Laserfiche WebLink
ARCHITECTURAL SPECIFICATIONS <br />SECTION 08410 <br />METAL -FRAMED STOREFRONTS <br />PRODUCTS <br />MATERIALS - STOREFRONT AND DOORS <br />A. ALUMINUM STOREFRONT FRAMING MEMBERS, DOOR FRAMES AND <br />GLASS FRAMING MEMBERS SHALL BE EXTRUDED ALUMINUM SECTIONS <br />PREPARED FOR FLUSH GLAZING ON ALL SIDES WITH THROUGH SIGHT <br />LINES AND NO PROJECTING STOPS. DOOR FRAMING MEMBERS SHALL <br />BE COMPATIBLE WITH GLASS FRAMING IN APPEARANCE, EXCEPT <br />JAMBS, HEADERS OR TRANSOM BAR AT SINGLE ACTING DOORS SHALL <br />HAVE BLADE DOOR STOP AND SILL MEMBER OF TRANSOM AT DOOR <br />HEAD MAY HAVE SURFACE APPLIED GLASS STOPS. <br />1. STOREFRONT FRAMING MEMBERS AND DOOR FRAMES SHALL BE <br />1-3/4" x 4-1/2" AND 4-1/2" x 4-1/2". <br />2. STOREFRONT SHALL BE DESIGNED FOR RESILIENT GLAZING. <br />FURNISH <br />NEOPRENE GLAZING STRIPS, GLASS SHIFT ARRESTORS AND ALL <br />RELATED INSTALLATION AND GLAZING ACCESSORIES. <br />A. GLAZING STRIPS SHALL BE 6" LONGER AT EACH END THAN <br />ALUMINUM STOP. <br />B. ALUMINUM DOORS SHALL BE MEDIUM STILE DESIGN, WITH EXTRUDED <br />ALUMINUM STILES AND RAILS. MAJOR PORTION OF DOOR STILES AND <br />RAILS SHALL BE. 125 INCHES IN THICKNESS, GLAZING MOLDINGS <br />SHALL BE .050 INCHES THICK. BOTTOM RAIL SHALL BE 10" HIGH. <br />1. ALUMINUM DOORS SHALL BE 1-3/4" THICK. <br />2. ALL DOORS, EXCEPT INTERIOR VESTIBULE DOORS, SHALL BE <br />WEATHER-STRIPPED ON 3 SIDES (JAMBS, HEAD AND MEETING STILES) <br />WITH DOOR MANUFACTURERS STANDARD WEATHER-STRIPPING. <br />3. GLAZING MOLDINGS SHALL BE SNAP -IN TYPE WITH NEOPRENE <br />GLAZING STRIPS. <br />4. BOTTOM DOOR CLEARANCE SHALL BE AS REQUIRED FOR STANDARD <br />1/2" THRESHOLD INCLUDING ALL DOORS WHERE THRESHOLD IS NOT <br />REQUIRED. <br />C. ALL SCREWS, MISCELLANEOUS FASTENING DEVICES AND INTERNAL <br />COMPONENTS SHALL BE STAINLESS STEEL, PLATED OR CORROSION - <br />RESISTANT MATERIALS. <br />D. MASTIC SHALL BE AS RECOMMENDED BY STOREFRONT SYSTEM <br />MANUFACTURER. <br />MATERIALS - HARDWARE <br />A. HARDWARE FOR DOORS IN THIS SECTION SHALL BE FURNISHED AND <br />INSTALLED BY THIS CONTRACTOR EXCEPT AS NOTED. <br />B. HARDWARE FOR ALUMINUM DOORS SHALL BE AS SCHEDULED BELOW <br />IN PARAGRAPHS "C" THROUGH "Q" OF THIS SECTION. <br />1. LOCK CYLINDERS SHALL BE PROVIDED IN FINISH HARDWARE <br />SECTION. <br />C. PUSH BARS PULL HANDLES <br />KAWNEER STYLE "L" KAWNEER STYLE "L" <br />PPG STANDARD PPG STANDARD <br />VISTAWALL STANDARD VISTAWALL STANDARD <br />D. OFFSET PIVOTS: TOP PIVOT DOROMATIC #280AC BOTTOM PIVOT <br />DOROMATIC #01175 <br />E. BUMPER ASSEMBLY: KAWNEER #37-485. (TWO SETS PER DOOR LEAF <br />INSTALLED AS INDICATED ON DRAWINGS.) <br />1. ALTERNATES: US ALUMINUM #KM-250, VISTAWALL #B-11 <br />OR AMARLITE #70448. <br />F. PREPARE ALUMINUM DOORS TO RECEIVE BEST CYLINDER AS SPECIFIED IN <br />SECTION 08710. <br />G. CYLINDER GUARD FOR OUTSIDE CYLINDER: ADAMS RITE MS 4043 US26D. <br />H. INTERIOR MORTISE CYLINDER US26D: (SEE "F" ABOVE). <br />1. WHERE INTERIOR MORTISE CYLINDER IS NOT PERMITTED BY LOCAL <br />BUILDING CODE, PROVIDE THUMB TURN IN LIEU OF CYLINDER. <br />I. THUMB TURN: ADAMS RITE TT4066 US28 AT INSIDE OF EXTERIOR <br />ALUMINUM DOORS. <br />J. DEADLOCK: ADAMS RITE MS1851AW US28. <br />K. ARMORED STRIKE: ADAMS RITE MS4002-111 US28. <br />L. EXTENSION FLUSH BOLTS: ASA STANDARD <br />IVES C457PA28 <br />CORBIN 8491/4 US28 <br />1. WHERE FLUSH BOLTS ARE NOT PERMITTED ON INACTIVE DOOR BY <br />LOCAL CODE, OMIT DEADLOCK AND FLUSH BOLT AND FURNISH <br />THREE POINT DEADLOCK (SEE 2.2, M. BELOW) <br />M. THREE POINT DEADLOCK: ADAMS RITE MS1851AW x 4015-18-4085 <br />US28. <br />N. CLOSER: LCN 4111 CUSH 9011 X AL X HAND X 18 PLATE, LCN 4011 H 901. <br />1. OPERATING PRESSURE SHALL BE A MAXIMUM OF 5 POUNDS <br />PRESSURE FOR INTERIOR DOORS AND 8.5# PRESSURE FOR <br />EXTERIOR DOORS. <br />0. WEATHERSTRIPPING: NATIONAL GUARD, PEMKO, REESE. <br />P. THRESHOLD AND HOLDER: REESE S247A x 234A x S247A x 270. <br />Q. EXIT DEVICES: <br />#1 DOROMATIC 1690 X ALUMINUM (CONCEALED VERTICAL ROD) <br />#2 DOROMATIC 1790 X ALUMINUM (RIM EXIT DEVICE) <br />MANUFACTURERS <br />A. STOREFRONT & DOOR FRAMING MEMBERS <br />1. KAWNEER CO. INC., "TRI-FAB VG 450" <br />2. VISTAWALL ARCH PROD., "SERIES FG 2000" <br />B. DOORS <br />1. KAWNEER COMPANY, INC., "MEDIUM STILE 350" <br />2. VISTAWALL, "MEDIUM STILE 375" <br />FABRICATION <br />A. FURNISH PRE -FORMED STEEL CHANNEL STIFFENERS AT ALL DOOR <br />JAMBS AND ELSEWHERE AS INDICATED ON DRAWINGS. <br />1. INSULATE ALL ALUMINUM IN DIRECT CONTACT WITH INCOMPATIBLE <br />MATERIALS WITH HEAVY COAT OF ZINC CHROMATE OR BITUMINOUS <br />PAINT. <br />B. ALL CUTOUTS, RECESSES, MORTISING OR MILLING OPERATIONS <br />REQUIRED FOR HARDWARE SHALL BE ACCURATELY MADE AND <br />REINFORCED WITH BACKING PLATES, TO INSURE ADEQUATE <br />STRENGTH OF CONNECTION. <br />C. ALUMINUM FRAME AND DOORS SHALL BE REINFORCED AND <br />FABRICATED TO RECEIVE PIVOTS. PIVOTS SHALL BE SCREWED TO 1/4' <br />MINIMUM STEEL BAR REINFORCING. STEEL BARS SHALL BE SCREWED <br />TO ALUMINUM FRAME AND DOORS WITH SELF-LOCKING "NYLOK" <br />SCREWS. PIVOTS SHALL BE SCREWED TO STEEL BARS WITH SELF- <br />LOCKING "NYLOK" SCREWS. <br />D. PROVIDE POSITIVE METHOD OF SEALING GASKET IN ALUMINUM FRAMES <br />TO GLASS BY INDUSTRY ACCEPTED METHOD. <br />FINISH <br />A. FINISH OF ALL ALUMINUM SHALL BE CLEAR ANODIZED CONFORMING <br />TO ALUMINUM ASSOCIATION STANDARDS AA-M12C22A31. <br />EXECUTION <br />INSTALLATION <br />A. INSTALL ALUMINUM DOORS AND FRAMING IN ACCORDANCE WITH <br />MANUFACTURER'S INSTRUCTIONS. <br />1. BOTTOM DOOR CLEARANCE SHALL BE AS REQUIRED FOR STANDARD <br />1/2" THRESHOLD INCLUDING ALL DOORS WHERE THRESHOLD IS NOT <br />REQUIRED. <br />2. SURFACE MOUNT DOOR HOLDERS TO THE VESTIBULE SIDE TOP RAIL <br />OF THE DOOR WITH THROUGH STAINLESS STEEL SEX BOLTS ON ONE <br />PAIR OF EXTERIOR AND VESTIBULE DOORS ONLY. HOLDERS SHALL <br />LOCK DOOR IN 90E POSITION. <br />B. EXCEPT WHERE UNAVOIDABLE FOR APPLICATION OF HARDWARE, DO <br />NOT USE EXPOSED FASTENERS. FOR THE APPLICATION OF HARDWARE <br />USE FASTENERS THAT MATCH THE FINISH OF MEMBER OR HARDWARE <br />BEING FASTENED. <br />C. WEATHER-STRIPPING INSTALLATION: ALIGN WITH WEATHER-STRIPPING <br />WITH INSIDE FACE OF STOREFRONT FRAME. <br />SECTION 08721 <br />AUTOMATIC DOOR OPERATORS <br />DESCRIPTION <br />A. PROVIDE ALL MATERIALS, LABOR, EQUIPMENT, SERVICE, ETC., <br />NECESSARY AND INCIDENTAL TO FURNISH ALL AUTOMATIC DOOR <br />OPERATORS SHOWN ON THE DRAWINGS AND AS SPECIFIED HEREIN. <br />B. WORK INCLUDED CONSISTS OF BUT IS NOT LIMITED TO THE FOLLOWING: <br />1. FURNISHING AND INSTALLING A COMPLETE SYSTEM OF <br />AUTOMATIC DOOR OPERATOR EQUIPMENT ON DOORS AS <br />SHOWN ON PLANS AND SPECIFIED HEREIN. <br />QUALITY ASSURANCE <br />A. THE EQUIPMENT SHALL BE BY ONE OF THE FOLLOWING APPROVED <br />MANUFACTURERS/PRODUCTS: <br />BESAM, INC. - SWINGMASTER 300 (NEW) OR 450 (RETROFIT) <br />GYRO -TECH. INC. - GT SYSTEM 300 (NEW) OR 400 (RETROFIT) <br />DOR-O-MATIC - ASTRO-SWING <br />STANLEY MAGIC -DOOR - MAGIC -SWING <br />1. REFERENCE IS MADE TO STANLEY PRODUCTS AS CRITERIA. <br />PRODUCTS <br />OPERATORS <br />A. STANLEY MAGIC -SWING "IN -HEADER" CONCEALED OPERATOR SHALL BE <br />AN ELECTRO-MECHANICAL SYSTEM, SEALED AGAINST DUST, DIRT, AND <br />CORROSION IN A CAST ALUMINUM CASE. <br />1. FINISH OF HEADER CASE SHALL MATCH STOREFRONT. <br />2. FURNISH HEADER CASE TO ALUMINUM STOREFRONT <br />SUBCONTRACTOR FOR INSTALLATION. <br />3. PIVOTS SHALL BE FURNISHED BY AUTOMATIC DOOR OPERATOR <br />MANUFACTURER. <br />B. THE OPERATOR SHALL OPEN THE DOOR WITH A 1/8 HP, DC MOTOR <br />REDUCTION GEARS, BALL SCREW ACTUATOR, FORGED STEEL RACK AND <br />PINION, OPENING TIME TO BACKCHECK (APPROXIMATELY 750) SHALL BE <br />1.25-1.6 SECONDS. THE OPERATOR SHALL STOP THE DOOR IN THE OPEN <br />POSITION BY ELECTRICALLY REDUCING THE MOTOR VOLTAGE AND <br />STALLING AGAINST AN ADJUSTABLE 900 STOP. <br />C. THE OPERATOR SHALL CLOSE THE DOOR BY SPRING ENERGY. CLOSING <br />SPEED SHALL BE CONTROLLED BY EMPLOYING THE MOTOR AS A <br />DYNAMIC BRAKE, AND CLOSING TO LATCH CHECK (APPROXIMATELY 100) <br />SHALL BE IN 3 SECONDS. CLOSING THROUGH THE LAST 100 SHALL BE IN <br />1.5 SECONDS MINIMUM. <br />D. THE OPERATOR SHALL HAVE BUILT-IN EMERGENCY RELEASE WITH <br />CONTROLLED SPRING RETURN TO THE CLOSED POSITION WITHOUT <br />MANUAL RESETTING. WHILE THE DOOR IS IN THE EMERGENCY RELEASE <br />MODE, A DISCONNECT SWITCH SHALL PREVENT POWERED OPERATION. <br />NOT MORE THAN 50 LBF AT THE LOCK STILE SHALL BE REQUIRED FOR <br />EMERGENCY USE, PER ANSI A-1 56.10-1985. <br />E. THE OPERATOR SHALL FUNCTION AS A MANUAL DOOR CLOSER IN THE <br />DIRECTION OF SWING WITH OR WITHOUT ELECTRICAL POWER. <br />1. PROVIDE ON/OFF SWITCH AT HEADER CASE, <br />F. THE FORCES AND SPEEDS OF POWER OPENING, MANUAL OPENING IN <br />BOTH DIRECTIONS OF SWING, AND SPRING CLOSING IN DIRECTIONS OF <br />SWING SHALL CONFORM TO THE REQUIREMENTS OF ANSI A-156.10- <br />LATEST ADDITION. <br />CONTROLS <br />A. CONTROLS SHALL CONSIST OF STANLEY MODEL SENTREX A3" SWING <br />DOOR SENSOR SYSTEM (RETROFIT APPLICATIONS) OR OTHER APPROVED <br />LISTED DOOR OPERATOR MANUFACTURERS. <br />RAILS <br />A. RAILS SHALL BE MINIMUM 30" HIGH X WIDTH OF DOOR AND SHALL HAVE <br />ONE INTERMEDIATE RAIL. WIRE MESH OR PLASTIC INFILL ONLY WHERE <br />REQUIRED BY CODE. <br />EXECUTION <br />INSTALLATION <br />A. THE INSTALLATION SHALL BE BY MANUFACTURER'S APPROVED INSTALLER <br />OR DISTRIBUTOR. <br />B. THE INSTALLER/DISTRIBUTOR WILL WORK WITH THE GENERAL <br />CONTRACTOR TO COORDINATE ALL OF THOSE DETAILS NECESSARY <br />PERTINENT TO THE INSTALLATION OF THE MECHANICAL AND ELECTRICAL <br />PHASES AS OUTLINED BY THE DETAILS OF THE MANUFACTURER. <br />COMPLETE MANUFACTURING DRAWINGS AND DETAILS SHALL BE <br />FURNISHED FOR THE INSTALLATION OF THE EQUIPMENT. FINAL <br />CONNECTIONS SHALL BE MADE BY THE DISTRIBUTOR/INSTALLER WHO <br />WILL TUNE -IN THE EQUIPMENT AND LEAVE IT IN SATISFACTORY <br />OPERATING CONDITION. THE MANUFACTURER SHALL HAVE A FACTORY <br />TRAINED ENGINEER AVAILABLE FOR JOB ORIENTATION WHEN REQUIRED <br />BY ANY OF THE TRADES. <br />C. PROVIDE AND INSTALL "OUT" AND "DO NOT ENTER" DECALS ON <br />AUTOMATIC DOOR AS SPECIFIED IN ANSI A-156-10. <br />WARRANTY <br />THE MANUFACTURER SHALL WARRANT ALL EQUIPMENT; INCLUDING <br />OPERATORS, CARPETS, CONTROLS AND ETC.; AND THE INSTALLATION OF <br />THE EQUIPMENT FOR A PERIOD OF TWO (2) FULL YEARS FROM THE <br />INSTALLATION DATE OF THIS EQUIPMENT, THE MANUFACTURER AND/OR <br />THE MANUFACTURER'S DISTRIBUTOR SHALL REPLACE ALL DEFECTIVE <br />EQUIPMENT AT NO ADDITIONAL COST TO THE KMART DURING THIS TWO <br />(2) YEAR WARRANTY PERIOD. THE DISTRIBUTOR SHALL HAVE AVAILABLE <br />ON A LOCAL AREA LEVEL ANY PARTS AND SERVICES REQUIRED <br />THROUGHOUT THE LIFE OF THIS EQUIPMENT. <br />STORAGE UNIT <br />ALL SPECIFICATIONS ARE FOR STORAGE SHEDS AS MANUFACTURED BY <br />"ARROW" OR APPROVED EQUAL <br />STYLE/MODEL: VINYL MILFORD / #VM108 <br />WALL COLOR: ALMOND WITH GRAY BARK TRIM <br />ROOF COLOR: HICKORY BROWN <br />SIZE: 10 FT x 12 FT <br />INTERIOR DIMENSIONS: <br />WIDTH: 1181/4DEPTH: 90" HEIGHT: 84 3/4' <br />WALL HEIGHT: 661/2" <br />DOOR OPENING: <br />WIDTH: 551/2" HEIGHT:641/2' <br />SHIPPING WEIGHT (Ibs): 290 <br />MATERIAL: <br />WALLS: VINYL COATED STEEL PANELS <br />ROOF: <br />HEAVY DUTY STEEL TRUSS SUPPORTS <br />ARROW KIT "13131<1012" <br />ANCHOR. - <br />MODEL AK100 FOR ANCHORING INTO CONCRETE <br />SECTION 09260 <br />GYPSUM BOARD SYSTEMS <br />1. GENERAL <br />1.1 DESCRIPTION <br />A. FURNISH ALL MATERIALS, ACCESSORIES, LABOR, EQUIPMENT, SERVICES, ETC., NECESSARY <br />AND INCIDENTAL FOR THE COMPLETION OF ALL GYPSUM BOARD SYSTEM WORK AS SHOWN ON <br />THE DRAWINGS AND AS SPECIFIED HEREIN. <br />1.2 DELIVERY, STORAGE AND HANDLING <br />A. DELIVER MATERIALS IN ORIGINAL PACKAGES, CONTAINERS OR BUNDLES BEARING BRAND <br />NAME AND IDENTIFICATION OF MANUFACTURER OR SUPPLIER. <br />B. STORE MATERIALS INSIDE UNDER COVER AND KEEP THEM DRY AND PROTECTED AGAINST <br />DAMAGE FROM WEATHER, DIRECT SUNLIGHT, SURFACE CONTAMINATION, CORROSION, <br />CONSTRUCTION TRAFFIC AND OTHER CAUSES. NEATLY STACK GYPSUM BOARDS FLAT TO <br />PREVENT SAGGING. <br />C. HANDLE GYPSUM BOARDS TO PREVENT DAMAGE TO EDGES, ENDS, AND SURFACES. DO NOT <br />BEND OR OTHERWISE DAMAGE METAL CORNER BEADS AND TRIM. <br />2. PRODUCTS <br />2.1 MATERIALS <br />A. GYPSUM BOARD FOR WALLS SHALL BE 1/2" THICK TAPERED EDGE GYPSUM PANELS, <br />B. EXTERIOR TYPE GYPSUM BOARD SHALL BE 1/2" THICK AND SHALL BE DESIGNATED FOR <br />EXTERIOR APPLICATIONS. <br />1. SHEETROCK EXTERIOR GYPSUM CEILING BOARD. <br />C. TRIM ACCESSORIES SHALL BE GALVANIZED STEEL PERFORATED METAL OR EXPANDED <br />FINE -MESH FLANGES. <br />1, CORNER BEAD SHALL BE #800 SERIES OR DUR-A-BEAD. <br />2. EDGE TRIM SHALL BE #200 SERIES AND #800 SERIES. <br />3. CONTROL JOINT SHALL BE #093. <br />D. REINFORCING JOINT TAPE SHALL BE PERF-A-TYPE, <br />E. JOINT COMPOUND EXCEPT FINISH COAT SHALL BE "DURABOND" SERIES. TYPE SHALL BE AS <br />RECOMMENDED BY MANUFACTURER (I.E. PREFILL, TOPPING, LAMINATING, ETC.) <br />F. JOINT COMPOUND FOR WATER RESISTANT GYPSUM BOARD SHALL BE "W/R COMPOUND" <br />G. JOINT COMPOUND FOR FINISH COAT SHALL BE "JOINT COMPOUND - TOPPING" <br />H. FASTENINGS, CLIPS, SCREWS, NAILS, ETC., SHALL BE TYPE, SIZE AND DESIGN AS <br />RECOMMENDED BY DRYWALL SYSTEM MANUFACTURER FOR USE INTENDED. <br />J. ACOUSTICAL SEALANT SHALL BE AS MANUFACTURED BY TREMCO AND DAP. <br />2.2 MANUFACTURERS <br />A. UNITED STATES GYPSUM - SPECIFIED <br />B. GEORGIA-PACIFIC CORPORATION <br />C. GOLD BOND BUILDING PRODUCTS <br />D. DOMTAR GYPSUM, INC. <br />3. EXECUTION <br />3.1 EXAMINATION <br />A. EXAMINE SUBSTRATES TO WHICH DRYWALL CONSTRUCTION ATTACHES OR ABUTS, PRESET <br />HOLLOW METAL FRAMES, CAST -IN -ANCHORS, AND STRUCTURAL FRAMING, WITH INSTALLER <br />PRESENT, FOR COMPLIANCE WITH REQUIREMENTS FOR INSTALLATION TOLERANCES AND OTHER <br />CONDITIONS AFFECTING PERFORMANCE OF DRYWALL CONSTRUCTION. <br />B. DO NOT PROCEED WITH INSTALLATION UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN <br />CORRECTED. <br />3.2 INSTALLATION <br />A. INSTALL GYPSUM DRYWALL SYSTEMS AS SPECIFIED AND IN ACCORDANCE WITH APPLICABLE <br />PORTIONS OF U.S. GYPSUM CO. PUBLICATION "DRYWALL CONSTRUCTION HANDBOOK", LATEST <br />EDITION. <br />1. DO NOT CONNECT OR SUSPEND STEEL FRAMING FROM DUCTS, PIPES, CONDUIT OR METAL <br />ROOF DECK. KEEP HANGERS AND BRACES TWO INCHES CLEAR OF DUCTS, PIPES AND CONDUITS. <br />B. INSTALLATION OF GYPSUM BOARD <br />1. LOCATE EXPOSED END -BUTT JOINTS AS FAR FROM CENTER OF WALLS AND CEILINGS AS <br />POSSIBLE, AND STAGGER NOT LESS THAN 24 INCHES IN ALTERNATE COURSES OF BOARD. <br />2, ATTACH GYPSUM BOARD TO SUPPLEMENTARY FRAMING AND BLOCKING PROVIDED FOR <br />ADDITIONAL SUPPORT AT OPENINGS AND CUTOUTS. <br />3. SPOT GROUT HOLLOW METAL DOOR FRAMES FOR SOLID CORE WOOD DOORS, HOLLOW <br />METAL DOORS AND DOORS OVER 32 INCHES WIDE. APPLY SPOT GROUT AT EACH JAMB ANCHOR <br />CLIP JUST BEFORE INSERTING BOARD INTO FRAME. <br />4. AT ALL EXPOSED EDGES, EXTERIOR CORNERS, WHERE GYPSUM BOARD WALLS OR CEILINGS <br />TERMINATE AGAINST MASONRY, WOOD FRAMES, OTHER DISSIMILAR MATERIALS AND ELSEWHERE <br />AS INDICATED ON DRAWINGS PROVIDE METAL TRIM. <br />C. COMPLETELY CONCEAL METAL CORNER REINFORCEMENT AND METAL EDGE TRIM IN JOINT <br />COMPOUND. <br />1. PROVIDE METAL CONTROL JOINTS AS RECOMMENDED BY DRYWALL MANUFACTURER. <br />2. COMPLETELY FILL JOINT BETWEEN BOTTOM OF GYPSUM BOARD PANEL AND CONCRETE <br />FLOOR SLAB WITH JOINT COMPOUND AND SAND SMOOTH WITH BOARD SURFACE. <br />3. APPLY JOINT TREATMENT AT GYPSUM BOARD WALL AND CEILING JOINTS (BOTH DIRECTIONS), <br />FLANGES OF CORNER BEAD, EDGE TRIM, CONTROL JOINTS, PENETRATIONS, FASTENER HEADS <br />SURFACE DEFECTS AND ALL JOINTS AT CHANGE OF DIRECTION.. <br />4. APPLY TREATMENT IN A MANNER THAT ACHIEVES A SMOOTH, UNIFORM FINISH. <br />SECTION 09900 <br />PRODUCT <br />MATERIALS <br />THINNERS: USE ONLY MATERIALS RECOMMENDED BY PAINT MANUFACTURER. <br />MANUFACTURERS: <br />A. PAINT <br />1. SEARS <br />FINISHES <br />COLORS - REFER TO DRAWINGS. WHERE NOT INDICATED ON DRAWINGS, COLORS SHALL BE AS <br />SELECTED BY OWNER'S REPRESENTATIVE. <br />A. INTERIOR <br />1. CONCRETE MASONRY: <br />A. PRIME COAT - (1 COAT): <br />B. FINISH (1 COAT TO PROVIDE PINHOLE FREEaFULLHIDING COVERAGE): <br />C. SEE DRAWINGS FOR COLOR AND TYPE OF FINISH. <br />2. GYPSUM BOARD: <br />A. PRIME COAT - (1 COAT): <br />B. FINISH COAT - (1 COAT TO PROVIDE FULL HIDING COVERAGE): <br />C. SEE DRAWINGS FOR COLOR AND TYPE OF FINISH. <br />3. HOLLOW METAL DOORS AND FRAMES: <br />A. FINISH COAT - (2 COATS): <br />4. ALL MISCELLANEOUS EXPOSED METAL ITEMS IN FINISHED AREAS (HANDRAILS, RAILING <br />BRACKETS, JAMB AND SILL.ANGLES, STEEL LINTELS): <br />A. FINISH COAT- (2 COATS): <br />EXECUTION <br />EXAMINATION <br />THIS CONTRACTOR IS RESPONSIBLE FOR INSPECTING THE WORK OF OTHERS PRIOR TO THE <br />APPLICATION OF ANY PAINT OR FINISHING MATERIAL. <br />APPLICATION <br />A. PAINT MAY BE APPLIED BY SPRAY, ROLLER OR BRUSH UNLESS OTHERWISE SPECIFIED. METHOD <br />SELECTED MUST BE IN ACCORDANCE WITH MATERIAL MANUFACTURER'S SPECIFICATIONS <br />AND/OR RECOMMENDATIONS, SUITABLE FOR SURFACE TO WHICH MATERIAL IS APPLIED AND <br />FINISH SPECIFIED. <br />1. CARE MUST BE EXERCISED AND PROTECTION PROVIDED FOR ADJACENT PREFINISHED OR <br />UNFINISHED ITEMS, MOVING PARTS, OR ASSEMBLIES, SPRINKLER HEADS, VALVES, MOTORS, <br />MACHINERY, ETC. PROVIDE ALL REQUIRED COVERING, MASKING TAPE, ETC. <br />B. FINISH COLORS SHALL BE AS INDICATED ON THE DRAWINGS OR AS DIRECTED BY OWNER'S <br />REPRESENTATIVE. TINT PRIMER AND UNDERCOAT TO THE APPROXIMATE SHADE OF THE FINISH <br />COAT. <br />C. AT COMPLETION OF CONSTRUCTION ACTIVITIES OF OTHER TRADES, TOUCH UP AND RESTORE <br />DAMAGED OR DEFACED PAINTED SURFACES. <br />D. ALL COATS MUST BE THOROUGHLY DRY BEFORE APPLYING SUCCEEDING COATS. <br />E. ALL WORK WHERE A COAT OF MATERIAL HAS BEEN APPLIED, MUST BE INSPECTED AND <br />APPROVED BY THE GENERAL CONTRACTOR BEFORE THE APPLICATION OF THE SUCCEEDING <br />SPECIFIED COAT, OTHERWISE NO CREDIT FOR THE COAT APPLIED WILL BE GIVEN, AND THIS <br />CONTRACTOR SHALL THEN ASSUME THE RESPONSIBILITY AND RE -COAT THE WORK IN <br />QUESTION. <br />1. PUTTY NAIL HOLES, CRACKS AND OTHER DEFECTS IN ALL WOODWORK AND PLYWOOD <br />SCHEDULED TO BE FINISHED AFTER THE FIRST COAT, WITH PUTTY COLORED TO MATCH THE <br />FINISH. BRING PUTTY FLUSH WITH THE ADJOINING SURFACE. <br />2. BETWEEN COATS, SAND ENAMEL OR VARNISH FINISH APPLIED TO WOOD OR METAL WITH <br />FINE SANDPAPER AND CLEAN TO PRODUCE AN EVEN SMOOTH FINISH. <br />DESCRIPTION <br />PROVIDE ALL MATERIALS, LABOR, EQUIPMENT, SERVICE, SCAFFOLDING, ETC., NECESSARY AND <br />INCIDENTAL TO THE COMPLETION OF ALL PAINTING AS SHOWN ON THE DRAWINGS AND AS <br />SPECIFIED HEREIN. <br />REVISIONS <br />BIDDERS PRINTS ISSUED <br />JANUARY 17, 2007 <br />BULLETIN #1 <br />APRIL 16, 2007 <br />Cl� <br />+4 <br />�O <br />cd <br />Or, <br />w C) <br />U <br />cn <br />co <br />Q <br />CI] <br />x <br />Q <br />0 <br />L <br />�L <br />O <br />J <br />LL. NQ <br />L.L <br />J Q <br />J_ <br />L.L <br />0 <br />m <br />CL <br />W -� <br />NCD <br />J <br />1 <br />r <br />C4 N <br />1` N <br />CM <br />it <br />�L <br />LO <br />CD <br />Co <br />m <br />1 <br />w <br />m <br />100 <br />'T <br />co <br />co <br />z <br />40 <br />- <br />Q <br />S <br />U <br />� <br />cn <br />_J <br />~ <br />v <br />z <br />WIr <br />za�Q <br />Cn <br />Q <br />� <br />I- <br />LN <br />J <br />Q <br />cn <br />Ln <br />U <br />LL <br />Project Arch./ Engineer: <br />R.THORNTON <br />Drawn: <br />RKT <br />Checked: <br />JOHN LINEGAR <br />Date: <br />JANUARY 17, 2007 <br />I " <br />r11 <br />Sheet No: <br />SPm2 <br />