<br />MAINTENANCE/INSPECTION PROCEDURES
<br />EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE PRACTICES
<br />F
<br />ALL MEASURES STATED ON THE EROSION AND SEDIMENT CONTROL PLAN, AND IN
<br />THE STORM WATER POLLUTION PREVENTION PLAN, SHALL BE MAINTAINED IN
<br />FULLY FUNCTIONAL CONDITION UNTIL NO LONGER REQUIRED FOR A COMPLETED
<br />PHASE OF WORK OR FINAL STABILIZATION OF THE SITE.
<br />1. ALL CONTROL MEASURES SHALL BE INSPECTED BY A QUALIFIED PERSON AT
<br />LEAST ONCE EVERY SEVEN (7) DAYS AND WITHIN 24 HOURS OF ANY
<br />RAINFALL EXCEEDING 0.5 INCHES AND CLEANED AND REPAIRED IN
<br />ACCORDANCE WITH THE FOLLOWING%
<br />2. ALL MEASURES WILL BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR
<br />IS NECESSARY, IT WILL BE INITIATED WITHIN 24 HOURS OF ITS REPORTING.
<br />E 3. ALL DRAINAGE STRUCTURES WILL BE INSPECTED FOR DEPTH OF SEDIMENTS.
<br />SEDIMENTS WILL BE REMOVED WHEN DESIGN CAPACITY HAS BEEN REDUCED.
<br />4. PERMANENT SODDING WILL BE INSPECTED FOR BARE SPOTS, WASHOUTS, AND
<br />HEALTHY GROWTH. ANY DEFICIENCIES SHALL BE CORRECTED.
<br />5. INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR
<br />REPLACED IF THEY SHOW SIGNS OF UNDERMINING, OR DETERIORATION.
<br />6. THE CONSTRUCTION ENTRANCES SHALL BE MAINTAINED IN A CONDITION
<br />WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC
<br />RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE
<br />CONSTRUCTION ENTRANCES AS CONDITIONS DEMAND.
<br />7.
<br />THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN GOOD
<br />CONDITION (SUITABLE FOR PARKING AND STORAGE). THIS MAY REQUIRE
<br />o0
<br />PERIODIC TOP DRESSING OF THE TEMPORARY PARKING AS CONDITIONS
<br />DEMAND.
<br />Lo
<br />o D
<br />8.
<br />SILT FENCES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITION IF
<br />DAMAGED. THE SILT SCREEN SHALL BE INSPECTED IMMEDIATELY AFTER EACH
<br />0,
<br />RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. WHERE
<br />DEFICIENCIES EXIST, ADDITIONAL SILT FENCES SHALL BE INSTALLED OR
<br />REPLACED. SEDIMENT WILL BE REMOVED FROM THE UPSTREAM SIDE OF
<br />ANY SILT SCREEN ONCE THE ACCUMULATED SEDIMENT REACHES 1 /3 THE
<br />c�
<br />HEIGHT OF THE SILT SCREEN. ANY SEDIMENT DEPOSITS OR SOIL
<br />o
<br />DISTURBANCE CREATED DURING THE INSTALLATION AND REMOVAL OF SILT
<br />o
<br />SCREEN SHALL BE DRESSED TO CONFORM TO THE FINISHED GRADE.
<br />a
<br />A MAINTENANCE INSPECTION REPORT WILL BE MADE AFTER EACH INSPECTION.
<br />o
<br />THESE INSPECTION REPORTS WILL BE KEPT AS A PART OF THE STORMWATER
<br />POLLUTION PREVENTION PLAN FOR AT LEAST THREE (3) YEARS FROM THE
<br />DATE THE SITE IS FINALLY STABILIZED. A COPY OF THE INSPECTION
<br />REPORT FORM IS PROVIDED
<br />5
<br />INVENTORY OF BUILDING MATERIALS EXPECTED TO BE PRESENT ONSITE
<br />o�
<br />1.
<br />MATERIALS PRESENT ONSITE DURING CONSTRUCTION WILL INCLUDE THOSE
<br />C
<br />NORMALLY ASSOCIATED WITH THIS TYPE OF CONSTRUCTION:
<br />0
<br />I
<br />CONCRETE, STEEL REINFORCING BARS AND RELATED MATERIALS, LUMBER,
<br />N
<br />PAINTS, PETROLEUM BASED PRODUCTS.
<br />0
<br />MATERIAL MANAGEMENT (POLLUTION PREVENTION) PRACTICES
<br />U
<br />w
<br />o
<br />THE
<br />FOLLOWING MATERIAL MANAGEMENT PRACTICES WILL BE USED TO REDUCE
<br />a
<br />THE RISK OF SPILLS OR OTHER ACCIDENTAL EXPOSURE OF MATERIALS ANE
<br />SUBSTANCES TO STORMWATER RUNOFF:
<br />J
<br />J
<br />y
<br />GENERAL PRACTICES
<br />w
<br />THE FOLLOWING GENERAL PRACTICES WILL BE FOLLOWED ONSITE DURING THE
<br />Iv
<br />CONSTRUCTION PROJECT:
<br />0
<br />1.
<br />SUFFICIENT PRECAUTIONS SHOULD BE TAKEN TO PREVENT POLLUTION OF
<br />WATER BODIES DIRECTLY OR INDIRECTLY WITH FUELS, OILS, BITUMENS,
<br />CALCIUM CHLORIDE, OR OTHER HARMFUL MATERIALS
<br />0
<br />`- E3
<br />r-
<br />2.
<br />AN EFFORT WILL BE MADE TO STORE ONLY ENOUGH PRODUCTS REQUIRED
<br />N
<br />FOR THIS PROJECT.
<br />i
<br />3.
<br />ALL MATERIALS STORED ONSITE WILL BE STORED IN A NEAT, ORDERLY
<br />w
<br />MANNER IN THEIR APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER A
<br />ROOF OR OTHER ENCLOSURE.
<br />4.
<br />PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE ORIGINAL
<br />MANUFACTURER'S LABEL.
<br />o_
<br />5.
<br />SUBSTANCES WILL NOT BE MIXED WITH ONE ANOTHER UNLESS
<br />to
<br />RECOMMENDED BY THE MANUFACTURER.
<br />rn
<br />0
<br />A
<br />DESIGNED AHOLMES
<br />Go
<br />DRAWN &RAMER
<br />CHECKED TFRIEDRICH
<br />VTR.
<br />DATE
<br />RDASK s
<br />BY
<br />APPRD
<br />6. WHENEVER POSSIBLE, ALL OF A PRODUCT WILL BE USED BEFORE DISPOSING
<br />OF THE CONTAINER.
<br />7. MANUFACTURERS' RECOMMENDATIONS FOR PROPER USE AND DISPOSAL WILL
<br />BE FOLLOWED.
<br />8. THE SITE WILL BE INSPECTED DAILY TO ENSURE PROPER USE AND DISPOSAL
<br />OF MATERIALS.
<br />HAZARDOUS PRODUCTS
<br />THE FOLLOWING PRACTICES WILL BE UTILIZED TO REDUCE THE RISKS ASSOCIATED
<br />WITH HAZARDOUS MATERIALS:
<br />1. PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS UNLESS THEY ARE
<br />NOT RESEALABLE.
<br />2. ORIGINAL LABELS AND MATERIAL SAFETY DATA WILL BE RETAINED; THEY
<br />CONTAIN IMPORTANT PRODUCT INFORMATION.
<br />3. IF SURPLUS PRODUCT MUST BE DISPOSED OF, MANUFACTURERS' OR LOCAL
<br />AND STATE RECOMMENDED METHODS FOR PROPER DISPOSAL WILL BE
<br />FOLLOWED.
<br />PRODUCT SPECIFIC PRACTICES
<br />THE FOLLOWING PRODUCT SPECIFIC PRACTICES WILL BE FOLLOWED ONSITE:
<br />1. PETROLEUM PRODUCTS - ALL ONSITE VEHICLES WILL BE MONITORED FOR
<br />LEAKS AND RECEIVE REGULAR PREVENTIVE MAINTENANCE TO REDUCE THE
<br />CHANCE OF LEAKAGE. PETROLEUM PRODUCTS WILL BE STORED IN TIGHTLY
<br />SEALED CONTAINERS THAT ARE CLEARLY LABELED. ANY ASPHALT
<br />SUBSTANCES USED ONSITE WILL BE APPLIED ACCORDING TO THE
<br />MANUFACTURER'S RECOMMENDATIONS.
<br />2. PAINTS - ALL CONTAINERS WILL BE TIGHTLY SEALED AND STORED WHEN
<br />NOT IN USE. EXCESS PAINT WILL NOT BE DISCHARGED TO THE STORM
<br />SEWER, POND SYSTEM, OR RECEIVING WATER BUT WILL BE PROPERLY
<br />DISPOSED OF ACCORDING TO MANUFACTURERS' INSTRUCTIONS OR STATE AND
<br />LOCAL REGULATIONS.
<br />SPILL PREVENTION AND CLEANUP
<br />IN ADDITION TO THE MATERIALS MANAGEMENT PRACTICES DISCUSSED IN THE
<br />PREVIOUS SECTIONS OF THIS PLAN, THE FOLLOWING PRACTICES WILL BE
<br />FOLLOWED FOR SPILL PREVENTION AND CLEANUP:
<br />1. MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEANUP WILL BE
<br />CLEARLY POSTED AND SITE PERSONNEL WILL BE MADE AWARE OF THE
<br />PROCEDURES AND THE LOCATIONS OF THE INFORMATION AND CLEANUP
<br />SUPPLIES.
<br />2. MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT
<br />IN THE MATERIAL STORAGE AREA THAT IS ONSITE. EQUIPMENT AND
<br />MATERIALS WILL INCLUDE BROOMS, DUST PANS, GLOVES AND PLASTIC AND
<br />METAL TRASH CONTAINERS, ETC. SPECIFICALLY FOR THIS PURPOSE.
<br />3. ALL SPILLS WILL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY.
<br />4. THE SPILL AREA WILL BE KEPT WELL VENTILATED AND PERSONNEL WILL
<br />WEAR APPROPRIATE PROTECTIVE CLOTHING TO PREVENT INJURY FROM
<br />CONTACT WITH A HAZARDOUS SUBSTANCE.
<br />5. SPILLS OF TOXIC OR HAZARDOUS MATERIAL WILL BE REPORTED TO THE
<br />APPROPRIATE STATE OR LOCAL GOVERNMENT AGENCY, REGARDLESS OF THE
<br />SIZE.
<br />6. THE SPILL PREVENTION PLANS WILL BE ADJUSTED TO INCLUDE MEASURES TO
<br />PREVENT THIS TYPE OF SPILL FROM REOCCURRING AND HOW TO CLEAN UP
<br />THIS TYPE OF SPILL IF THERE IS ANOTHER ONE. A DESCRIPTION OF THE
<br />SPILL, ITS CAUSE, AND THE CLEANUP MEASURES WILL ALSO BE INCLUDED.
<br />7. THE CONTRACTOR SHALL REPORT ANY SPILL TO THE WRF LEAD OPERATOR,
<br />PUBLIC WORKS AND FDEP (IF APPLICABLE).
<br />CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE
<br />AND LOCAL REGULATIONS
<br />THE ONSITE PRACTICES SHALL COMPLY WITH THIS STORMWATER POLLUTION
<br />PREVENTION PLAN AS WELL AS REFLECT THE REQUIREMENTS OF THE:
<br />1. FDEP'S NPDES GENERIC PERMIT FOR CONSTRUCTION ACTIVITIES,
<br />62-621.300(4), F.A.C.)
<br />2. ALL STATE REQUIREMENTS OF STORMWATER MANAGEMENT SYSTEMS UNDER
<br />CHAPTERS 4OD-4, 4OD-40 AND 4OD-400 OF THE FLORIDA ADMINISTRATIVE
<br />CODE, AS ADMINISTERED BY THE SOUTHWEST FLORIDA WATER MANAGEMENT
<br />DISTRICT IN ADDITION 33 CFR ADMINISTERED BY THE ARMY CORP OF
<br />ENGINEERS.
<br />ion,. m
<br />un&
<br />CERTIFICATE OF AUTHORIZATION *1841
<br />730 NE WALDO ROAD, GAINESVILLE, FLORIDA 32641 / (352) 377- 5821
<br />324 S HYDE PARK AVE, SUITE 2S0, TAMPA, FLORIDA 33606 / (813) 2S8- 0703
<br />EROSION AND SEDIMENT CONTROL NOTES:
<br />1.
<br />THE STORM WATER POLLUTION PREVENTION PLAN ("SWPPP") IS
<br />COMPRISED OF THE EROSION AND SEDIMENT CONTROL PLAN. THE
<br />20.
<br />ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH WORKING
<br />F
<br />STANDARD DETAILS, THE PLAN NARRATIVE, ATTACHMENTS INCLUDED IN
<br />DAY, THIS INCLUDES BACK FILLING OF TRENCHES FOR UTILITY
<br />SPECIFICATIONS OF THE SWPPP, PLUS THE PERMIT AND ALL SUBSEQUENT
<br />CONSTRUCTION AND PLACEMENT OF GRAVEL OR BITUMINOUS PAVING FOR
<br />REPORTS AND RELATED DOCUMENTS.
<br />ROAD CONSTRUCTION.
<br />2.
<br />ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM WATER
<br />21.
<br />EROSION/SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMP) IN
<br />POLLUTION PREVENTION SHALL OBTAIN A COPY OF THE STORM WATER ADDITION TO THOSE PRESENTED ON THE PLANS SHALL BE IMPLEMENTED
<br />POLLUTION PREVENTION PLAN AND THE STATE OF FLORIDA NATIONAL
<br />AS NECESSARY TO PREVENT TURBID DISCHARGES FROM FLOWING ONTO
<br />POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT (NPDES
<br />ADJACENT PROPERTY OR ROADWAYS. CONTROLS SHALL BE DESIGNED,
<br />PERMIT) AND BECOME FAMILIAR WITH THEIR CONTENTS.
<br />INSTALLED AND MAINTAINED AS REQUIRED BY THE ENGINEER AND/OR
<br />CONTRACTOR TO ENSURE SURFACE WATER QUALITY CONDITIONS ARE IN
<br />3.
<br />THE CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS
<br />COMPLIANCE WITH THE WATER QUALITY STANDARDS.
<br />REQUIRED BY THE SWPPP. ADDITIONAL BEST MANAGEMENT PRACTICES
<br />SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL
<br />22.
<br />THE CONTRACTOR SHALL REPORT ALL OFFSITE SURFACE WATER
<br />COSTS TO THE OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION.
<br />DISCHARGES WITH TURBIDITY IN EXCESS OF 29 NTUS (NEPHELOMETRIC
<br />TURBIDITY UNITS) ABOVE BACKGROUND LEVEL WITHIN 24 HOURS AFTER
<br />E
<br />4.
<br />BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM
<br />OCCURRENCE. NOTIFICATION SHALL INCLUDE CAUSE OF THE PROBLEM,
<br />TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE,
<br />CORRECTIVE ACTIONS TAKEN AND INSTALLATION OF ADDITIONAL
<br />AS APPLICABLE. THE CONTRACTOR SHALL IMPLEMENT ADDITIONAL
<br />EROSION/SEDIMENT CONTROLS NOT SHOWN ON THE APPROVED
<br />CONTROLS AS DIRECTED BY THE PERMITTING AGENCY OR OWNER.
<br />CONSTRUCTION DRAWINGS.
<br />5.
<br />EROSION CONTROL PLAN MUST CLEARLY DELINEATE ALL STATE WATERS.
<br />23.
<br />THE CONTRACTOR SHALL ENSURE THAT ADJACENT PROPERTIES ARE NOT
<br />PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR
<br />IMPACTED BY WIND EROSION OR EMISSIONS OF UNCONFINED PARTICULATE
<br />REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT ALL TIMES.
<br />MATTER IN ACCORDANCE WITH RULE 62-296.320(4)(C)1., FLORIDA
<br />ADMINISTRATIVE CODE, FROM THE CONSTRUCTION SITE BY TAKING
<br />6.
<br />THE CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT
<br />ADEQUATE MEASURES TO STABILIZE AFFECTED AREAS.
<br />PRACTICAL OR AS REQUIRED BY THE GENERAL PERMIT.
<br />24.
<br />FUEL AND OTHER PETROLEUM PRODUCT SPILLS SHALL BE CONTAINED,
<br />7.
<br />CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND
<br />CLEANED UP AND REPORTED IMMEDIATELY.
<br />STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT
<br />MAINTENANCE AND CLEANING AREA, EMPLOYEE PARKING AREA, AND AREA
<br />PAVING, GRADING & DRAINAGE NOTES:
<br />FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET
<br />FACILITIES.
<br />1.
<br />ALL PAVING, CONSTRUCTION, MATERIALS, AND WORKMANSHIP WITHIN
<br />COUNTY'S RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH LOCAL OR
<br />8.
<br />ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT
<br />COUNTY SPECIFICATIONS AND STANDARDS (LATEST EDITION) OF FDOT
<br />D
<br />CLEANING, ETC.) SHALL BE CONTAINED AND PROPERLY TREATED OR
<br />SPECIFICATIONS AND STANDARDS (LATEST EDITION) IF NOT COVERED BY
<br />DISPOSED.
<br />LOCAL OR COUNTY REGULATIONS.
<br />9.
<br />SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOATATION
<br />2.
<br />ALL UNPAVED AREAS UNLESS OTHERWISE INDICATED IN PLANS DISTURBED
<br />BOOMS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN
<br />BY CONSTRUCTION SHALL BE REGRADED AND SODDED.
<br />AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS.
<br />3.
<br />TRAFFIC CONTROL ON ALL FDOT, LOCAL AND COUNTY RIGHTS -OF -WAY
<br />10.
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL ON SITE.
<br />SHALL MEET THE REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC
<br />THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC
<br />CONTROL DEVICES (U.S. DOT/FHA) AND THE REQUIREMENTS OF THE STATE
<br />LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED.
<br />AND ANY LOCAL AGENCY HAVING JURISDICTION. IN THE EVENT THAT THAT
<br />CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTSTER,
<br />11.
<br />RUBBISH, TRASH, GARBAGE, LAOR OTHER SUCH MATERIALS SHALL BE
<br />ARE NOT IN AGREEMENT. THE MOST STRINGENT SHALL GOVERN.
<br />DEPOSITED INTO SEALED CONTAINERS. MATERIALS SHALL BE PREVENTED
<br />FROM LEAVING THE PREMISES THROUGH THE ACTION OF WIND OR STORM
<br />4.
<br />THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED
<br />WATER DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE.
<br />AND SHALL REGRADE WASHOUTS WHERE THEY OCCUR AFTER EVERY
<br />RAINFALL UNTIL VEGETATION IS WELL ESTABLISHED OR ADEQUATESTABILIZATION
<br />12.
<br />ALL STORM WATER POLLUTION PREVENTION MEASURES PRESENTED ON THE
<br />OCCURS.
<br />PLAN, SHALL BE INITIATED AS SOON AS PRACTICABLE.
<br />5.
<br />SOD, WHERE CALLED FOR IN THE PLANS, MUST BE INSTALLED AND
<br />CMAINTAINED
<br />13.
<br />STABILIZATION PRACTICES SHOULD BE INITIATED AS SOON AS PRACTICAL,
<br />ON EXPOSED SLOPES WITHIN 48 HOURS OF COMPLETING FINAL
<br />BUT IN NO CASE MORE THAN 3 DAYS WHERE CONSTRUCTION HAS
<br />GRADING, AND AT ANY OTHER TIME AS NECESSARY, TO PREVENT EROSION,
<br />TEMPORARILY CEASED.
<br />SEDIMENTATION OR TURBID DISCHARGES.
<br />14.
<br />IF THE ACTION OF VEHICLES TRAVELING OVER THE GRAVEL CONSTRUCTION
<br />ENTRANCES IS NOT SUFFICIENT TO REMOVE THE MAJORITY OF DIRT OR
<br />MUD, THEN THE TIRES MUST BE WASHED BEFORE THE VEHICLES ENTER A
<br />PUBLIC ROAD. IF WASHING IS USED, PROVISIONS MUST BE MADE TO
<br />INTERCEPT THE WASH WATER AND TRAP THE SEDIMENT BEFORE IT IS
<br />CARRIED OFF THE SIGHT.
<br />15.
<br />ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES
<br />z
<br />O
<br />ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED AS SOON
<br />AS POSSIBLE.
<br />F-
<br />V
<br />16.
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING SEDIMENT IN
<br />THE DETENTION POND AND ANY SEDIMENT THAT MAY HAVE COLLECTED IN
<br />F-
<br />THE STORM SEWER DRAINAGE SYSTEMS IN CONJUNCTION WITH THE
<br />co)
<br />STABILIZATION OF THE SITE.
<br />0
<br />E3
<br />17.
<br />ON -SITE AND OFF SITE SOIL STOCKPILE AND BORROW AREAS SHALL BE
<br />PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION
<br />0
<br />OF BEST MANAGEMENT PRACTICES. STOCKPILE AND BORROW AREA
<br />IL
<br />LOCATIONS SHALL BE NOTED ON THE EROSION CONTROL PLAN AND
<br />PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS.
<br />18.
<br />SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE
<br />GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION.
<br />19.
<br />DUE TO GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT,
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION
<br />CONTROL MEASURES (SILT FENCES, ETC.) TO PREVENT EROSION.
<br />WASTEWATER TREATMENT FACILITY
<br />ADVANCED WATER TREATMENT UPGRADE
<br />CITY OF ZEPHYRHILLS, FLORIDA
<br />APPROVED 81( PROJECT W. DATE A
<br />STORMWATER POLLUTION 26110-025-01 MARCH 2O20
<br />PREVENTION PLAN 1NDD� W. DWG NO:
<br />DOUGLAS R. YOUNG P.E. #44204 C8