Laserfiche WebLink
N - <br />6 <br />�`fi 2 LBS. EPS <br />FOAM <br />1 1/2" <br />5 I V 11%111.— 1 <br />1 II = 1 1-011 <br />7 <br />�� CV <br />0 2 LBS. EPS 4 <br />FOAM <br />04 <br />2 1/2" <br />BRACKET DETAIL <br />6 1 it = 1 1—nil <br />2 LBS. EPS <br />FOAM <br />4" 4" 4" 4" <br />7 1 <br />1- N-4, 1_n1I <br />041 1/2" <br />'v <br />8"X1" THICK PAINTED <br />RAISED TRIM BAND- <br />;0 <br />L;Imm <br />12 <br />51 <br />8 <br />A5 <br />ELEV AT 18'-0" <br />T.O.P. <br />7/8" <br />STUCCO <br />OVER FRAME <br />CASING BEAD <br />W/ WEEPS <br />OVER <br />ELEV AT 10'-0" FLASHING <br />2ND FLOOR FF <br />CASING BEAD <br />W/ WEEPS <br />OVER <br />FLASHING <br />SHINGLE <br />ROOF-, <br />ELEV AT 8'-8" <br />T.O.M. <br />WEEP SCREED <br />TYP. co / <br />M <br />F, <br />.1 mi 0 <br />IL <br />� "Ok <br />1 /411 = 1 1-011 <br />/-4'OFF RIDGE <br />12 VENT SHINGLE <br />ROOF <br />�I■IIINIIII�i. <br />..aiauumruaw■aw■uw.._ <br />ELEV AT 18'-0" <br />T.O.P. <br />ELEV AT 10'-0" <br />2ND FLOOR FF <br />C? <br />C.J. <br />FLASHING <br />ROOF FINISH <br />PER ELEVATION <br />ROOF SHEATHING <br />ELEV AT 8'-8" <br />sk <br />MANUFACTURED <br />ROOF TRUSS <br />T.O.M. <br />SCREED <br />TYP. <br />MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />ON CMUO <br />ELEV AT 0'-0" <br />ALUMINUM WRAP <br />11-01 1ST FLOOR FF <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />81 SOFFIT DETAIL <br />AM" = 11—no, <br />0 <br />10 <br />ROOF FINISH <br />PER ELEVATION <br />ROOF SHEATHING <br />MANUFACTURED <br />ROOF TRUSS <br />MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />11 = 1 1—nil <br />7"XV THICK <br />PAINTED RAISED <br />TRIM BAND <br />6"X1" THIC <br />PAINTED I <br />TRIM BAN <br />11 = 1 1—A11 <br />I <br />I <br />3 <br />� I <br />z� I <br />3" <br />9 <br />A5 <br />WEEP SCREED 5'-6" -- 1'-4" <br />TYP. 01 <br />Lj <br />Ll <br />L-1 <br />I I DRIP " SCREED, <br />Lj L-1 <br />L-1 <br />AT BOTTOM OF <br />BAND <br />D El El El 1:11:11:1 <br />I — u __ u — u — I=---- u__A ___ <br />ocnw <br />_ * 7/8" STUCCO <br />N OVER <br />_ FRAME <br />A/C UNIT <br />AND PAD <br />r• <br />2 REAR ELEVATION B <br />1 /8 - 1 -0 <br />4' OFF RIDGE 9'-8" 6-0" 164" <br />51 12 VENT <br />IILIuN,SHINGLE 8 00 <br />ROOF A5 a <br />ON <br />7 - <br />cn v 1 -0 0 <br />0_jEELEV AT 18'-0" _ _ ' <br />T.O.P. — N - — <br />C.J. z C.J. C.J <br />J = W <br />ELEV AT 10'-0" b w a0 N <br />2ND FLOOR FF 3-0�7/8" STUCCO cJn Sri <br />OVER <br />ELEV AT 8'-8" _ - _ - - - - - - - - - - 12- ' <br />T.O.M. I 4' OFF RIDGE <br />VENT <br />DRIP ,V, ( O <br />SCREED STUCCO WEEP - 21-0" <br />STUCCO SCREED ?Q <br />OVER CMU TYP. � <br />ELEV AT 0'-0" _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ <br />1ST FLOOR FF <br />0 0 <br />(:D <br />�1/89�-Tl <br />ELEVATION BLSL� OPE pw pz SLOPE <br />1-On 5:12 'v> v> 5:12 <br />4' OFF RIDGE <br />VENT SHINGLE <br />8 - - - -- <br />A5 5 ROOF <br />ELEV AT 18'-0" _ <br />T.O.P. C.J. z C.J. <br />g J = 9 CASING <br />ELEV AT 1 U-0" o � w c? C.J. A5 BEAD W/ I W <br />CL <br />2ND FLOOR FF �7/8" STUCCO N = OVER 1,7 <br />WEEPS O N <br />OVER FLASHING U) Lo <br />ELEV AT 8'-8" 12 SLOPE SLOP <br />T.O.M. -4 - — 5:12 5:12 <br />It <br />A/C UNIT WEEP—/ 7—F <br />AND PAD 2 -0 - 5/8" _ SCREED SLOPE <br />STUCCO 0? <br />� I_ OVER CMU icy TYP 5:12 <br />ELEV AT 0'-0" _ _ _ _ _ _ _ _ _ _ _ _ _ W <br />1ST FLOOR FF \CIs' <br />LOP <br />5:12 <br />(DLEF1 ELEVATION B 12 RO2FLA.NB..... P <br />1 /8 - 1 -0 1 /8 = 1 -0 <br />FLASHING NOTES: <br />DUE TO CLARITY NOT ALL REQUIRED FLASHING ARE <br />INDICATED ON DRAWINGS. REFER TO FBC RES 2020 (7TH <br />EDITION), SECTION R703.4. AND R903.2 APPROVED <br />CORROSION -RESISTIVE FLASHING SHALL BE PROVIDED AT <br />ALL ROOFING SYSTEM INTERRUPTIONS, TERMINATIONS, <br />INTERSECTIONS, AND PENETRATIONS AND IN THE <br />EXTERIOR WALL ENVELOPE IN SUCH A MANNER AS TO <br />PREVENT ENTRY OF WATER INTO THE WALL CAVITY OR <br />PENETRATION OF WATER TO THE BUILDING STRUCTURAL <br />FRAMING COMPONENTS. THE FLASHING SHALL EXTEND <br />TO THE SURFACE OF THE EXTERIOR WALL FINISH AND <br />SHALL BE INSTALLED TO PREVENT WATER FROM <br />REENTERING THE EXTERIOR WALL ENVELOPE. APPROVED <br />CORROSION -RESISTANT FLASHING SHALL BE INSTALLED <br />AT ALL OF THE FOLLOWING LOCATIONS: <br />1. AT TOP OF ALL EXTERIOR WINDOW AND DOOR <br />OPENINGS IN SUCH A MANNER AS TO BE LEAK PROOF, <br />EXCEPT THAT SELF -FLASHING WINDOWS HAVING A <br />CONTINUOUS LAP OF NOT LESS THAN 1-1/8 INCHES (28 <br />MM) OVER THE SHEATHING MATERIAL AROUND THE <br />PERIMETER OF THE OPENING, INCLUDING CORNERS, DO <br />NOT REQUIRE ADDITIONAL FLASHING; JAMB FLASHING <br />MAY ALSO BE OMITTED WHEN SPECIFICALLY APPROVED <br />BY THE BUILDING OFFICIAL. <br />2. AT THE INTERSECTION OF CHIMNEYS OR OTHER <br />MASONRY CONSTRUCTION WITH FRAME OR STUCCO <br />WALLS, WITH PROJECTING LIPS ON BOTH SIDES UNDER <br />STUCCO COPINGS. <br />3. UNDER AND AT THE ENDS OF MASONRY, WOOD OR <br />METAL COPINGS AND SILLS. <br />4. CONTINUOUSLY ABOVE ALL PROJECTING WOOD <br />TRIM. <br />5. WHERE EXTERIOR PORCHES, DECKS OR STAIRS <br />ATTACH TO A WALL OR FLOOR ASSEMBLY OF <br />WOOD -FRAME CONSTRUCTION. <br />6. AT WALL AND ROOF INTERSECTIONS. <br />7. AT BUILT-IN GUTTERS. <br />8. WHENEVER THERE IS A CHANGE IN ROOF SLOPE OR <br />DIRECTION. <br />9. AT ROOF CRICKET OR SADDLE. <br />10. AROUND ROOF OPENINGS. <br />GENERAL FLASHING NOTES: <br />INSTALL FLASHING IN ACCORDANCE WITH FBC RES 7TH <br />EDITION (2020), SECTION R703.4 AND IN ACCORDANCE <br />WITH STANDARD APPLICATIONS ILLUSTRATED IN THE <br />ARCHITECTURAL SHEET METAL MANUAL (LATEST <br />EDITION) AS PUBLISHED BY THE SHEET METAL AND AIR <br />CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, <br />INC. <br />WINDOW NOTE: <br />ALL NEW WINDOWS MUST MEET A MINIMUM 'U'-VALUE OF <br />0.4 OR LESS AND A 'SHGC' OF 0.25 OR LESS. (UTILIZING <br />THE PRESCRIPTIVE METHOD FOR EXISTING STRUCTURES) <br />EGRESS NOTE: <br />EACH BEDROOM MUST HAVE ONE WINDOW THAT <br />COMPLIES WITH EGRESS CODES, IF THERE IS NO ACCESS <br />TO EXTERIOR THROUGH A DOOR. THE WINDOW MUST <br />HAVE A MAXIMUM SILL HEIGHT OF 44" ABOVE FINISH <br />FLOOR LINE OF THAT PARTICULAR ROOM <br />SHINGLE / UNDERLAYMENT NOTE: <br />ASPHALT SHINGLES ARE IN ACCORDANCE WITH TABLE <br />R905.2.6.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />SHINGLE UNDERLAYMENT SHALL COMPLY WITH SECTION <br />905.1.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />GENERAL FINISH NOTES: <br />APPLICATION OF STUCCO (EXTERIOR PLASTER) <br />MUST BE IN ACCORDANCE WITH FBC R703.7, <br />ASTM C926 AND C1063 <br />ALL LATH AND LATH ATTACHMENTS TO BE OUT OF <br />CORROSION -RESISTANT MATERIAL. (REFER TO SHEET SN1 <br />FOR THE ENGINEERED METHOD FOR LATH ATTACHMENT) <br />GENERAL NOTES: <br />* G.C. VERIFY ROOF PITCH <br />ROOF PITCH VARIES PER SUBDIVISIONS (5/12 PR 5.9/12) <br />IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ROOF <br />SLOPE REQUIREMENTS WITH TRUSS MANUFACTURER. <br />ROOF CRITERIA <br />- 12" OVERHANG U.N.O. <br />- PLUMB CUT FASCIA <br />- ROOF PITCH PER ELEVATION <br />- WINDLOAD CALC. PER ASCE 7-98 (VARIES BY LOCATION) <br />- SHINGLE LOADING <br />ROOF VENT CALCULATIONS: <br />NOTE: VERIFY WITH GENERAL CONTRACTOR ALL ROOF VENT <br />LOCATIONS, QUANTITIES, AND SIZES. ROOF VENTS SHALL BE <br />INSTALLED FOR A MIN. OF VENTED AREA AS LISTED BELOW OR <br />EQUIVALENT SYSTEM PER 7TH EDITION (2020) FBC SECTION R806 <br />FORMULA = S.F. / 150 (1/150) ` 144 (TO CONVERT TO SQ. INCHES) _ <br />NET SQ. INCH REQUIREMENT <br />ATTIC AREA = 1697 SQ FT <br />VENTILATION REQUIRED = 815 SQ IN <br />VENTILATION PROVIDED AT RIDGE = 407 SQ IN <br />VENTILATION PROVIDED AT SOFFIT = 1218 SQ IN <br />ATTIC VENTILATION <br />ATTIC VENTILATION TO BE IN COMPLIANCE WITH THE FLORIDA <br />BUILDING CODE 7TH EDITION (2020) RESIDENTIAL R806. <br />THE MINIMUM NET FREE VENTILATING AREA SHALL BE 1/150 OF THE <br />AREA OF THE VENTED SPACE. THE VENTILATED AREA MAY BE <br />REDUCED TO 1/300 PROVIDED THAT AT LEAST 40% BUT NO MORE <br />THAN 50% OF THE REQUIRED VENTILATION IS PROVIDED IN THE <br />UPPER PORTION OF THE SPACE TO BE VENTILATED. UPPER <br />VENTILATORS SHALL BE LOCATED NO MORE THAN 3 FEET MEASURE <br />VERTICALLY) BELOW THE RIDGE OR HIGHEST POINT OF THE SPACE, <br />WITH THE BALANCE OF THE REQUIRED VENTILATION PROVIDED BY <br />EAVE OR CORNICE VENTS. <br />CALCULATIONS BASED ON THE FOLLOWING VALUES, SEE ROOF PLAN. <br />(VALUES TO BE VERIFIED WITH MANUFACTURER SPECIFICATIONS) <br />* RIDGE VENTS - 18 SQ. IN. OF NET FREE AREA / LINEAR FT. <br />OFF -RIDGE VENTS - 138 SQ. IN. OF NET FREE AREA / UNIT <br />* SOFFIT VENTS 7 SQ. IN. OF THE NET FREE AREA / SQ. FT. <br />IF NOT ENOUGH VENTED SOFFIT IS PROVIDED DUE TO FIRE <br />PROTECTION, THE CONTRACTOR SHALL USE DECK -AIR OF OTHER <br />APPROVED MATERIAL TO PROVIDE SUFFICIENT IN -TAKE VENTILATION <br />" LOMANCO DECK -AIR - 9 SQ. IN. OF NET FREE AREA / FT. FOR SHINGLE <br />36 SQ. IN. OF NET FREE AREA / FT. FOR TILE <br />NOTE: <br />EXTERIOR WINDOWS, SLIDING DOORS AND EXTERIOR SIDE -HINGE <br />DOORS SHALL BE TESTED AND LABELED WITH A PERMANENT LABEL <br />PROVIDING TRACEABILITY TO MANUFACTURER AND PRODUCT <br />O <br />7 r <br />� 9 <br />M <br />Ln <br />u0 <br />awl, <br />6z0, 5 <br />a <br />W <br />0 <br />z <br />V) <br />E <br />M.0 <br />V)V <br />moof `•'a <br />O O u g <br />Q <br />° <br />•N <br />Z' <br />w C <br />_CN C <br />�1c.0 <br />W <br />L c E M CA <br />o O a <br />W <br />W <br />Ow u� WOt- <br />LU LU _j WWI''zo: <br />¢ z <br />xOji.j(nO�m0U-0 <br />Q H <br />= <br />0U o_"o2oomoz- <br />< <br />O O <br />W O Z <br />�� LL j Cn W W��� x< <br />��QoWQ�zWzowoo, <br />0 X J <br />LL <br />$w 1w25 <br />o D oQz <br />LLL ¢ 0 F- ¢ , <br />R <br />0 <br />Z <br />W <br />O� <br />Z) t` <br />OF.:cMO <br />Q M <br />� <br />� <br />F— W 11 M <br />Z U <br />W <br />W <br />JQ <br />CO <br />r <br />Virtual <br />Plans Review <br />vie <br />s <br />I <br />n <br />or compliance wi <br />h <br />t d <br />a d <br />. <br />Pp <br />v <br />by Oebra <br />ne <br />27 <br />Iah, <br />IIP <br />FBI' <br />p 1 <br />l) th <br />dit <br />on <br />O <br />o <br />O <br />o <br />O <br />o <br />N <br />0 <br />M <br />a <br />0 <br />O <br />N <br />O <br />z <br />o <br />�0 <br />o <br />O <br />NN <br />NN <br />0 <br />' <br />Z <br />O <br />N <br />to <br />w <br />o <br />O <br />O <br />O <br />O <br />a <br />^ <br />U♦ <br />N <br />M <br />'i <br />6 <br />(p <br />co � <br />W <br />Qz <br />♦-+ <br />C)W <br />W <br />z oz <br />0 <br />U <br />��� <br />O <br />Q <br />T-q <br />Z <br />a_a <br />Q <br />= <br />w <br />0 <br />��� <br />O <br />(V <br />zzo= <br />■ ■ <br />W <br /><�� <br />N2 <br />O <br />zm0 <br />U <br />W <br />Z <br />CLZI <br />�z <br />Z <br />U <br />0 <br />_0 <br />W <br />z <br />A5Z <br />Z <br />W <br />W <br />J <br />"C"_ <br />LAST PLOT DATE <br />U <br />O <br />March 23, 2023 <br />O <br />EXTERIOR <br />J <br />ELEVATIONS & ROOF <br />PLAN B <br />