Laserfiche WebLink
I <br />FIELD COORDINATION NOTE <br />EVERY CONTRACTOR SHALL COORDINATE IN FIELD W/ OTHER TRADES PRIOR START <br />OF CONSTRUCTION FOR THE STRUCTURAL BEAM, SLAB, TRUSSES, ARCHITECTURAL <br />DETAILING AS PRE-FAB FORMS, REVELING, CEILINGS, ARCH WITH THE LOCATION <br />OF CEILING OR WALL GRILLES, DUCT WORKS, RETURN GRILLES, LIGHTING FIXTURES, <br />SWITCHES, RECEPTACLES OR ANY OTHER DEVICES. AND TO NOTIFY ARCHITECT/ <br />ENGINEERS IF ANY CONFLICT OCCUR PRIOR ITS INSTALATION, NO ADDITIONAL COST <br />TO OWNER CAN BE APPLIED. <br />SCOPE OF WORK: <br />THIS JOB CONSIST OF INTERIOR REMODELING FOR AN EXISTING TENANT <br />SPACE. A NEW BATH AND A NEW SINK ARE BEING PROVIDED.. <br />2"4 AIR ADM�TANCE <br />VALVE <br />NEW I.W.H (POINT OF <br />USE UNDER LAV.) <br />EXISTING SEWER LINE �_ - - - - - \ <br />3" O(7FU: <br />SPECS <br />IN COMPLIANCE W/F.B.0 : <br />SHALL BE "TITAN-SCR2 N-42" ELECTRONIC TANKLESS <br />WATER HEATER. <br />TI�gN, <br />MODEL: N-42, 4.2 KW, 240V / I- / 60 Hz, 20 AMPS <br />WEIGHT: 8 POUNDS <br />C'`42 c� <br />COMPLIANCE: UL #499 <br />STANDARD: ANSI-Z, 10.03 <br />TESTED: APPLIED RESEARCH LAB29-580 <br />MIAMI-DADE NOA f 97-0627.16 <br />DIMENSIONS 7" W X 10" H X 2-3/4 D <br />ENERGY EFFICIENCY: UP TO 97 % <br />* NO R.V.D OR OVER FLOW REQUIRED AS PER <br />MANUFACTURER SPECS. <br />INSTANT WATER HEATER DETAIL <br />N.T.S. <br />3" O(YU) <br />VACANT SPACE (7898) <br />1136 SF APPROX. <br />jL�2-0(2`F'U') TEST <br />BOOTH <br />EXISTING 2" 0 C.W <br />SERVICE. <br />i <br />TEST <br />I <br />I BOOTH <br />i <br />2 <br />1-1 /2" 0(1 FU) <br />s LAV. <br />2"0(1 FU) O <br />� 0 <br />wC <br />" 4FU <br />JERSEY MIKE'S SUBS <br />PLUMBING FLOOR PLAN <br />SCALE: 1 /4"=1'-0" <br />REVISIONS: <br />No. /DATE: <br />No./DATE: <br />THESE DRAWING & SPECIFICATIONS ARE <br />INSTRUMENTS OF SERVICE AND SHALL <br />REMAIN THE PROPERTY OF MDS <br />ENGINEERING CORP. WHETHER THE <br />PROJECT FOR WHICH THEY WERE <br />PREPARED IS EXECUTED OR NOT, THEY <br />ARE NOT TO BE USED IN ANY MANNER <br />ON OTHER PROJECTS OR EXTENSIONS <br />TO THIS PROJECT EXCEPT BY <br />AGREEMENT IN WRITING AND WITH THE <br />APPROPRIATE COMPENSATION TO MDS <br />ENGINEERING CORP. IS PROHIBITED. <br />CONTRACTOR IS RESPONSIBLE FOR <br />VERIFYING ALL SITE CONDITION PRIOR <br />TO PROCEEDING WITH WORK. <br />It <br />�.w o�c .zo <br />Ck <br />d•.• <br />Q <br />U <br />L� c <br />4 <br />M CD <br />ono W Q CD <br />►-.� �., w <br />CD <br />ZQ <br />Z <br />Q rn >- 00 <br />00 <br />V1 Q O u� <br />O � J L�J <br />o z <br />N U a_ <br />JOB No.: <br />DRAWN BY: M.D.S <br />SCALE: AS SHOW <br />DATE: 10-26-2013 <br />SHEET NAML: <br />PLUMBING PLAN <br />p=1 <br />SHEET 6 OF 7 <br />MDS FNGINFFRING CORPORATION <br />