Laserfiche WebLink
PROVIDE PLUG FOR <br />MAINTENANCE <br />PROVIDE CLEANOUT AT EACH <br />CHANGE OF DIRECTION OR EVERY 30' <br />DRAIN LINE. SLOPE <br />A WITH FLOW 1/8"/FT <br />TO LOCATION SHOWN <br />A ON DRAWINGS <br />A = FAN SUCTION PRESSURE + 1 INCH <br />CONDENSATE CONDENSATE PIPE <br />PIPE SIZE SIZE BELOW SLAB <br />MAX. TONS ABOVE SLAB OR BELOW GRADE <br />2 3/4" 1-1/4" <br />5 1" 1-1/2" <br />30 1 1/4" 2" <br />Condensate Drain Trap Detail <br />SCALE:NTS <br />#12 TEK <br />SCREW (TYP.) - <br />ROOF MEMBRANE <br />CEMENT --� <br />�1 WeAft:7\] <br />SCHEDULE 40 PVC <br />CONDENSATE PIPING <br />MICRO PIPE SUPPORT <br />ROOF SYSTEM <br />3 Condensate Pipe Support On Roof <br />SCALE:NTS <br />/B-H <br />B-G ) <br />C <br />rx <br />NOTE: <br />PRE-ENGINEERED CURB BY <br />RTU SUPPLIER <br />2 RTU Tie Down Detail <br />SCALE:NTS <br />ALUM. THRU WALL SCUPPER <br />ROOF DRAIN COLLECTOR-/ <br />DOWN SPOUT. TIED DIRECTLY <br />INTO STORM DRAINAGE UNDER <br />GROUND. RE: ARCH ROOF <br />PLAN FOR CONT. <br />NAILER SUPPLIED W/ CURB, ATTACH <br />TO CURB AS PER MANUFACTURER'S <br />RECOMMENDATIONS / SPECS. <br />:7�I1 <br />SECURE CURB TO STEEL FRAME <br />USING #12 TEK SCREWS, 2 @ EA. <br />CORNER & 12" O.C. BTW. <br />STL. DECK <br />Ly <br />MICRO -HOLD <br />(8 MIN.) <br />(2 EA. SIDE) <br />MICROMETL, 16 GA. MICRO -HOLD <br />HOLD DOWN. ATTACH TO UNIT RAIL <br />REF: MANUF. FOR INSTALLATION <br />REQUIREMENTS <br />REFER TO ARCHITECTURAL <br />DRAWINGS FOR WALL AND <br />ROOF TYPE <br />I CONDENSATE LINE <br />4 Condensation Termination Detail <br />SCALE:NTS <br />ROOF TOP <br />UNIT <br />SCHEDULE <br />COOLING <br />EQUAL <br />TO <br />FAN <br />COMPRESSOR(S) <br />ELECTRIC HEATER <br />CAPACITY <br />CFM <br />OIA <br />E.S.P. <br />(IN.) <br />HP <br />V/0 <br />FLA <br />QTY, <br />V/0 RLA <br />LRA <br />KW <br />CONTROL <br />V/0 <br />STAGES <br />TC <br />(MBH) <br />SC <br />(MBH) <br />AMBIENT <br />DB °FIWB °F <br />ENTERING <br />DB °FIWB °F <br />MARK <br />AREA NOMINAL <br />SERVED TONS <br />MCA <br />MOCP <br />WEIGHT <br />(LBS.) <br />SEER <br />[EER] <br />MFG. <br />MODEL <br />NOTES <br />RTU-1 - RTU-2 <br />RETAIL B 4 <br />1600 <br />400 <br />0.6 <br />1.0 <br />208/30 <br />5.0 <br />1 <br />208/30 14.6 <br />91.0 <br />4.5 <br />1 208/30 <br />25.2 <br />35 <br />625 <br />49.4 <br />37.3 <br />95180 <br />80/67 <br />13.0 <br />TRANE <br />THC043A3 <br />(1)-(8) <br />RTU-3 <br />RETAIL B 5 <br />2000 <br />430 <br />1.2 <br />1.0 <br />208/3 <br />5.0 <br />1 <br />208/3 18.6 <br />128.0 <br />9.0 <br />2 208/3 <br />39.0 <br />50.0 <br />750 <br />63.1 <br />48.2 <br />95/80 <br />80/67 <br />13.0 <br />TRANE <br />THC063A3 <br />(1)-(8) <br />RTU-4 - RTU-8 <br />RETAIL B 4 <br />1600 <br />400 <br />0.6 <br />1.0 <br />208/30 <br />5.0 <br />1 <br />208/30 14.6 <br />91.0 <br />4.5 <br />1 208/30 <br />25.2 <br />35 <br />625 <br />49.4 <br />37.3 <br />95/80 <br />80/67 <br />13.0 <br />TRANE <br />THC043A3 <br />(1)-(8) <br />RTU-9 - RTU-10 <br />RETAIL B 5 <br />2000 <br />430 <br />1.2 <br />1.0 <br />208/3 <br />5.0 <br />1 <br />20813 18.6 <br />128.0 <br />9.0 <br />2 20813 <br />39.0 <br />50.0 <br />750 <br />63.1 <br />48.2 <br />95/80 <br />80/67 <br />13.0 <br />TRANE <br />THC063A3 <br />(1)-(8) <br />RTU-1 1 <br />RETAIL B 6 <br />2400 <br />430 <br />0.8 <br />1.0 <br />208130 <br />5.0 <br />1 <br />208/30 19.0 <br />156.0 <br />13.5 <br />1 208/30 <br />53.1 <br />60 <br />800 <br />71.7 <br />53.6 <br />95/80 <br />80/67 <br />10.3 <br />TRANE <br />THC072A3 <br />(1) - (8) <br />NOTES: (1) <br />REFER TO CONTROL SYSTEM NOTES FOR CONTROL COMPONENTS REQUIREMENTS. <br />(2) <br />PROVIDE 5-MINUTE ANTI -SHORT CYCLE TIMER. <br />(3) <br />PROVIDE THRU THE BASE ELECTRICAL AND SINGLE POINT CONNECTION, POWERED CONVENIENCE <br />OUTLET PER MANUFACTURER'S INSTRUCTIONS. <br />(4) <br />PROVIDE WITH FACTORY FILTERS. <br />(5) <br />PROVIDE WITH FACTORY ROOF CURB AND OUTSIDE AIR INTAKE HOOD WITH MANUAL DAMPER. <br />(6) <br />PROVIDE WITH STARTER. <br />(7) <br />PROVIDE WITH FACTORY INSTALLED DISCONNECT. <br />(8) <br />PROVIDE UNIT WITH HAIL GUARD. <br />REAR <br />MECHANICAL GENERAL NOTES <br />1. CONTRACTOR TO VISIT SITE AND VERIFY ALL CLEARANCES BEFORE FABRICATION OF DUCTWORK AND PROVIDE ADDITIONAL OFFSET <br />AND/OR CHANGES IN DUCT SIZES TO MEET FIELD CONDITIONS AND COORDINATE WITH ELECTRICAL, PLUMBING AND FIRE PROTECTION <br />SUBCONTRACTOR BEFORE ANY CONSTRUCTION WORK. <br />2. SUPPLY, RETURN AND OUTSIDE AIR DUCTWORK SHALL BE EXTERNALLY INSULATED SHEET METAL CONSTRUCTION IN ACCORDANCE WITH <br />LATEST SMACNA STANDARDS. INSULATION SHALL HAVE VAPOR BARRIER AND AN INSTALLED MINIMUM THERMAL RESISTANCE (R) VALUE OF <br />6.0. ALL EXHAUST DUCTWORK SHALL BE UNINSULATED SHEET METAL CONSTRUCTION IN ACCORDANCE WITH LATEST SMACNA <br />STANDARDS. ALL JOINTS SHALL BE SECURELY TAPED WITH 3" WIDE GLASS FABRIC TAPE WITH FOSTER 30/35 MASTIC OR EQUAL. <br />3. DUCT SHALL BE SECURELY SUPPORTED, HUNG OR SUSPENDED IN ACCORDANCE WITH THE LATEST SMACNA EDITION AND SECTION 603 OF <br />THE FLORIDA BUILDING CODE MECHANICAL 2004 & FLORIDA BUILDING CODE 2006 SUPPLEMENT, <br />4. ROOF TOP UNIT OUTSIDE AIR INTAKE SHALL MAINTAIN A MINIMUM OF 10'-0" FROM ANY EXHAUST OR SANITARYVENT THROUGH ROOF <br />PIPING. ALL TRANSFER DUCTWORK LEADING TO REST ROOMS SHALL HAVE A ZERO LEAKAGE BACK DRAFT DAMPER AS SHOWN ON <br />MECHANICAL DRAWINGS. <br />5. PROVIDE ALL MECHANICAL EQUIPMENT WITH MANUFACTURER'S RECOMMENDED SERVICE AREA CLEARANCES. <br />6. ALL ROOF TOP UNITS SHALL BE REINFORCED TO WITHSTAND LOCAL WIND LOAD DESIGN. SEE STRUCTURAL DRAWING(S) FOR DETAIL(S) <br />/CONSULT WITH BUILDING STRUCTURAL ENGINEER. <br />7. DUCT SMOKE DETECTORS SHALL BE FURNISHED BY THE FIRE ALARM CONTRACTOR, INSTALLED IN DUCT BY THE MECHANICAL <br />CONTRACTOR AND WIRED BY THE FIRE ALARM CONTRACTOR. SMOKE DETECTORS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 72, <br />NATIONAL FIRE ALARM CODE; NFPA 90A, STANDARD FOR INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS, THE FLORIDA <br />BUILDING CODE 2004 AND THE MANUFACTURER'S INSTALLATION IN STRUCTIONS. COORDINATE LOCATION OF SMOKE DETECTORS WITH <br />FIRE ALARM CONTRACTOR. <br />8. IN GENERAL, PLANS AND DIAGRAMS ARE SCHEMATIC ONLY AND SHOULD NOT BE SCALED. <br />9. HVAC CONTRACTOR IS RESPONSIBLE FOR ANY ADDED ELECTRICAL COSTS WHICH MAY RESULT FROM SUBSTITUTED EQUIPMENT. <br />10. DUCTWORK INSULATION SHALL BE FOIL FACED FIBERGLASS DUCT WRAP WITH A MINIMUM THERMAL RESISTANCE (R) OF 6.0. INSULATION <br />SHALL HAVE VAPOR BARRIER. INSTALL PER MFR. REQUIREMENTS. <br />11. DUCT DIMENSIONS SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS. DUCTWORK, DIFFUSERS, REGISTERS, GRILLES, AND OTHER <br />ITEMS OF THE AIR HANDLING SYSTEM SHALL NOT BE SUPPORTED BY THE CEILING OR CEILING SUSPENSION SYSTEM. <br />12. CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL EQUIPMENT AND MATERIALS. <br />- , INSTALLATION OF THE EQUIPMENT SHALL COMPLY WITH THE MANUFACTURER'S SPECIFICATIONS AND CLEARANCE REQUIREMENTS FOR <br />�B 131 8=16� SERVICING OF EQUIPMENT. <br />/ 13. VERIFY VOLTAGE WITH ELECTRICAL CONTRACTOR BEFORE ORDERING EQUIPMENT. <br />14. PROVIDE A TRAP IN ALL CONDENSATE PIPING LOCATED AT AIR HANDLING UNITS. SLOPE CONDENSATE LINES 1/8" PER FOOT. CONDENSATE <br />LINES SHALL BE PVC SCH. 40. ALL CONDENSATE DRAIN PIPING SHALL BE PROPERLY SUPPORTED. SEE "CONDENSATE DRAIN TRAP" DETAIL. <br />O 15. ALL MECHANICAL WORK SHALL MEET ALL THE REQUIREMENTS OF THE "FLORIDA BUILDING CODE 2004 - MECHANICAL" & FLORIDA BUILDING <br />CODE 2006 SUPPLEMENT. <br />B-K <br />-' 16. GUARANTEE; FOR ONE YEAR AFTER DATE OF ACCEPTANCE BY THE OWNER, ALL EQUIPMENT, MATERIALS AND WORKMANSHIP TO BE FREE <br />MECHANICAL KEY PLAN NOTES: <br />III FROM DEFECT. <br />17. DO NOT CUT STRUCTURAL MEMBERS WITHOUT PRIOR WRITTEN APPROVAL OF THE STRUCTURAL ENGINEER OR ARCHITECT. ARRANGE FOR <br />- REPAIRS REQUIRED TO RESTORE OTHER WORK, BECAUSE OF DAMAGE CAUSED AS A RESULT OF MECHANICAL INSTALLATIONS. <br />D COORDINATE EXACT LOCATION OF MECHANICAL UNITS WITH ARCHITECTURAL `r \ <br />AND STRUCTURAL DRAWINGS. REFER TO RTU CURB DETAIL ON MECHANICAL \ I it 18. ALL WALL MOUNTED THERMOSTATS SHALL BE INSTALLED AT AN ELEVATION OF 54" ABOVE FINISHED FLOOR TO THE TOP UNLESS <br />DETAIL SHEET AND STRUCTURAL DRAWINGS FOR RTU INSTALLATION. ! OTHERWISE NOTED ON DRAWINGS. LOCATION OF THE WALL MOUNTED THERMOSTAT SHALL BE COORDINATED WITH OTHER TRADES FOR <br />COORDINATE WITH MANUFACTURER'S RECOMMENDATIONS. �I I! A NEAT APPEARANCE. FINAL LOCATION OF THERMOSTAT SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER OR HIS <br />RUN CONDENSATE FROM MECHANICAL UNITS TO ROOF DRAIN/GUTTER AND REPRESENTATIVE IN THE FIELD. <br />D <br />TERMINATE WITH APPROVED AIR GAP. REFER TO ARCHITECTURAL ROOF PLAN <br />FOR LOCATION OF DRAINS/GUTTER. �- �) 19. ALL UNITS SHALL BE BALANCED TO WITHIN 10 PERCENT OF THE DESIGN AIR QUANTITY. BALANCE DIFFUSERS AND REGISTERS TO WITHIN <br />T .� 1 li 10 PERCENT OF QUANTITIES SHOWN ON DRAWINGS. <br />3 REFER TO CONDENSATE TRAP DETAIL ON MECHANICAL DETAIL SHEET FOR 1 114" 4 <br />20. PROVIDE FLEXIBLE NEOPRENE DUCT CONNECTORS ON THE DISCHARGE AND ENTERING SIDES OF ALL VIBRATING EQUIPMENT TO WHICH <br />PIPE SIZE. REFER TO PIPE SUPPORT DETAIL ON MECHANICAL DETAIL SHEET <br />FOR INSTALLATION. (� 3� D x� 6 DUCTWORK IS ATTACHED. <br />�r 7 21. CONTRACTOR SHALL PROVIDE 3 COPIES OF A TEST AND BALANCE REPORT. AIR BALANCING SHALL BE PERFORMED BY AN INDEPENDENT <br />4 INSTALL FLEXIBLE CONNECTIONS BETWEEN ALL DUCT WORK AND TESTING AND BALANCING CONTRACTOR WHICH SHALL BE QUALIFIED AND CERTIFIED BY EITHER ASSOCIATED AIR BALANCE COUNCIL <br />MECHANICAL UNITS. it 8 (AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). THIS REPORT MUST BE REVIEWED AND APPROVED BY THE ENGINEER <br />PRIOR TO THE FINAL INSPECTION. <br />D REFER TO MECHANICAL ROOF TOP UNIT DETAIL AND STRUCTURAL DRAWINGS j RTU-11 <br />FOR MECHANICAL EQUIPMENT TIE DOWN DETAILS. COORDINATE WITH <br />MANUFACTURER'S RECOMMENDATIONS. -ll 0 ( 22. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL TRADES' INSTALLATION SCHEDULES. COORDINATE WORK SCHEDULE WITH <br />I 'I GENERAL CONTRACTOR. <br />INSTALL SMOKE DUCT DETECTOR IN SUPPLY DUCTS. <br />23. WHEN THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS NOT CLEAR, OR IS CAPABLE OF MORE THAN ONE INTERPRETATION, SUCH <br />PROVIDE PROGRAMMABLE THERMOSTAT FOR EACH MECHANICAL UNIT TO BE r B-J } MATTERS WILL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER IN WRITING BEFORE THE SUBMISSION OF BIDS. THE <br />ARCHITECT/ENGINEER SHALL MAKE CORRECTION OR EXPLANATION IN WRITING. <br />LOCATED AND INSTALLED BY FUTURE TENANT. <br />Ij 1! <br />PROVIDE SUPPLY AND RETURN DUCT DROPS INTO SPACE AND CAP FOR 24. PLANS AND SPECIFICATIONS ARE INTENDED AS A GENERAL DESCRIPTION OF THE WORK TO BE PERFORMED. ALL ITEMS NOT <br />FUTURE TENANT CONNECTION. ;I SPECIFICALLY MENTIONED OR SHOWN, BUT NECESSARY FOR THE COMPLETION OF THE INSTALLATION, SHALL BE FURNISHED AND <br />(l INSTALLED BY THIS CONTRACTOR. THIS CONTRACTOR SHALL THOROUGHLY ACQUAINT HIMSELF WITH THE MECHANICAL, ARCHITECTURAL, <br />j STRUCTURAL AND ELECTRICAL PLANS BEFORE SUBMITTING HIS FINAL BID. NO ADDITIONAL COMPENSATION WILL BE ALLOWED DUE TO <br />THE CONTRACTOR'S FAILURE TO FAMILIARIZE HIMSELF/ HERSELF WITH THE PLANS. <br />HVAC LEGEND <br />! ! SYMBOL DESCRIPTION <br />III �u <br />NEW DUCTWORK <br />T <br />1" I 4 <br />5 <br />- - - --� 6 FLEXIBLE DUCT <br />DUCTWORK UP THRU PLAN <br />- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br />`B-H <br />DUCTWORK TRANSITION <br />MANUAL AIR VOLUME CONTROL DAMPER <br />® SUPPLY AIR DEVICE <br />F] \ / z RETURN AIR DEVICE <br />/ :L ® EXHAUST AIR DEVICE <br />WALL MOUNTED THERMOSTAT <br />❑ I ! SD DUCT SMOKE DETECTOR <br />CONDENSATE PIPING <br />j -- - j---� ij TYPICAL SEQUENCE OF OPERATION <br />�����1a ����El0 �� ���0 0� <br />I � B-G <br />THE A/C UNIT SHALL BE STARTED AND STOPPED FROM A ROOM THERMOSTAT. <br />r- T 1 1 T - T 1 T -� 1 T -� 1 _, <br />�I� 4 4 1" 1" 4 1" 1" � 4 'I ON A CALL FOR COOLING, THE THERMOSTAT SHALL ENERGIZE THE <br />3 SD �I 5 5 SD �� 3 CO 3 SD �I 5 CO 3 SD �I 5 CO 3 p x�� 5 COMPRESSOR(S) TO MAINTAIN SET POINT. ON ACALL FOR HEATING, THE <br />6 LgTHERMOSTAT SHALL ENERGIZE THE ELECTRIC HEAT IN STAGES) TO MAINTAIN <br />6 6ULE-:�J 6 � j SET POINT. SUPPLY FAN SHALL RUN CONTINUOUSLY DURING OCCUPIED HOURS. <br />RIGHT 1 Mechanical Roof Plan <br />Scale 1/8"=1'-0" <br />�N <br />FRONT <br />OUTSIDE AIR CALCULATION <br />RETAIL FLOOR AREA <br />AREA (SF) <br />CFM/S.F. (1) <br />CFM <br />REQUIRED <br />CFM <br />SUPPLIED <br />RETAIL B <br />15,066 <br />0.3 <br />4520 <br />4520 <br />(1) PER TABLE 403.3 - FLORIDA BUILDING CODE- MECHANICAL 2004 <br />17111■ <br />Gi111■ <br />DRAWING LIST <br />NO. TITLE <br />M001 Mechanical Roof Plan, Notes, Schedules & Details <br />Imo n-mmmmr 1 <br />r r r <br />F'11_11 <br />S Hwy 301 <br />' <br />Key Plar <br />Fj <br />F_ <br />x <br />CD <br />a <br />U <br />N <br />7b <br />a0) <br />w <br />U <br />� <br />g� <br />o <br />H� <br />�.b .0 <br />o <br />U <br />�w <br />w <br />�o <br />.� <br />o <br />do0 <br />w <br />a <br />o3 U <br />o� I <br />� � U <br />v� 3 <br />CU <br />C <br />0 <br />Q <br />m <br />0 <br />C� <br />C:ao <br />(� m <br />ca <br />CD <br />.i Cc CM C <br />V W-0J' <br />g <br />N N <br />.L N E <br />w <br />Cl) 1- fA <br />J <br />U <br />C <br />0 <br />E <br />E <br />0 <br />L <br />co <br />N <br />Co CD <br />m 7) <br />w <br />06� ` U <br />F- <br />Uj <br />70�Lo <br />a cn <br />0 <br />FnYNa <br />a <br />Cn <br />0 <br />06 <br />U) <br />U) <br />0 <br />z <br />co <br />0- <br />4_ <br />��0/ <br />LL <br />0 <br />.CU <br />w 0 <br />w <br />w <br />LLI <br />tZ <br />u.i <br />A_ W N <br />M <br />0144. <br />CD <br />LL: ca <br />aw <br />w <br />O <br />3 <br />z <br />0 <br />V) <br />m <br />U) <br />w <br />al <br />0 <br />ti <br />w <br />o <br />Cn <br />j <br />J <br />w <br />o <br />z <br />rn <br />o <br />F-- <br />LU <br />M <br />N <br />wUj <br />Ch <br />O <br />w <br />(Y,) <br />MOW <br />