES, INC, <br />ECU CEILING CAVITY ENVELOPE <br />-DURABLE CA STATE FIRE MARSHAL FLAME -RATED PVC SHEETING - <br />HOSPITAL WHITE, EASY TO CLEAN WITH STANDARD CLEANER <br />-ONE 20.5" DOOR <br />-TWO CLEAR PANEL WINDOWS -14.0" x 40.0" <br />-TWO NEGATIVE AIR PORTS <br />11.0" ROUND PORT WITH DRAWSTRING AND SEAL <br />3.5" ROUND HEPA VACUUM PORT WITH DRAWSTING AND SEAL <br />-DOUBLE-REINFORCED FLOOR <br />-CLEAR POUCH TO DISPLAY WORKANFECTION CONTROL PERMIT <br />WEIGHT:15 POUNDS <br />�iEPAVACUUM PC... <br />WITH DRAWSTRING <br />AND SEAL <br />NEGATIVE AIR PRESSURE MACHINE &SCRUBBER i PORTABLE DUST ENCLOSURE 2 <br />No Scale No Scale <br />0 <br />too <br />e r` <br />E <br />(�Nl� <br />8 <br />M <br />Q <br />i <br />12 <br />O CD <br />.E_ Q �- <br />QLL00 <br />c0 z <br />0 a. <br />.O <br />t <br />to <br />Lu <br />Z <br />W W <br />H <br />W = <br />Z u <br />ZOC <br />O <br />W LL. <br />.-T <br />� <br />� <br />N <br />0 <br />. <br />1.0 <br />°o <br />O <br />W <br />, 4 <br />w <br />� <br />l <br />r <br />V <br />• <br />�/ <br />ke) <br />o <br />o <br />4 <br />w <br />u <br />Lu <br />$� <br />W <br />U <br />W <br />F- <br />_z <br />J <br />x <br />W <br />3 <br />U <br />W <br />as <br />Q <br />1z <br />w u, <br />R5 <br />Y <br />SEAL Aaron Lee Johnson, P.E. <br />Florida License #71576 <br />���` LEE '1111 <br />JOA/ <br />.� QUO G E IV tiS �. <br />No 71576 <br />;CC <br />:p STATE OF 4U <br />.-' <br />or <br />SHEET TITLE: <br />PLUMBING AND <br />MECHANICAL FLOOR PLAN <br />DATE: 10/25/17 <br />SCALE: AS SHOWN <br />SHEET NO.: <br />Pi , 1 <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.