Laserfiche WebLink
GENERAL NOTE: VERIFY ALL PIPE SIZES, EQUIPMENT LOCATIONS AND <br />CONSTRUC-nOISLDETAILS WITH DENTAL EQUIPMENT SUPPLIER PRIOR TO <br />ANY CONSTRUCTION ACTNRY OR QRDERING MATERIALS. IN CASE OF <br />1 MEDICAL GAS PLAN <br />P-3 SCALE: 1/4" = 1'-0" <br />►1,12 C�liil <br />MEDICAL GAS LEGEND <br />AIR — AIR <br />— D D D — <br />N20 N20 <br />N2 — N2 <br />02 02 <br />VAC VAC <br />— <br />-V--- V - - -V <br />-- <br />COMPRESSED AIR PIPING <br />DRAIN PIPING <br />NITROUS OXIDE PIPING <br />NITROGEN PIPING <br />OXYGEN PIPING <br />VACUUM PIPING <br />VENT PIPING <br />KEYED NOTES: O <br />1. NEW MEDICAL AIR COMPRESSOR BY DENTAL EQUIPMENT SUPPLIER (DES). PROVIDE ALL OPTIONS <br />AND ACCESSORIES AS REQUIRED BY DES. PROVIDE 2" PVC INTAKE PIPE TO ROOF CAP & MAINTAIN <br />10 FEET CLEARANCE FROM ALL EXHAUSTS. <br />2. NEW VACUUM PUMP BY DES. PROVIDE ALL OPTIONS AND ACCESSORIES AS REQUIRED BY DES. <br />PROVIDE 2" PVC INTAKE PIPE TO ROOF CAP & MAINTAIN 10 FEET CLEARANCE FROM ALL EXHAUSTS. <br />ROUTE DRAIN PIPE INDIRECT TO FLOOR DRAIN WITH MIN. 1 " AIR GAP. <br />3. NEW DENTAL UTILITY STATION BY DES. <br />4. NEW AIR OUTLET LOCATED ABOVE COUNTERTOP. <br />5. NEW VACUUM INLET LOCATED ABOVE COUNTERTOP. <br />6. NEW AREA ALARM BY DES. CONNECT POWER VIA CORD/PLUG TO RECEPTACLE LOCATED ABOVE <br />CEILING. <br />7. NEW MASTER CONTROL VALVE BY DES. CONNECT POWER VIA CORD/PLUG TO RECEPTACLE LOCATED <br />ABOVE CEILING. <br />8. NEW OXYGEN AND NITROUS OXIDE BOTTLE TANK STORAGE CLOSET. MANIFOLD TANKS TOGETHER <br />ACCORDING TO DES DETAILS. PROVIDE FULLY LOUVERED CLOSET DOOR FOR VENTILATION TO BE <br />PROVIDED BY FAN IN BREAK ROOM. <br />MEDICAL GAS SPECIFICATIONS <br />1.GENERAL <br />A.PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED FOR A COMPLETE SYSTEM AS OUTLINED IN THE CONTRACT DRAWINGS AND <br />THESE SPECIFICATIONS. <br />B. NOTE THAT DRAWINGS ARE DIAGRAMMATIC ONLY AND INTENDED TO SHOW THE GENERAL ARRANGEMENT OF SYSTEMS, NOT EVERY <br />MINUTE DETAIL. <br />C.DO NOT SCALE PLANS. <br />D.PROVIDE ALL NECESSARY FITTINGS, TRANSITITONS, CONNECTORS, ETC. WHETHER SHOWN OR NOT ON PLANS. <br />E.ALL WORK IS NEW UNLESS OTHERWISE NOTED. <br />FALL WORK SHALL CONFORM TO THE FOLLOWING CODES (AS APPLICABLE) AS WELL AS ALL LOCAL REGULATIONS, ORDINANCES, AND <br />AMENDMENTS: <br />2007 FLORIDA BUILDING CODE W/ 2009 SUPPLEMENT <br />2002 NFPA 99 <br />2.SCOPE OF WORK <br />PROVIDE NEW MEDICAL GAS PIPING, EQUIPMENT, AND ACCESSORIES AS SHOWN ON THIS PLAN AND THE DENTAL EQUIPMENT SUPPLY <br />DRAWINGS. <br />3.ITEMS FURNISHED BY CONTRACTOR <br />IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL MATERIALS, EQUIPMENT, AND ACCESSORIES NECESSARY TO MAKE <br />A COMPLETE INSTALLATION. ALL EQUIPMENT SHALL BE STORED IN A SAFE, DRY PLACE IN THE MANUFACTURER'S ORIGINAL PACKAGING <br />UNTIL READY FOR USE. THE OWNER SHALL NOT BE RESPONSIBLE FOR PROVIDING ANY PART OF THE PROJECT, UNLESS SPECIFICALLY <br />NOTED. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR PAYING ALL REQUIRED FEES, OBTAINING ALL PERMITS, AND ARRANGING FOR <br />ALL INSPECTIONS. <br />4.WORK IN EXISTING BUILDINGS <br />A.DO NOT USE POWDER DRIVEN FASTENERS OF ANY TYPE. <br />BALL ITEMS REMOVED AND NOT RE -USED SHALL BE TURNED OVER TO THE OWNER. CONTRACTOR SHALL REMOVE ANY UNSATISFACTORY <br />ITEMS FROM THE PROJECT SITE. <br />C.SOME EXISTING ITEMS TO REMAIN WITHOUT WORK ARE SHOWN FOR CLARITY OR REFERENCE ONLY. NOTE THAT ADDITIONAL ITEMS <br />WITHOUT WORK MAY ALSO BE PRESENT. <br />D.DRAWINGS OF EXISTING SYSTEMS ARE BASED ON EXISTING DOCUMENTS AND FIELD CONDITIONS, SOME OF WHICH MAY BE UNVERIFIED. <br />PRIOR TO SUBMITTING A BID, CONTRACTOR SHALL STUDY THE PLANS AND VISIT THE PROJECT SITE IN ORDER TO BECOME FAMILIAR <br />WITH EXISTING CONDITIONS. ANY DISCREPANCIES IN THE CONTRACT DOCUMENTS WHICH COULD SIGNIFICANTLY IMPACT THE PROJECT <br />BUDGET OR SCHEDULE MUST BE REPORTED TO THE ENGINEER IN WRITING IMMEDIATELY. FAILURE TO DO SO WILL NOT BE SUFFICIENT <br />CAUSE FOR DELAYS OR CHANGES LATER IN THE PROJECT. CHANGE ORDERS RESULTING FROM FAILURE TO PROPERLY INVESTIGATE <br />EXISTING FIELD CONDITIONS WILL NOT BE ACCEPTED. ALL WORK IS NEW UNLESS OTHERWISE NOTED. <br />E.MODIFICATIONS TO EXISTING SYSTEMS NECESSARY TO CONNECT TO NEW WORK SHALL BE CONSIDERED TO BE PART OF THE BASIC <br />WORK OF THIS CONTRACT. <br />F. COORDINATE ALL WORK SCHEDULES WITH THE OWNER TO MINIMIZE DISRUPTIONS TO EXISTING SYSTEMS OUTSIDE THIS SCOPE OF WORK. <br />5.000RDINATION <br />ALL WORK ON THIS PROJECT SHALL BE COORDINATED WITH ALL OTHER TRADES. CONTRACTOR SHALL REVIEW PLANS OF ALL DISCIPLINES <br />INVOLVED AND ADVISE THE ARCHITECT IN WRITING OF ANY CONFLICTS, CODE OR SAFETY ISSUES THAT MAY EXIST PRIOR TO ANY <br />FABRICATION OR ORDERING OF EQUIPMENT. PROVIDE ROUTING AND OFFSETS NECESSARY TO AVOID CONFLICTS WITH STRUCTURE, FINISHES, <br />AND WORK OF OTHERS. CONTRACTOR SHALL PROVIDE ALL CORE PENETRATIONS AND PATCHING FOR PIPING FLOOR PENETRATIONS. <br />6.MEDICAL GAS GENERAL <br />A.ALL MEDICAL GAS SYSTEMS INSTALLATION SHALL BE COORDINATED WITH THE OWNER, ARCHITECT, AND DENTAL EQUIPMENT SUPPLIER <br />PRIOR TO ROUGH IN. IN CASE OF CONFLICTS THE DENTAL EQUIPMENT SUPPLIER DRAWINGS & SPECS SHALL GOVERN. <br />B.INSTALL ALL WORK IN COMPLIANCE WITH ADA REQUIREMENTS AS NECESSARY. <br />CALL PIPING SHALL BE CONCEALED IN WALLS, FLOORS, CHASES, CEILINGS, ETC. UNLESS SPECIFICALLY NOTED ON DRAWINGS. ANY PIPING <br />OR ACCESSORIES THAT MUST BE EXPOSED SHALL HAVE A POLISHED CHROME FINISH. <br />D.000RDINATE THE ELECTRICAL CHARACTERISTICS OF ALL ELECTRICAL EQUIPMENT WITH THE ELECTRICAL CONTRACTOR PRIOR TO ORDERING. <br />E.PROVIDE LABELS AT REGULAR INTERVALS FOR ALL PIPING ABOVE GROUND. LABELS SHALL STATE THE TYPE OF FLUID OR PIPE SERVICE <br />AND FLOW DIRECTION. <br />7.MEDICAL GAS PIPING <br />A.ALL MEDICAL GAS PIPING SHALL BE CONSTRUCTED OF OXYGEN GRADE TYPE "L" COPPER WITH SILVER SOLDERED JOINTS. <br />BALL PIPING SHALL BE SIZED PER THE DRAWINGS OR NFPA 99, WHICHEVER SIZE IS GREATER. <br />CALL VACUUM PIPING SHALL BE MIN. 3✓4" SIZE. <br />D.PIPING FOR ALL OTHER GASES SHALL BE MIN 16" SIZE. <br />E.ALL PIPING SHALL BE RUN BELOW FLOOR AS SHOWN TO INDICATED INLET & OUTLET LOCATIONS. FOR ALL PIPING BELOW FLOORS, <br />MAKE EVERY ATTEMPT POSSIBLE TO MINIMIZE THE NUMBER OF JOINTS BELOW THE FLOOR. <br />8.MEDICAL GAS EQUIPMENT AND ACCESSORIES <br />A.PROVIDE AND INSTALL ALL EQUIPMENT AS SPECIFIED BY THE MEDICAL OR DENTAL EQUIPMENT SUPPLIER. <br />B.PROVIDE SHUTOFF VALVES AT ALL CONNECTIONS TO MEDICAL GAS EQUIPMENT. <br />C.PROVIDE DISCONNECT SWITCHES WITH ALL ELECTRICAL EQUIPMENT, <br />D.PROVIDE ZONE ISOLATION AND CONTROL VALVES AT LOCATIONS SPECIFIED ON DRAWINGS OR ELSEWHERE AS REQUIRED BY NFPA 99. <br />A.MOUNT ALL WALL DEVICES MIN 42" A.F.F. OR 6" ABOVE COUNTER, UNLESS OTHERWISE NOTED ON DRAWINGS. COORDINATE EXACT <br />LOCATION WITH OWNER, MEDICAL/DENTAL EQUIPMENT SUPPLIER, AND ARCHITECT PRIOR TO ROUGH IN. <br />9. PENETRATIONS <br />A.ALL PENETRATIONS THROUGH RATED WALLS OR FLOORS SHALL BE SEALED WITH AN APPROVED FIREPROOFING TO MAINTAIN THE <br />INTEGRITY OF THE WALL OR FLOOR. <br />B.ALL PIPING PASSING THROUGH BUILDING STRUCTURE OR RATED WALLS OR FLOORS SHALL BE SLEEVED. <br />C.ALL PIPE SLEEVES SHALL BE SIZED AND INSTALLED TO ALLOW FOR PIPE EXPANSION. <br />D.SUBMIT ALL SLEEVE SIZES AND LOCATIONS TO THE STRUCTURAL ENGINEER FOR APPROVAL PRIOR TO STARTING WORK. <br />10. WARRANTIES AND MAINTENANCE <br />A.ALL FIXTURES SHALL BE TESTED, CLEANED, AND PLACED IN GOOD OPERATING CONDITION BY THE CONTRACTOR. CONTRACTOR SHALL <br />GUARANTEE ALL EQUIPMENT, MATERIALS, AND WORKMANSHIP TO BE FREE OF DEFECTS FOR A PERIOD OF ONE YEAR FROM THE DATE <br />OF ACCEPTANCE BY THE OWNER AND THE CONTRACTOR SHALL REPAIR ANY SUCH DEFECTS AT NO COST TO THE OWNER. ALL <br />EQUIPMENT INCLUDED IN THE PROJECT SHALL BE COVERED BY THE MANUFACTURER'S WARRANTY FOR THE DURATION OF THAT <br />WARRANTY. COPIES OF ALL MANUFACTURER'S WARRANTIES AND CONTRACTOR WARRANTIES SHALL BE PROVIDED TO THE OWNER AT FINAL <br />ACCEPTANCE. <br />B.CONTRACTOR SHALL RECORD DRAWINGS DURING CONSTRUCTION AND NOTE LOCATIONS OF ANY OFFSETS OR OTHER DEVIATIONS FROM <br />THE ORIGINAL CONTRACT DOCUMENTS. AT THE CLOSE OF THE PROJECT, CONTRACTOR SHALL PROVIDE A COPY OF THESE DRAWINGS TO <br />THE OWNER AS "AS-BUILTS". <br />DCH PROJECT NUMBER: 11-002 <br />TO THE BEST OF THE KNOWLEDGE OF THE ARCHITECTS AND <br />ENGINEERS, SAID PLANS AND SPECIFICATIONS COMPLY WITH THE <br />2007 FLORIDA BUILDING CODE WITH 2O09 SUPPLEMENTS AND THE <br />APPLICABLE MINIMUM FIRE SAFETY STANDARDS. <br />ALL DIMENSIONS AND JOB CONDITIONS SHALL BE VERIFIED BY THE <br />CONTRACTOR, ANY AND ALL DISCREPANCIES SHALL BE REPORTED <br />TO THE ARCHITECT PRIOR TO COMMENCEMENT OF CONSTRUCTION. <br />THE DRAWINGS & DESIGN ARE VALID FOR 12 MONTHS FROM DATE <br />OF ORIGINAL SEAL. <br />ISSUE <br />DATE <br />REVIEW <br />1 /27/11 <br />PERMIT <br />1 /27/11 <br />REV. <br />REV. <br />REV, <br />REV. <br />THESE DOCUMENTS, DESIGNS, NOTES, DETAILS AND <br />SPECIFICATIONS AND CONCEPTS ARE THE SOLE <br />PROPERTY OF FRAZE DESIGN, INC. AND SHALL NOT BE <br />REPRODUCED, RE -USED OR COPIED FOR OTHER <br />PROJECTS, IN WHOLE OR PART WITHOUT THE WRITTEN <br />CONSENT OF FRANK FRAZE, ARCHITECT, AIA. <br />ALL RIGHTS ARE RESERVED BY THE ARCHITECT IN <br />ACCORDANCE WITH U.S. COPYRIGHT AND PATENT <br />LAWS. UNAUTHORIZED REPRODUCTION WILL BE <br />PROSECUTED TO THE FULL EXTENT OF THE LAW. <br />PROFESSIONAL SEAL <br />®�oottt®ieoo+ <br />o®�® t LEOn j,(� 00 <br />��e 4 � • • • • ° e i�w®I�I <br />e 1U <br />.• NS�c ®v, <br />O ° O <br />e <br />® • $ ® (�I <br />SOf ' 4U <br />O•a <br />VINE z �RDO <br />FLO Gar *ji 009 <br />W) <br />00 <br />O <br />o <br />N <br />� <br />m <br />V) <br />M <br />00 <br />� <br />QI <br />00 <br />z <br />N <br />U <br />a <br />00 <br />A <br />w <br />w <br />W <br />ao <br />N <br />M <br />N <br />w <br />W <br />E <br />°�z <br />b�A <br />OO <br />m <br />� <br />OD <br />N <br />m <br />w <br />� <br />o� <br />w <br />� <br />a <br />SHEET TITLE <br />MEDICAL GAS <br />PLANS <br />SHEET <br />Pttttt>. <br />NUMBER <br />