My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (131)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (131)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 4:02:20 PM
Creation date
2/25/2025 9:49:12 AM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
Berglund Construction Company
Building Plans - Permit #
2887
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />3 <br />4 <br />5 <br />19 <br />m <br />0 <br />T <br />0 <br />U <br />I <br />C <br />3 <br />A <br />CONTRACTOR <br />PHASE 1 CONSTRUCTION <br />PHASE 1 - SEQUENCE NOTES <br />PI1-1 OWNER VACATES PHASE 1 AREA OF WORK AND REMOVES FURNISHINGS AND ACCESSORIES <br />PH1-2A GENERAL CONTRACTOR INSTALLS DUST BARRIER PARTITIONS <br />PH1-213 PROVIDE A HEPA UNIT WITH TEMPORARY EXHAUST TO PROVIDE A NEGATIVE PRESSURE <br />CONSTRUCTION ZONE. REFERENCE MECHANICAL DRAWINGS <br />PI1-3 CONTRACTOR PERFORMS DEMOLITION AND NEW CONSTRUCTION WORK IN PHASE 1 AREA <br />OF WORK <br />CONTRACTOR <br />PHASE 3 CONSTRUCTION <br />PHASE 3 - SEQUENCE NOTES <br />PI3-1 OWNER VACATES PHASE 3 AREA OF WORK AND REMOVES FURNISHINGS AND ACCESSORIES <br />PH3-2A GENERAL CONTRACTOR INSTALLS DUST BARRIER PARTITIONS <br />PH3-213 PROVIDE A HEPA UNIT WITH TEMPORARY EXHAUST. REFERENCE MECHANICAL DRAWINGS <br />PI3-3 CONTRACTOR PERFORMS DEMOLITION AND NEW CONSTRUCTION WORK IN PHASE 3 AREA <br />OF WORK <br />PI3-4 UPON COMPLETION, OWNER EQUIPS AND OCCUPIES PHASE 3 AREA OF WORK <br />PHASE 1 - DESCRIPTION <br />- INSTALLATION OF ADDITIONAL STRUCTURE REQUIRED FOR O.R. 9 <br />- INSTALLATION OF NEW DUCTWORK IN RESTRICTED CORRIDOR <br />- 24 HR FIRE WATCH PERSONNEL REQUIRED FOR THIS PORTION OF <br />WORK AS INDICATED ON PHASE 1 CONSTRUCTION PLAN <br />PHASE 3 - DESCRIPTION <br />- COMPLETION OF REMAINING CONSTRUCTION IN SCOPE OF WORK <br />24 HR FIRE <br />WATCH <br />PERSONNEL <br />PHASE 2 CONSTRUCTION <br />PHASE 2 - SEQUENCE NOTES <br />CONTRACTOR <br />PI2-1 OWNER VACATES PHASE 2 AREA OF WORK AND REMOVES FURNISHINGS AND ACCESSORIES <br />PI2-2A GENERAL CONTRACTOR INSTALLS DUST BARRIER PARTITIONS <br />PH2-213 PROVIDE A HEPA UNIT WITH TEMPORARY EXHAUST TO PROVIDE A NEGATIVE PRESSURE <br />CONSTRUCTION ZONE. REFERENCE MECHANICAL DRAWINGS <br />PI2-3 CONTRACTOR PERFORMS DEMOLITION AND NEW CONSTRUCTION WORK IN PHASE 2 AREA <br />OF WORK <br />CONSTRUCTION COMPLETE <br />®r <br />® AREA OF WORK <br />PHASE 2 - DESCRIPTION <br />- INSTALLATION OF NEW DUCTWORK IN RESTRICTED CORRIDOR <br />- 24 HR FIRE WATCH PERSONNEL REQUIRED FOR THIS PORTION OF <br />WORK AS INDICATED ON PHASE 2 CONSTRUCTION PLAN <br />PROJECT TITLE: <br />AdventHealth - ZEPHYRHILLS <br />OPERATING ROOMS 8 & 9 BUILD <br />OUT <br />PROJECT ADDRESS: <br />7050 GALL BLVD, <br />ZEPHYRHILLS, FL, 33541 <br />O.F. ft. 0 <br />Ma <br />SIGNATURE <br />9_&- �� <br />DATE <br />REVISIONS <br />NO. DESCRIPTION I DATE <br />2 ADDENDUM No.1 07/12/2021 <br />DATE ISSUED: 12/11/2019 <br />REVIEWED BY: ML <br />DRAWN BY: TH <br />DESIGNED BY: MW <br />PROJECT NUMBER: <br />504-0253-000 <br />0 2019 RS&H, INC. <br />PHASING PLANS <br />SHEET ID: <br />A BLDG.ID <br />NEW SHEET <br />AP1 00 <br />PROJECT STATUS: <br />CONSTRUCTION <br />DOCUMENTS <br />Copyright 0 2019. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the <br />expressed written consent of this corporation is prohibited. All rights reserved. <br />3" SCALE 0 3" 6" 1' <br />1 1/2" SCALE 0 6" 1' 2' <br />3/8" SCALE 1 " 3' ' <br />1/4" SCALE 4' 0 2' 4' 8' <br />1/8" SCALE 8' 0 4' 8' 16' <br />NNNPNEMEEMN <br />
The URL can be used to link to this page
Your browser does not support the video tag.