Laserfiche WebLink
IF APPLICABLE, THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY PATRICK SULLIVAN, AIA AS INDICATED USING A DIGITAL SIGNATURE. <br />Note: The purpose of this Guideline Specification is to establish a minimum performance <br />G. Submittals: <br />M. BIDDING INSTRUCTIONS: NOTE: ALSO VERIFY ANY ADDITIONAL INFORMATION AT THE <br />standard for the basic Architectural requirements building components. In certain instances <br />1. Submit samples of the following items: <br />PREBID MEETING AND ANY SUPPLEMENTAL INSTRUCTIONS, TYP. <br />pre -established building standards or Owner directed use of a particular product or system <br />a. Wood stain samples for doors, finished wood paneling/ veneers and/or wood base. <br />may supersede the requirements of this specification. Not all sections of this guideline <br />b. Paint samples. 81/2 x 11 "draw downs" for every color used. <br />1. Unless otherwise noted, the owner owner's agent will be responsible for the <br />specification may apply to a particular project or scope of work as described on the <br />c. Suspended acoustical ceiling tile samples. <br />bidding and negotiation and selection <br />ion of the contractor. Questions regarding the <br />Architectural Coversheet and throughout the construction documents. This specification may <br />d. All specified carpets. <br />bidding schedule, format, and any other bid -related instructions shall be directed <br />contain certain project -specific information necessary for proper bidding and construction. <br />e. Stained concrete. <br />to the owner or owner's agent. <br />Please refer to any RFI emails under RE: PROJECT TITLE-RFI <br />The contractor (and their subcontractors) shall familiarize themselves with this specification <br />f. Vinyl composition tile and vinyl base. <br />2. Submission of bid is an acknowledgment by the contractor that he has read and <br />prior to submission of bid or commencement of the Work. Any questions regarding the contents <br />2. Submit complete shop drawings for the following: <br />understands the contents of this guideline specification and is in receipt of all <br />of this Guideline Specification shall be directed to the Architect in writing. <br />a. All structural items (concrete mix designs, wood trusses, steel or composite joist, metal <br />construction documents, addendums, owner prepared instructions to bidders, etc. <br />deck, handrails and guardrails). <br />Contractor shall list on their bid submission the drawing sheets used for bidding, <br />DIVISION 1 -GENERAL REQUIREMENTS <br />b. Toilet Partitions. <br />any addendums and associated issue dates (or revision dates). <br />A. Related Documents: <br />1. Drawings and General Provisions of the Contract apply to work of this Project and <br />c. Millwork including all upper and lower cabinets, hardware pulls, work counters, custom <br />VERIFY AND COORDINATE WITH VENDOR PACKAGE(s) PRIOR TO BID & <br />Specifications. <br />reception desk, credenza. <br />COORDINATE WORK TO BE PERFORMED IN A TIMELY MANNER. VERIFY <br />d. Fire sprinkler design. <br />W/ OWNER PRIOR TO ODER / INSTALLATION, TYP. <br />2. All product manufacturer's specifications and design dimensions, whether indicated on the <br />e. Inert gase fire suppression system. <br />plans or not, shall be included as part of this drawing package. <br />f. Glass door & hardware systems. <br />N. Closeout Requirements: <br />3. Patrick A. Sullivan, Architect, LLC will not be responsible for vendor engineered drawings or <br />g. Specialty glazing. <br />1. Submit written certification that the Contract Documents have been reviewed, work has <br />drawings produced by engineers not under contract with Patrick A. Sullivan, Architect, LLC. <br />3. Submittals shall consist of 3 sets of product information on 8-1/2 in. x 11 in, format with <br />been inspected and that work is complete in accordance with Contract Documents and <br />B. All work shall be done in accordance with the following: <br />all drawings to scale. Any structural submittals, shop drawings (i.e. concrete mix design, <br />ready for Architect/Engineer's review. <br />1. Building: Florida Building Code, 2020 Edition (RESIDENTIAL IF APPLICABLE), The Florida <br />wood trusses) shall be prepared and signed by a Florida registered engineer. <br />2. Provide an "Operation and Maintenance Instruction" Booklet containing the following <br />Building Code, Building. FLORIDA EXISTING BUILDING CODE 7TH EDITION (2020) IF APPLICABLE. <br />4. Shop drawings and schedules prepared by others shall be reviewed for the limited purpose <br />Closeout Documents to the Architect/Engineer/Owner. <br />2. Electrical: Florida Building Code 2020, Electrical and National Electrical Code, 2017 & NFPA 70. <br />of checking for conformance with the information given and the design concept expressed in <br />a. Section 1: Directory, listing names, addresses and telephone numbers of <br />3. Plumbing: Florida Building Code 2020, Plumbing. <br />the contract documents and shall not be construed to be part of the Contract Documents, <br />Architect/Engineer, Contractor, Subcontractors and major equipment suppliers. <br />4. Mechanical: Florida Building Code 2020, Mechanical. <br />as the Architect assumes no responsibility for drawings, schedules and/or specifications for <br />b. Section 2: Operation and maintenance instructions, arranged by system and <br />5. Fuel Gas: Florida BuildingCode 7TH EDITION 2020, Fuel Gas. <br />work on this Project prepared or accomplished by others. <br />subdivided by specification section. For each category, identify names, addresses and <br />6. Florida Fire Prevention Code, Latest Edition As Per Florida Bldg. Website. <br />g <br />telephone numbers of Subcontractors and suppliers. <br />7.2020 Florida Accessibility Code <br />Contractor sbusiness Architect/Engineer rev 5. Chall allow ten (10) busidays for the Architect/Engito <br />Significant design criteria <br />8. Ashrae Standard 90.1-2016 <br />submitted itContractor iresponsibleft ddtuntimely1). <br />ems. onracor s solely or any project due o any <br />9. All Federal, State and Local codes. <br />submittal of items for review not taking into account the allotted ten 10 day review time. <br />9 ( ) Y <br />2). List of equipment. <br />C. Base Information: <br />H. Product Substitutions: <br />3). Parts list for each component. <br />1. This drawing package is based on documents, specifications and related information <br />1. Request for changes in products, materials, equipment, and/or methods of construction <br />4). Operating instructions. <br />provided by the Lessee, Owner or Owner's Agent. Patrick A. Sullivan, Architect, LLC will not be <br />required by the Contract Documents proposed by the Contractor after award of the Contract <br />5). Maintenance instructions for equipment and systems. <br />responsible for the accuracy of the information (i.e. blue prints, as -built drawings, CADD <br />are considered requests for substitutions. <br />6). Maintenance instructions for (special) finishes, including recommended cleaning <br />files) provided by other sources. CONTRACTOR TO VERIFY ALL PRIOR TO BID. <br />2. Changes or substitutions will be considered if and when: <br />methods and materials, and special precautions identifying detrimental agents. <br />D. General Requirements: <br />a. Proposed changes are in keeping with the general intent of the Construction Documents. <br />c. Section 3: Project documents and certificates. <br />1. The Contractors shall be responsible for familiarizing themselves with the intent of the <br />b. The request is timely, fully documented and properly submitted. <br />1.) Shop drawings and product data. <br />drawings, final interpretation of the scope of work, building standards, schedules and deadlines <br />c. A substantial advantage is offered to the Owner or Owner's agent in terms of cost, time, <br />2). Final release of liens. <br />prior to bid submission and/or commencement of the work. The Contractor shall further be <br />energy or environmental conservation or other considerations of merit, after deducting <br />3). Certificates. <br />responsible for advising the Owner or Owner's agent of all long lead time items affecting the <br />offsetting responsibilities the Owner or Owner's agent may be required to bear. <br />4). Originals of warranties and bonds. <br />Project Schedule and shall upon request from the Owner or Owner's agent, submit order <br />I. Final Cleaning: <br />1. Employe experienced workers or professional cleaners for final cleaning. xP P 9 <br />3. Submit final Application for Payment identifying total adjusted Contract Sum. <br />4. Submit two copies of closeout booklet within 10 days after Substantial Completion. <br />confirmations and delivery dates for such long lead time items to the Owner or Owner's <br />2. Comply with manufacturer's instructions i.e, cleaning carpet, stripping and polishing of <br />agent. <br />resilient flooring. <br />DIVISION 2 -SITE WORK (NOT IN SCOPE OF WORK) <br />2. The Owner or Owners agent and Contractor shall be responsible for all phasing of the <br />Complete the following cleaning operations before requesting inspection for Certificate of <br />( Reference Civil or Site drawings if part of the drawing set.) <br />work.3. <br />3. The Contractor shall be responsible for field verifying all existing work or items which are <br />Substantial Completion: <br />a. Remove labels and associated adhesive that are not permanent labels. <br />A. Trenching, Back filling and Compaction: <br />1. The General Contractor will be responsible for any trenching, back filling and <br />to remain, and determining whether or not it can be repaired and/or reconditioned to match <br />b. Clean transparent materials, including mirrors and glass in doors and windows. <br />compaction relative to the Work. The Contractor shall coordinate all excavation activities <br />and blend with new materials and components. <br />c. Remove glazing compound and other substances that are noticeable vision -obscuring <br />with all potential Owner's of underground facilities in the areas to be excavated. Unless <br />4. All work shall be warranted satisfactory, in materials and workmanship, for a minimum <br />materials. <br />otherwise noted in the contract documents, all utility services shall remain in service <br />period of one (1) year from the date of final payment by the Owner for all work under the <br />d. Replace chipped or broken glass and other damaged transparent materials. <br />during construction without interruption. <br />Contract, or for the period of warranty customary, or stipulated for, the trade, craft or <br />e. Clean exposed exterior and interior hard surface finishes to a dust -free condition, free of <br />a. Soil Compaction shall be 95% of laboratory density (FM1-T166). <br />product, whichever is longer. <br />stains, films, and similar foreign substances. <br />b. Cost of Compaction testing shall be bome by the General Contractor. <br />5. Disruptive or potentially hazardous construction activities shall be coordinated to occur <br />f. Leave concrete floor surfaces broom dean. <br />2. Sterilization: Contractor shall procure and pay for all tests and water required for <br />after normal office hours, so as to minimize disturbances to building occupants. Landlord and <br />g. Vacuum carpeted surfaces. <br />sterilization and tests required for all equipment, pipelines, tanks and other parts of the <br />tenants shall be notified prior to such activities that would include, but is not limited to, the <br />h. Wipe surfaces of mechanical and electrical equipment. <br />project with which water comes in contact and which have been contaminated by the <br />x-ray of existing post tensioned floor slab and floor core drilling, if required. <br />i. Clean plumbing fixtures to a sanitary condition. <br />Contractor after completion of construction. <br />6. The Contractor shall coordinate with the Building Owner or Building Owner's agent for <br />j. Clean the site, including landscaping development areas, of rubbish, litter, and other foreign <br />delivery to the space of all building materials, and shall arrange for usage of the freight <br />substances (if applicable). <br />SITE: <br />elevator (or such elevator designated). If delivery of building materials involves the use of <br />k. Install new mechanical air filters at the conclusion of all cleaning activities. <br />1. Utilities Locations: The Contractor shall verify the locations, elevations, and <br />facilities other than the available elevators, the Contractor shall coordinate such activities <br />J. Contractor's Liability: <br />dimensions of all existing utilities affecting this work prior to construction. The <br />in a manner that poses no hazard to any personnel within or around the building or building site. <br />1. Contractor hereby assumes the entire responsibility for all Work, supervision, labor and <br />Owner shall be notified of any discrepancies. <br />Costs to repair damage caused to the elevators, corridors or other common areas during <br />materials provided here under, whether or not erected in place, and for all plant, scaffolding, <br />2. Utilities Protection: The Contractor shall use extreme caution in areas of buried <br />construction shall be borne by the General Contractor. Provide Building owner 24 hour <br />tools, equipment, supplies and other things provided by Contractor until final acceptance of <br />utilities and shall provide at least 48 hours notice to the utility companies prior to <br />notification for any shut down of building systems, services or disruptions to building <br />the work by owner. The contractor shall also be responsible at its sole <br />construction to obtain field locations of existing underground utilities. The <br />occupants i.e. fire sprinklers, fire alarm, water shut off, etc. <br />cost and expense for all measures necessary to protect any property or tenant adjacent to <br />Contractor shall protect and maintain operation of existing utility services during <br />7. General Contractors and all Subcontractors shall verifyall existing dimensions and all <br />9 <br />the Work. In the event of any loss, damage, or destruction thereof from any cause, and <br />except to the extent that Owner provides Builders Risk Insurance coverage for such loss, <br />construction. <br />existing conditions in the field. Any discrepancies shall be reported to the Owner or Owner's <br />damage destruction at Contractors sole cost and expense. In the event damage to the <br />3. Damage: The Contractor is responsible for repairing an damage to existing <br />agent and Architect. Under no circumstances shall the Contractor scale the drawings to <br />o <br />Work is covered by any insurance policy provided by the Owner, Contractor will pay the <br />facilities, above or below round, that may occur s a result of the work performed <br />9 Y <br />determine the dimensions. Dimensions are shown from face drywall of gypsum board <br />deductible amount. <br />by the Contractor. <br />construction, unless otherwise noted. <br />2. Contractor shall be liable for all costs Owner incurs as a result of Contractor's failure to <br />4. Grading: The site shall be initially grades such that no off -site area will be <br />8. Prior to bidding General Contractor is required field survey area of proposed construction <br />perform this Contract in accordance with its terms. Contractor's failure to perform shall <br />adversely affected by storm water runoff. All areas shall be protected from erosion <br />to identify any building maintenance deficiencies. (i.e. lighting ballasts, lenses or diffusers, <br />include the failure of its suppliers or subcontractors of any tier to perform. Contractor's <br />y storm water runoff. The final grades to be as shown on site Ian. The <br />caused b g p <br />cleanliness, broken glazing, mini -blind repair or replacement, or building systems). List is to <br />liability shall include, but not be limited to: <br />owner to furnish sod and irrigation. <br />be supplied to Building Owner or Owner's agent before construction. <br />a. Damages and other delay costs suffered by Owner. <br />9. The Architect shall not be responsible for any deviation from these drawings as dated on <br />b. Owner's increased costs of performance, such as extended overhead and increased <br />the sheets. The Architect assumes no liability for the condition of the existing Building Shell <br />performance costs resulting from Contractor caused delays or improper Contractor work. <br />or soundness of the existing Building Systems (roofing, mechanical, electrical, plumbing and <br />c. Warranty and rework costs. <br />fire protection/alarm etc.) <br />d. Liability to third parties including the Architect, and other design professionals under <br />10. When limited scope of Construction Administration (CA) is provided, Patrick A. Sullivan, <br />contract with the Architect. <br />Architect, LLC and Patrick Sullivan, Architect of Record is not responsible for interpreting the <br />e. Attorney's fees and related costs. <br />intent of the Construction Documents including making modifications as may be necessary <br />K. Indemnification: <br />during the construction phase & that the Architect of Record is no longer liable for the work <br />1. To the fullest extent permitted by law, the Contractor shall indemnify, hold harmless and <br />where changes to these documents have been made. <br />defend the owner, Architect and all of their agents and consultants, directors and <br />E. Demolition: <br />employees ("Indemnities") from and against all claims, damages, demands, losses, expenses, <br />1. The General Contractor or Subcontractor shall be held responsible for the removal and the <br />causes of action, suits or other liabilities (including all costs and reasonable attorneys' <br />proper disposal of materials and items referred to as "debris" or determined by the Owner or <br />fees), arising out of or resulting from the performance of Contractor's Work under the <br />Owner's agent or Architect to be refused. <br />Contract, provided any such claim, damage, delay, loss or expense is attributable to bodily <br />2. The General Contractor shall coordinate all demolition activities with the Owner or Owner's <br />injury, personal injury, sickness, disease or death, or to injury to or destruction of tangible <br />agent and shall construct visquene dust barriers and block -off return air grills, as well as <br />property, including the loss of use resulting there from, to the extent caused in whole or in <br />filter media on all applicable mechanical equipment, as required so as to contain as much <br />part by any negligent act or omission of the Contractor or anyone directly or indirectly <br />airbome debris as possible and shall utilize adhesive type walk -off mats to minimize the <br />employed by him or anyone for whose acts Contractor may be liable, regardless whether it <br />tracking of construction dust. General Contractor shall coordinate any power shut downs with <br />is caused in part by an Indemnities. This indemnification shall not be limited in any way by <br />the Owner or Owner's agent. General Contractor shall provide his own dumpster and shall <br />any limitation on the amount or type of damages, compensation or benefits payable by or <br />obtain and include in their contract price all necessary disposal permits and fees as required <br />for the Contractor under any workers' compensation acts, disability benefits acts or other <br />by the Local Authorities. <br />employee benefits acts. This indemnification shall be in addition to any indemnity liability <br />3. Remove all specific items indicated on drawings, also remove any other items or <br />imposed by the contract documents. Contractor is obligated to maintain adequate <br />construction as required to accomplish all new work and/or revision work to existing areas as <br />contractual liability insurance to secure this indemnification obligation. <br />shown or described elsewhere in the contract documents. <br />2. Contractor will have all subcontractors agree to indemnify the Indemnities in the same <br />4. The General Contractor shall provide and install signs, all barricades, fences, safety lighting, <br />manor the Contractor has agreed to indemnify the Indemnities under Div. 1, paragraph K.1. <br />scaffolding, and other means of protection as required to comply with all State laws, O.S.H.A. <br />3. Contractor's assumption of liability is independent from, and not limited in any manner <br />requirements and local ordinances to safeguard property, the Owner, its clientele, employees, <br />by, the Contractor's insurance coverage that is required by the Owner or Owner's agent. <br />representatives and others within the areas of construction. <br />L. Changes and Claims: <br />5. General Contractor shall take ordinary precautions to secure and protect materials. <br />1. Contractor shall submit in writing to Owner any claims for adjustment in the price, <br />Materials are to be relocated or warehoused as determined by Owner or Owner's agent or <br />schedule or other provisions of the contract claimed by the Contractor for changes directed <br />Architect. <br />by the Owner, or for damages for which the Owner is liable, or as a result of deficiencies <br />6. Contractor to remove all walls shown on demolition plan from floor to deck. Contractor to <br />or discrepancies in the Contract Documents, within five (5) days of the beginning of the <br />remove any existing abandoned portions of walls, studs or bracing above ceiling plane. Price <br />event for which claim is made. If requested by Owner, Contractor shall furnish complete <br />as separate line item. <br />substantiation of any claim within ten (10) days of Owner's request, otherwise such claim <br />7. Remove any existing PVC piping (drains or supply) within plenum. <br />shall be deemed waived. <br />F. Cutting and Patching: <br />2. The Owner shall have the right to order extra work to be performed on lump sum, unit <br />1. It is extremely important that the Contractor verify existing concealed conditions prior to <br />rates or time and material basis. All changes and claims will be priced on the basis of the <br />drilling and/or removing existing concrete slabs. <br />unit rates set forth on a Contractor supplied Schedule of Values to the extent applicable. <br />2. Provide all cutting and patching in existing floors, walls, and ceilings as required for all <br />All unit rates will remain valid for the duration of the Project. For adjustments to the <br />trades, excluding removal and relocation of items shown. <br />contract price which are based on other than lump sum, the Contractor agrees to charge <br />3. Patch, repair, and/or replace all adjacent construction which has been damaged during <br />no more than 5% for profit and 10% for overhead. <br />SPECIFICATIONS <br />demolition and/or new construction. <br />3. Pending resolution of any claim, dispute or other controversy nothing shall excuse the <br />4. Fill and/or fill smooth all projections and voids in existing floors and walls as required for <br />Contractor from proceeding with prosecution of the Contract Work. <br />SCALE: N. T. S . <br />all new finish, patch work and repairs. <br />5. Inspect and patch existing fire rated partitions. General Contractor shall label all fire rated <br />partitions above the ceiling line in the areas of construction. <br />6. Patch and repair all areas affected by demolition with the same materials and methods to <br />match existing construction. <br />0 <br />w <br />�Zo <br />N <br />n W O <br />! Y m N <br />d O Z <br />N ~ O <br />- <br />a�P <br />30 <br />ZZw <br />o=z <br />QO� <br />U Q O <br />Now <br />0 N Z <br />Z50 <br />awe <br />Zam <br />allo <br />�C Y_ <br />UJ <br />w <br />U� <br />Z <br />W = U <br />U Cc Z <br />} O Q <br />°W°Wa <br />2CY- <br />m U <br />H <br />W <br />W <br />J <br />Q <br />3 <br />0 <br />0 <br />O <br />O <br />U <br />0 <br />Ld <br />N <br />W <br />V) <br />a <br />U <br />J <br />U <br />U <br />a <br />Z <br />Q <br />J <br />d <br />`U <br />0- <br />CD <br />N <br />H <br />_ <br />c� <br />0 <br />U <br />v' <br />Jcc <br />(�Q0Q <br />Q <br />P�J <br />0 <br />o <br />Q � <br />(Z Q <br />C <br />U <br />LLLJ <br />�LLJN <br />W <br />U� V) L!� <br />4-J <br />00 LL <br />0 <br />z I cn <br />0 __J <br />D <br />0 c�3 <br />LJ N <br />F- O <br />O <br />DATE: 04/M/2021 <br />DRAUN: J111S. <br />CHECKED: P.A.S. <br />PROJECT: 2102 <br />SHEET NUMBER <br />AO-01 <br />2 OF 12 <br />