PLOTTED: 3/24/2020 03:14 PM JOHN KRAMER <br />MAINTENANCE/INSPECTION PROCEDURES <br />EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE PRACTICES <br />F <br />ALL MEASURES STATED ON THE EROSION AND SEDIMENT CONTROL PLAN, AND IN <br />THE STORM WATER POLLUTION PREVENTION PLAN, SHALL BE MAINTAINED IN <br />FULLY FUNCTIONAL CONDITION UNTIL NO LONGER REQUIRED FOR A COMPLETED <br />PHASE OF WORK OR FINAL STABILIZATION OF THE SITE. <br />1. ALL CONTROL MEASURES SHALL BE INSPECTED BY A QUALIFIED PERSON AT <br />LEAST ONCE EVERY SEVEN (7) DAYS AND WITHIN 24 HOURS OF ANY <br />RAINFALL EXCEEDING 0.5 INCHES AND CLEANED AND REPAIRED IN <br />ACCORDANCE WITH THE FOLLOWING% <br />2. ALL MEASURES WILL BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR <br />IS NECESSARY, IT WILL BE INITIATED WITHIN 24 HOURS OF ITS REPORTING. <br />E 3. ALL DRAINAGE STRUCTURES WILL BE INSPECTED FOR DEPTH OF SEDIMENTS. <br />SEDIMENTS WILL BE REMOVED WHEN DESIGN CAPACITY HAS BEEN REDUCED. <br />4. PERMANENT SODDING WILL BE INSPECTED FOR BARE SPOTS, WASHOUTS, AND <br />HEALTHY GROWTH. ANY DEFICIENCIES SHALL BE CORRECTED. <br />5. INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR <br />REPLACED IF THEY SHOW SIGNS OF UNDERMINING, OR DETERIORATION. <br />6. THE CONSTRUCTION ENTRANCES SHALL BE MAINTAINED IN A CONDITION <br />WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC <br />RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE <br />CONSTRUCTION ENTRANCES AS CONDITIONS DEMAND. <br />7. <br />THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN GOOD <br />CONDITION (SUITABLE FOR PARKING AND STORAGE). THIS MAY REQUIRE <br />o0 <br />PERIODIC TOP DRESSING OF THE TEMPORARY PARKING AS CONDITIONS <br />DEMAND. <br />Lo <br />o D <br />8. <br />SILT FENCES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITION IF <br />DAMAGED. THE SILT SCREEN SHALL BE INSPECTED IMMEDIATELY AFTER EACH <br />0, <br />RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. WHERE <br />DEFICIENCIES EXIST, ADDITIONAL SILT FENCES SHALL BE INSTALLED OR <br />REPLACED. SEDIMENT WILL BE REMOVED FROM THE UPSTREAM SIDE OF <br />ANY SILT SCREEN ONCE THE ACCUMULATED SEDIMENT REACHES 1 /3 THE <br />c� <br />HEIGHT OF THE SILT SCREEN. ANY SEDIMENT DEPOSITS OR SOIL <br />o <br />DISTURBANCE CREATED DURING THE INSTALLATION AND REMOVAL OF SILT <br />o <br />SCREEN SHALL BE DRESSED TO CONFORM TO THE FINISHED GRADE. <br />a <br />A MAINTENANCE INSPECTION REPORT WILL BE MADE AFTER EACH INSPECTION. <br />o <br />THESE INSPECTION REPORTS WILL BE KEPT AS A PART OF THE STORMWATER <br />POLLUTION PREVENTION PLAN FOR AT LEAST THREE (3) YEARS FROM THE <br />DATE THE SITE IS FINALLY STABILIZED. A COPY OF THE INSPECTION <br />REPORT FORM IS PROVIDED <br />5 <br />INVENTORY OF BUILDING MATERIALS EXPECTED TO BE PRESENT ONSITE <br />o� <br />1. <br />MATERIALS PRESENT ONSITE DURING CONSTRUCTION WILL INCLUDE THOSE <br />C <br />NORMALLY ASSOCIATED WITH THIS TYPE OF CONSTRUCTION: <br />0 <br />I <br />CONCRETE, STEEL REINFORCING BARS AND RELATED MATERIALS, LUMBER, <br />N <br />PAINTS, PETROLEUM BASED PRODUCTS. <br />0 <br />MATERIAL MANAGEMENT (POLLUTION PREVENTION) PRACTICES <br />U <br />w <br />o <br />THE <br />FOLLOWING MATERIAL MANAGEMENT PRACTICES WILL BE USED TO REDUCE <br />a <br />THE RISK OF SPILLS OR OTHER ACCIDENTAL EXPOSURE OF MATERIALS ANE <br />SUBSTANCES TO STORMWATER RUNOFF: <br />J <br />J <br />y <br />GENERAL PRACTICES <br />w <br />THE FOLLOWING GENERAL PRACTICES WILL BE FOLLOWED ONSITE DURING THE <br />Iv <br />CONSTRUCTION PROJECT: <br />0 <br />1. <br />SUFFICIENT PRECAUTIONS SHOULD BE TAKEN TO PREVENT POLLUTION OF <br />WATER BODIES DIRECTLY OR INDIRECTLY WITH FUELS, OILS, BITUMENS, <br />CALCIUM CHLORIDE, OR OTHER HARMFUL MATERIALS <br />0 <br />`- E3 <br />r- <br />2. <br />AN EFFORT WILL BE MADE TO STORE ONLY ENOUGH PRODUCTS REQUIRED <br />N <br />FOR THIS PROJECT. <br />i <br />3. <br />ALL MATERIALS STORED ONSITE WILL BE STORED IN A NEAT, ORDERLY <br />w <br />MANNER IN THEIR APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER A <br />ROOF OR OTHER ENCLOSURE. <br />4. <br />PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE ORIGINAL <br />MANUFACTURER'S LABEL. <br />o_ <br />5. <br />SUBSTANCES WILL NOT BE MIXED WITH ONE ANOTHER UNLESS <br />to <br />RECOMMENDED BY THE MANUFACTURER. <br />rn <br />0 <br />A <br />DESIGNED AHOLMES <br />Go <br />DRAWN &RAMER <br />CHECKED TFRIEDRICH <br />VTR. <br />DATE <br />RDASK s <br />BY <br />APPRD <br />6. WHENEVER POSSIBLE, ALL OF A PRODUCT WILL BE USED BEFORE DISPOSING <br />OF THE CONTAINER. <br />7. MANUFACTURERS' RECOMMENDATIONS FOR PROPER USE AND DISPOSAL WILL <br />BE FOLLOWED. <br />8. THE SITE WILL BE INSPECTED DAILY TO ENSURE PROPER USE AND DISPOSAL <br />OF MATERIALS. <br />HAZARDOUS PRODUCTS <br />THE FOLLOWING PRACTICES WILL BE UTILIZED TO REDUCE THE RISKS ASSOCIATED <br />WITH HAZARDOUS MATERIALS: <br />1. PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS UNLESS THEY ARE <br />NOT RESEALABLE. <br />2. ORIGINAL LABELS AND MATERIAL SAFETY DATA WILL BE RETAINED; THEY <br />CONTAIN IMPORTANT PRODUCT INFORMATION. <br />3. IF SURPLUS PRODUCT MUST BE DISPOSED OF, MANUFACTURERS' OR LOCAL <br />AND STATE RECOMMENDED METHODS FOR PROPER DISPOSAL WILL BE <br />FOLLOWED. <br />PRODUCT SPECIFIC PRACTICES <br />THE FOLLOWING PRODUCT SPECIFIC PRACTICES WILL BE FOLLOWED ONSITE: <br />1. PETROLEUM PRODUCTS - ALL ONSITE VEHICLES WILL BE MONITORED FOR <br />LEAKS AND RECEIVE REGULAR PREVENTIVE MAINTENANCE TO REDUCE THE <br />CHANCE OF LEAKAGE. PETROLEUM PRODUCTS WILL BE STORED IN TIGHTLY <br />SEALED CONTAINERS THAT ARE CLEARLY LABELED. ANY ASPHALT <br />SUBSTANCES USED ONSITE WILL BE APPLIED ACCORDING TO THE <br />MANUFACTURER'S RECOMMENDATIONS. <br />2. PAINTS - ALL CONTAINERS WILL BE TIGHTLY SEALED AND STORED WHEN <br />NOT IN USE. EXCESS PAINT WILL NOT BE DISCHARGED TO THE STORM <br />SEWER, POND SYSTEM, OR RECEIVING WATER BUT WILL BE PROPERLY <br />DISPOSED OF ACCORDING TO MANUFACTURERS' INSTRUCTIONS OR STATE AND <br />LOCAL REGULATIONS. <br />SPILL PREVENTION AND CLEANUP <br />IN ADDITION TO THE MATERIALS MANAGEMENT PRACTICES DISCUSSED IN THE <br />PREVIOUS SECTIONS OF THIS PLAN, THE FOLLOWING PRACTICES WILL BE <br />FOLLOWED FOR SPILL PREVENTION AND CLEANUP: <br />1. MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEANUP WILL BE <br />CLEARLY POSTED AND SITE PERSONNEL WILL BE MADE AWARE OF THE <br />PROCEDURES AND THE LOCATIONS OF THE INFORMATION AND CLEANUP <br />SUPPLIES. <br />2. MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT <br />IN THE MATERIAL STORAGE AREA THAT IS ONSITE. EQUIPMENT AND <br />MATERIALS WILL INCLUDE BROOMS, DUST PANS, GLOVES AND PLASTIC AND <br />METAL TRASH CONTAINERS, ETC. SPECIFICALLY FOR THIS PURPOSE. <br />3. ALL SPILLS WILL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY. <br />4. THE SPILL AREA WILL BE KEPT WELL VENTILATED AND PERSONNEL WILL <br />WEAR APPROPRIATE PROTECTIVE CLOTHING TO PREVENT INJURY FROM <br />CONTACT WITH A HAZARDOUS SUBSTANCE. <br />5. SPILLS OF TOXIC OR HAZARDOUS MATERIAL WILL BE REPORTED TO THE <br />APPROPRIATE STATE OR LOCAL GOVERNMENT AGENCY, REGARDLESS OF THE <br />SIZE. <br />6. THE SPILL PREVENTION PLANS WILL BE ADJUSTED TO INCLUDE MEASURES TO <br />PREVENT THIS TYPE OF SPILL FROM REOCCURRING AND HOW TO CLEAN UP <br />THIS TYPE OF SPILL IF THERE IS ANOTHER ONE. A DESCRIPTION OF THE <br />SPILL, ITS CAUSE, AND THE CLEANUP MEASURES WILL ALSO BE INCLUDED. <br />7. THE CONTRACTOR SHALL REPORT ANY SPILL TO THE WRF LEAD OPERATOR, <br />PUBLIC WORKS AND FDEP (IF APPLICABLE). <br />CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE <br />AND LOCAL REGULATIONS <br />THE ONSITE PRACTICES SHALL COMPLY WITH THIS STORMWATER POLLUTION <br />PREVENTION PLAN AS WELL AS REFLECT THE REQUIREMENTS OF THE: <br />1. FDEP'S NPDES GENERIC PERMIT FOR CONSTRUCTION ACTIVITIES, <br />62-621.300(4), F.A.C.) <br />2. ALL STATE REQUIREMENTS OF STORMWATER MANAGEMENT SYSTEMS UNDER <br />CHAPTERS 4OD-4, 4OD-40 AND 4OD-400 OF THE FLORIDA ADMINISTRATIVE <br />CODE, AS ADMINISTERED BY THE SOUTHWEST FLORIDA WATER MANAGEMENT <br />DISTRICT IN ADDITION 33 CFR ADMINISTERED BY THE ARMY CORP OF <br />ENGINEERS. <br />ion,. m <br />un& <br />CERTIFICATE OF AUTHORIZATION *1841 <br />730 NE WALDO ROAD, GAINESVILLE, FLORIDA 32641 / (352) 377- 5821 <br />324 S HYDE PARK AVE, SUITE 2S0, TAMPA, FLORIDA 33606 / (813) 2S8- 0703 <br />EROSION AND SEDIMENT CONTROL NOTES: <br />1. <br />THE STORM WATER POLLUTION PREVENTION PLAN ("SWPPP") IS <br />COMPRISED OF THE EROSION AND SEDIMENT CONTROL PLAN. THE <br />20. <br />ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH WORKING <br />F <br />STANDARD DETAILS, THE PLAN NARRATIVE, ATTACHMENTS INCLUDED IN <br />DAY, THIS INCLUDES BACK FILLING OF TRENCHES FOR UTILITY <br />SPECIFICATIONS OF THE SWPPP, PLUS THE PERMIT AND ALL SUBSEQUENT <br />CONSTRUCTION AND PLACEMENT OF GRAVEL OR BITUMINOUS PAVING FOR <br />REPORTS AND RELATED DOCUMENTS. <br />ROAD CONSTRUCTION. <br />2. <br />ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM WATER <br />21. <br />EROSION/SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMP) IN <br />POLLUTION PREVENTION SHALL OBTAIN A COPY OF THE STORM WATER ADDITION TO THOSE PRESENTED ON THE PLANS SHALL BE IMPLEMENTED <br />POLLUTION PREVENTION PLAN AND THE STATE OF FLORIDA NATIONAL <br />AS NECESSARY TO PREVENT TURBID DISCHARGES FROM FLOWING ONTO <br />POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT (NPDES <br />ADJACENT PROPERTY OR ROADWAYS. CONTROLS SHALL BE DESIGNED, <br />PERMIT) AND BECOME FAMILIAR WITH THEIR CONTENTS. <br />INSTALLED AND MAINTAINED AS REQUIRED BY THE ENGINEER AND/OR <br />CONTRACTOR TO ENSURE SURFACE WATER QUALITY CONDITIONS ARE IN <br />3. <br />THE CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS <br />COMPLIANCE WITH THE WATER QUALITY STANDARDS. <br />REQUIRED BY THE SWPPP. ADDITIONAL BEST MANAGEMENT PRACTICES <br />SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL <br />22. <br />THE CONTRACTOR SHALL REPORT ALL OFFSITE SURFACE WATER <br />COSTS TO THE OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION. <br />DISCHARGES WITH TURBIDITY IN EXCESS OF 29 NTUS (NEPHELOMETRIC <br />TURBIDITY UNITS) ABOVE BACKGROUND LEVEL WITHIN 24 HOURS AFTER <br />E <br />4. <br />BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM <br />OCCURRENCE. NOTIFICATION SHALL INCLUDE CAUSE OF THE PROBLEM, <br />TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, <br />CORRECTIVE ACTIONS TAKEN AND INSTALLATION OF ADDITIONAL <br />AS APPLICABLE. THE CONTRACTOR SHALL IMPLEMENT ADDITIONAL <br />EROSION/SEDIMENT CONTROLS NOT SHOWN ON THE APPROVED <br />CONTROLS AS DIRECTED BY THE PERMITTING AGENCY OR OWNER. <br />CONSTRUCTION DRAWINGS. <br />5. <br />EROSION CONTROL PLAN MUST CLEARLY DELINEATE ALL STATE WATERS. <br />23. <br />THE CONTRACTOR SHALL ENSURE THAT ADJACENT PROPERTIES ARE NOT <br />PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR <br />IMPACTED BY WIND EROSION OR EMISSIONS OF UNCONFINED PARTICULATE <br />REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT ALL TIMES. <br />MATTER IN ACCORDANCE WITH RULE 62-296.320(4)(C)1., FLORIDA <br />ADMINISTRATIVE CODE, FROM THE CONSTRUCTION SITE BY TAKING <br />6. <br />THE CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT <br />ADEQUATE MEASURES TO STABILIZE AFFECTED AREAS. <br />PRACTICAL OR AS REQUIRED BY THE GENERAL PERMIT. <br />24. <br />FUEL AND OTHER PETROLEUM PRODUCT SPILLS SHALL BE CONTAINED, <br />7. <br />CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND <br />CLEANED UP AND REPORTED IMMEDIATELY. <br />STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT <br />MAINTENANCE AND CLEANING AREA, EMPLOYEE PARKING AREA, AND AREA <br />PAVING, GRADING & DRAINAGE NOTES: <br />FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET <br />FACILITIES. <br />1. <br />ALL PAVING, CONSTRUCTION, MATERIALS, AND WORKMANSHIP WITHIN <br />COUNTY'S RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH LOCAL OR <br />8. <br />ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT <br />COUNTY SPECIFICATIONS AND STANDARDS (LATEST EDITION) OF FDOT <br />D <br />CLEANING, ETC.) SHALL BE CONTAINED AND PROPERLY TREATED OR <br />SPECIFICATIONS AND STANDARDS (LATEST EDITION) IF NOT COVERED BY <br />DISPOSED. <br />LOCAL OR COUNTY REGULATIONS. <br />9. <br />SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOATATION <br />2. <br />ALL UNPAVED AREAS UNLESS OTHERWISE INDICATED IN PLANS DISTURBED <br />BOOMS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN <br />BY CONSTRUCTION SHALL BE REGRADED AND SODDED. <br />AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS. <br />3. <br />TRAFFIC CONTROL ON ALL FDOT, LOCAL AND COUNTY RIGHTS -OF -WAY <br />10. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL ON SITE. <br />SHALL MEET THE REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC <br />THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC <br />CONTROL DEVICES (U.S. DOT/FHA) AND THE REQUIREMENTS OF THE STATE <br />LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED. <br />AND ANY LOCAL AGENCY HAVING JURISDICTION. IN THE EVENT THAT THAT <br />CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTSTER, <br />11. <br />RUBBISH, TRASH, GARBAGE, LAOR OTHER SUCH MATERIALS SHALL BE <br />ARE NOT IN AGREEMENT. THE MOST STRINGENT SHALL GOVERN. <br />DEPOSITED INTO SEALED CONTAINERS. MATERIALS SHALL BE PREVENTED <br />FROM LEAVING THE PREMISES THROUGH THE ACTION OF WIND OR STORM <br />4. <br />THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED <br />WATER DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE. <br />AND SHALL REGRADE WASHOUTS WHERE THEY OCCUR AFTER EVERY <br />RAINFALL UNTIL VEGETATION IS WELL ESTABLISHED OR ADEQUATESTABILIZATION <br />12. <br />ALL STORM WATER POLLUTION PREVENTION MEASURES PRESENTED ON THE <br />OCCURS. <br />PLAN, SHALL BE INITIATED AS SOON AS PRACTICABLE. <br />5. <br />SOD, WHERE CALLED FOR IN THE PLANS, MUST BE INSTALLED AND <br />CMAINTAINED <br />13. <br />STABILIZATION PRACTICES SHOULD BE INITIATED AS SOON AS PRACTICAL, <br />ON EXPOSED SLOPES WITHIN 48 HOURS OF COMPLETING FINAL <br />BUT IN NO CASE MORE THAN 3 DAYS WHERE CONSTRUCTION HAS <br />GRADING, AND AT ANY OTHER TIME AS NECESSARY, TO PREVENT EROSION, <br />TEMPORARILY CEASED. <br />SEDIMENTATION OR TURBID DISCHARGES. <br />14. <br />IF THE ACTION OF VEHICLES TRAVELING OVER THE GRAVEL CONSTRUCTION <br />ENTRANCES IS NOT SUFFICIENT TO REMOVE THE MAJORITY OF DIRT OR <br />MUD, THEN THE TIRES MUST BE WASHED BEFORE THE VEHICLES ENTER A <br />PUBLIC ROAD. IF WASHING IS USED, PROVISIONS MUST BE MADE TO <br />INTERCEPT THE WASH WATER AND TRAP THE SEDIMENT BEFORE IT IS <br />CARRIED OFF THE SIGHT. <br />15. <br />ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES <br />z <br />O <br />ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED AS SOON <br />AS POSSIBLE. <br />F- <br />V <br />16. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING SEDIMENT IN <br />THE DETENTION POND AND ANY SEDIMENT THAT MAY HAVE COLLECTED IN <br />F- <br />THE STORM SEWER DRAINAGE SYSTEMS IN CONJUNCTION WITH THE <br />co) <br />STABILIZATION OF THE SITE. <br />0 <br />E3 <br />17. <br />ON -SITE AND OFF SITE SOIL STOCKPILE AND BORROW AREAS SHALL BE <br />PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION <br />0 <br />OF BEST MANAGEMENT PRACTICES. STOCKPILE AND BORROW AREA <br />IL <br />LOCATIONS SHALL BE NOTED ON THE EROSION CONTROL PLAN AND <br />PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS. <br />18. <br />SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE <br />GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION. <br />19. <br />DUE TO GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION <br />CONTROL MEASURES (SILT FENCES, ETC.) TO PREVENT EROSION. <br />WASTEWATER TREATMENT FACILITY <br />ADVANCED WATER TREATMENT UPGRADE <br />CITY OF ZEPHYRHILLS, FLORIDA <br />APPROVED 81( PROJECT W. DATE A <br />STORMWATER POLLUTION 26110-025-01 MARCH 2O20 <br />PREVENTION PLAN 1NDD� W. DWG NO: <br />DOUGLAS R. YOUNG P.E. #44204 C8 <br />