Laserfiche WebLink
WATER HEATER EWH-1 DETAIL (NOT USED' <br />SHUT-OFF VALVE <br />C.W. MAKE-UP <br />H.W. TO FIXTURES <br />THERMAL EXPANSION TANK SIZE <br />PER MFG. RECOMMENDATIONS - <br />TEMPERATURE AND <br />PRESSURE RELIEF VALVE <br />DISCHARGE FULL SIZE OF VALVE <br />DISCHARGE PIPE TO MOP SINK OR <br />FLOOR DRAIN AND TERMINATE <br />WITH ELBOW TURNED DOWN <br />1" DRAIN LINE. ROUTE TO MOPSINK <br />OR FLOOR DRAIN AND TERMINATE <br />WITH ELBOW TURNED DOWN � <br />i <br />PROVIDE AND INSTALL WALL MTD. <br />MOP HOLDER SO MOPS ALWAYS <br />DRIP INTO MOP SINK. <br />PROVIDE 2" AIR GAP <br />FOR T&P RELIEF AND <br />DRAIN LINE PIPING <br />RECEIVING AREA FLOOR <br />ALUMINUM CORNER GUARDS <br />ON MOP SINK WING WALL. <br />Scale: No Scale <br />WATER HEATER <br />"EWH-1" <br />MOP SINK <br />WATER HEATER"' SERVICE CLOSET <br />Scale: No Scale <br />VENT <br />VENT <br />4 �T� <br />VACUUM BREAKER <br />HEAT TRAP <br />4" DEEP GALV. DRAIN PAN <br />1 "CW <br />0 <br />ro WH-1 <br />1„CW <br />/ 3/4"C W <br />\ 3/4"HW <br />WC-1 \, <br />3/4"HW <br />\ <br />3/4"CW <br />� TP-1 \. <br />LAV-1 TRAP PRIMER\ 3/4"HW <br />0 r/2' <br />TO HUB DRAIN 1 "CWH W <br />EDF-1 3/4"CW \ <br />3/4"CW <br />WC-1 1 "CW <br />1" CW U/G. <br />FOR CONT. IV-1 1/2"CW o <br />REFER TO <br />CIVIL DWGS. PIAAu_1 <br />EWH-1 TO DRAIN INTO <br />MOP SINK (MS-1 <br />) <br />REFER TO SHEET P1 FOR <br />ADDITIONAL INFORMATION. <br />INSTALL WATER HEATER ABOVE MOP SINK <br />AT T-6" A.F.F. ON 8" 20 GA. STEEL STUD <br />JOISTS SPACED 8" O.C. SPANNING <br />SURROUNDING WALLS. COORDINATE <br />STRUCTURAL SUPPORT FRAMING WITH <br />GENERAL CONTRACTOR. <br />INSTALL FRP @ 48" A.F.F. <br />60" WIDE ON THIS WALL. <br />45' I <br />N. <br />r � OpR <br />SOIL OR <br />WASTE <br />SEWER <br />i <br />i NOTE: <br />CONNECT VENT TO SOIL OR WASTE PIPING <br />SOIL OR i ABOVE CENTERLINE. UNDER SLAB HORIZONTAL <br />WASTE j CONNECTIONS OF VENT PIPING TO WASTE <br />SEWER SEWER SYSTEM PIPELINE SHALL NOT BE <br />ALLOWED. <br />VENT PIPE INSTALLATION DETAIL <br />Scale: No Scale <br />WH-1 <br />COLD & HOT WATER DIAGRAM <br />Scale: No Scale <br />4" VENT THRU WALL. <br />ELBOW DN AND COVER <br />W/ INSECT SCREEN <br />2"V <br />i <br />2" V <br />WC-1 <br />I <br />3/4"H W <br />MS-1 <br />3/4"C W <br />1 1/2" V <br />r r' 1 <br />1 1/2" V4" SAN i 1 1/2" VENT THRU WALL. <br />LAV-1 <br />EDF-1 i �� FCO-1 <br />i 4" SAN <br />i <br />i <br />i WCO-1 L <br />J <br />3' SAN i HD-1 1 1/2" V <br />4" SANS / �LAV-1 <br />FLUSH WITH <br />FLOOR LINE <br />CLEAN -OUT TO BE TYLER PIPE <br />MODEL 003533 SERIES OR EQUAL <br />INSTALLATION SHALL BE FLUSH WITH <br />SURROUNDING FLOOR SURFACES. — <br />REFER TO SHEET P1 FOR <br />ADDITIONAL INFORMATION. <br />SANITARY & VENT DIAGRAM <br />Scale: No Scale <br />ELBOW DN AND COVER <br />W/ INSECT SCREEN <br />4" SAN <br />FCO-1 <br />WC-1 <br />1 1/2" V <br />WCO-1 <br />4" SAN <br />3" SAN <br />MS-1 <br />EXTRA HEAVY DUTY CAST <br />IRON ADJUSTABLE SCORIATED <br />SECURED COVER. <br />BRONZE TAPER THREAD PLUG <br />WITH COUNTER SUNK HEAD <br />`N <br />I <br />\-FLANGE <br />WASTE LINE LENGTH TO SUIT <br />FLOW 4„ FLOW 4 <br />THIS DETAIL USED FOR 4" <br />SANITARY LINE RUN <br />BELOW FIXTURE RACKING. <br />SEE PLANS. <br />2—WAY YARD CLEAN OUT DETAIL —WAY YARD CLEAN OUT DETAIL <br />Scale: No Scale <br />GENERAL PLUMBING NOTES & SPECIFICATIONS <br />1. GENERAL NOTES ARE APPLICABLE TO ALL PLUMBING WORKING DRAWINGS. <br />2. THE WORK SHALL BE EXECUTED IN STRICT CONFORMITY WITH BASE BUILDING SPECIFICATION AND WITH THE LATEST <br />EDITION OF THE PREVAILING LOCAL PLUMBING AND BUILDING CODES AND ALL LOCAL REGULATIONS THAT MAY APPLY. IN <br />CASE OF CONFLICT BETWEEN THE CONTRACT DOCUMENTS AND A GOVERNING CODE OR ORDINANCE THE MORE STRINGENT <br />STANDARD SHALL APPLY. <br />3. ALL PLUMBING WORK SHALL BE COORDINATED WITH ALL OTHER TRADES BEFORE PROCEEDING WITH INSTALLATION. <br />4. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND FOR PAYING RELATED <br />FEES. <br />5. ROUGH -IN DIMENSIONS OF TOILET FIXTURES MUST BE COORDINATED WITH GENERAL CONTRACTOR AND FIELD <br />SUPERVISOR. <br />6. INSTALL BALL VALVES ON ALL BRANCH SUPPLY LINES. <br />7. PROVIDE ACCESS PANELS ON ALL INACCESSIBLE VALVES AND CLEANOUTS. ACCESS PANELS SHALL BE PROVIDED BY <br />GENERAL CONTRACTOR. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR LOCATION. MOUNT SHUT-OFF <br />VALVES NO HIGHER THAN 12'-8" AFF. <br />8. ALL WORK SHALL BE PROPERLY TESTED, BALANCED AND CLEANED. PROVIDE A ONE YEAR WARRANTY FROM DATE OF FINAL <br />INSPECTION ON ALL PARTS AND LABOR. <br />9. FOLLOW PDI STANDARDS FOR WATER HAMMER ARRESTORS. <br />10. ALL FIXTURES TO BE SUPPLIED & INSTALLED BY PLUMBING CONTRACTOR,. <br />11. GENERAL CONTRACTOR SHALL COORDINATE WATER METER LOCATION AND INSTALLATION WITH LOCAL AUTHORITIES AND <br />CIVIL DRAWINGS. <br />12. PROVIDE BUILDING SERVICE LINE 5-0" FROM BUILDING LINE, OR INSIDE BUILDING FROM OUTLET SIDE OF METER AS SHOWN <br />ON CIVIL SITE PLAN. COORDINATE EXACT LOCATION WITH CIVIL DRAWINGS AND AT JOB SITE. IF LOCAL MUNICIPALITIES <br />REQUIRE BACKFLOW PREVENTION DEVICE, A MINIMUM RPZ TYPE SHALL BE PROVIDED. <br />13. SANITARY SEWER PIPING SHOWN IS BASED ON 0.125"/FT FOR 3"-6" & 0.25"/FT FOR 2 1/2" OR LESS FOR ALL PIPING. <br />COORDINATE BUILDING SEWER LOCATION AND INVERT ELEVATION WITH CIVIL DRAWINGS. <br />14. TRAP SEAL PRIMERS ARE TO BE PROVIDED AT NO ADDITIONAL COST TO OWNER IF REQUIRED BY LOCAL BUILDING CODE <br />OFFICIALS. <br />15. VTR'S SHALL BE LOCATED A MINIMUM OF 5' FROM ANY PARAPET WALL AND 10' FROM ANY RTU AIR INTAKE. <br />16. FURNISH ALL MATERIAL, LABOR, EQUIPMENT, AND ACCESSORIES AS REQUIRED TO INSTALL COMPLETE PLUMBING AND HVAC <br />PIPING SYSTEMS AS INDICATED ON MECHANICAL DRAWINGS AND IN THESE SPECIFICATIONS. <br />17. SANITARY SEWERS <br />a. INSTALL SANITARY SEWERS, STACKS, VENTS, DRAINS, CLEANOUTS, ETC., AS INDICATED ON THE DRAWINGS. <br />b. SEWERS TO BE PITCHED A MINIMUM OF 1/4" PER FOOT FOR 3" SIZES AND UNDER AND 1/8" PER FOOT FOR 4" SIZES AND <br />LARGER OR TO GRADES INDICATED ON DRAWINGS. <br />c. CHANGES IN DIRECTION AND BRANCH CONNECTIONS SHALL BE MADE WITH APPROVED DRAINAGE FITTINGS <br />COMPATIBLE WITH THE PIPING SYSTEM MATERIAL IN WHICH IT IS INSTALLED. <br />d. ALL FIXTURES AND SANITARY DRAINS SHALL BE VENTED AS INDICATED ON DRAWINGS AND IN ACCORDANCE WITH CODE. <br />e. VENTS ARE TO BE EXTENDED THROUGH WALL IN ACCORDANCE WITH PEMB MANUFACTURER'S DETAILS OR THROUGH <br />ROOF AS INDICATED ON DRAINS AND FLASHED WITH 4 LB. LEAD WITH VENT FLASHING TOP TURNED DOWN TWO (2) <br />INCHES MINIMUM INSIDE PIPE. <br />18. BELOW GRADE SANITARY INSIDE BUILDING <br />a. SERVICE WEIGHT - PVC AND CPVC ASTM A74-82 WITH ASTM C564-70 NEOPRENE COMPRESSION JOINTS OR NO -HUB <br />b. PVC-DWV PLASTIC ASTM D1785 WITH ASTM D2665 DWV SOLVENT WELD SOCKET FITTINGS. <br />19. ABOVE GRADE SANITARY SEWER AND VENT <br />a. NO -HUB CAST IRON PIPE CISPI 1-301-78. <br />b. PVC-DWV PLASTIC ASTM D1785 WITH ASTM D2665 DWV SOLVENT WELD SOCKET FITTINGS (IN CONCEALED AREAS ONLY, <br />PVC SHALL NOT BE INSTALLED IN CEILING PLENUMS). <br />c. SCHEDULE 40 GALVANIZED STEEL PIPE, ASTM A53-83 WITH CAST IRON SCREWED FITTINGS ANSI B16.22 1983. <br />20. DOMESTIC WATER PIPING <br />a. INSTALL DOMESTIC WATER PIPING AS INDICATED ON DRAWINGS. INCLUDE ALL FITTINGS, VALVES, HANGERS AND OTHER <br />ACCESSORIES. EXTEND DOMESTIC WATER PIPING TO ALL FIXTURES AND EQUIPMENT REQUIRED FOR COMPLETE <br />INSTALLATION. <br />b. INCLUDE UNIONS, OR OTHER DISCONNECT MEANS, STOPS OR VALVES FOR ISOLATION OF FIXTURES AND EQUIPMENT. <br />VALVES TO BE FULLY COMPATIBLE WITH PIPING FOR SERVICE INTENDED AS MANUFACTURED BY NIBCO, CRANE OR <br />MILWAUKEE. INCLUDE HOSE OR DRAIN VALVES AT LOW POINTS WHERE FIXTURES CANNOT BE USED FOR DRAINAGE. <br />c. PROVIDE WATER HAMMER ARRESTERS OF TYPE AS INDICATED ON THE DOMESTIC WATER RISER DIAGRAM. THESE <br />SHALL BE ASSE 1010 OR PDI-WH2O1, PISTON TYPE WITH PRESSURIZED METAL -TUBE CUSHIONING CHAMBER AS <br />MANUFACTURED BY SIOUX CHIEF, AMTROL, JOSAM OR ZURN. <br />d. HANGERS ON INSULATED PIPE TO BE OUTSIDE OF INSULATION, SIZED ACCORDINGLY AND WITH A SUFFICIENT SADDLE <br />TO PROTECT INSULATION. <br />21. DOMESTIC WATER PIPING SHALL BE AS FOLLOWS: <br />a. ABOVE GRADE - TYPE "L" HARD COPPER ASTM B88-832 WITH WROUGHT COPPER FITTINGS ASTM B16.22 1980 AND <br />NON -LEAD OR ANTIMONY SOLDER JOINTS. <br />b. BELOW GRADE - CPVC OR PVC WITHOUT SPLICES OR FITTINGS. <br />c. FLUSH, VENT AND SANITIZE ALL WATER PIPING WITH CHLORINE AS REQUIRED PER AWWA, LOCAL BUILDING <br />DEPARTMENT AND HEALTH DEPARTMENT CODES. <br />d. DOMESTIC HOT AND COLD WATER PIPING UNDER CONCRETE FLOOR TO BE COVERED WITH SAND SO THAT PIPING WILL <br />NOT BECOME EMBEDDED IN THE FLOOR SLAB. <br />e. ALL PIPING UNDER CONCRETE FLOOR SHALL BE CPVC PIPING, CONTINUOUS. NO SPLICES OR FITTINGS WILL BE <br />ALLOWED. <br />f. EXTREME CAUTION MUST BE TAKEN SO THAT NO PIPING AND INSULATION UNDER CONCRETE FLOORS BECOMES <br />CRUSHED, CUT, SPLIT OR DEFORMED DURING THE POURING OF THE FLOOR SLAB. <br />PROVIDE CLEANOUT WITH ADJUSTABLE CLEANOUT <br />TOP WITH VARIATIONS SUITABLE FOR FLOOR <br />COVERING (CARPET MARKER, RECESSED FOR TILE, <br />SCORIATED FOR UNFINISHED FLOORS). CLEAN THE CLEANOUT PLUG AS SPECIFIED. <br />TOP OF EXPOSED FCO AFTER INSTALLATION. APPLY TEFLON JOINT COMPOUND <br />TO THE CLEANOUT PLUG THREADS <br />fy <br />FLOOR SLAB ON GRADE <br />SAME SIZE AS SEWER <br />UP TO 4" MAXIMUM MEMBRANE CLAMP <br />AS REQUIRED FOR LONG SWEEP ELBOW AT <br />DEPTH OF SEWER END OR TURN OF RUN <br />SANITARY AND/OR COMBINATION WYE AND <br />STORM SEWER, SIZE EIGHTH BEND IN RUN, <br />PER PLAN REDUCING TYPE IF REQUIRED, <br />ENTER TOP OF PIPE. <br />DIRECTION OF FLOWF _16 <br />REFER TO SPECIFICATIONS AND SCHEDULE FOR MORE <br />INFORMATION. LOCATE AT BUILDING EXIT, AT ENDS OF RUNS, <br />AT TURNS OF PIPE GREATER THAN 45°, AT 50' INTERVALS ON <br />STRAIGHT RUNS, AND/OR WHERE SHOWN ON PLANS AND <br />RISERS. PROVIDE BACKFILL PER ARCHITECTURAL <br />SPECIFICATIONS. LOCATE CLEANOUT WHERE THERE IS 18" <br />CLEAR AROUND, FOR ACCESSIBILITY. CONSULT LOCAL CODES <br />AND OFFICIALS FOR OTHER REQUIREMENTS. <br />FLOOR CLEAN OUT DETAIL <br />(7 <br />Scale: No Scale <br />LEGEND <br />SS <br />SANITARY SEWER <br />-- - -— <br />DOMESTIC COLD WATER <br />— <br />DOMESTIC HOT WATER <br />CD <br />CONDENSATE DRAIN <br />-- <br />PLUMBING VENT <br />UNION <br />— I <br />i <br />PLUG COCK <br />C - <br />ELBOW - TURNED DOWN <br />a --- <br />ELBOW - TURNED UP <br />-- - -- <br />TEE - TURNED DOWN <br />--�-- <br />TEE - TURNED UP <br />- ��-- <br />GATE VALVE <br />--I O F--- <br />BALL VALVE <br />--��- <br />CHECK VALVE <br />_— <br />SHUT-OFF VALVE <br />IN VERTICAL LINE <br />T & P RELIEF VALVE <br />—O FCO <br />FLOOR CLEANOUT <br />_ _ O YCO <br />YARD CLEANOUT <br />-- WH <br />WALL HYDRANT <br />--- a_WCO <br />WALL CLEANOUT <br />FD FLOOR DRAIN HW HOT WATER <br />DN DOWN CW COLD WATER <br />VTR VENT THRU ROOF CONT. CONTINUATION <br />U/G UNDER GROUND I.E. INVERT <br />SAN SANITARY SEWER ELEVATION <br />V PLUMBING VENT CD CONDENSATE <br />DRAIN <br />OUTSIDE <br />INSIDE <br />CORE DRILL WALL FOR EXISTING <br />CIRCLE CUT NEW OR EXISTING STUD <br />MASONRY OR CONCRETE <br />CONSTRUCTION AND PROVIDE <br />CONSTRUCTION <br />GALVANIZED STEEL PIPE FOR 6" AND <br />SMALLER. PROVIDE 10 GAUGE <br />GALVANIZED SHEET STEEL ROUND TUBE <br />FOR 6" AND LARGER. CAULK SLEEVE IN <br />PROVIDE GALVANIZED STEEL PIPE WITH <br />PLACE. <br />RETAINING RING TO ANCHOR PIPE AND <br />ACT AS A WATER STOP. GROUT IN PLACE <br />FOR EXISTING MASONRY OR NEW <br />PACK ANNULAR SPACE WITH <br />CONCRETE CONSTRUCTION. <br />FIBERGLASS INSULATION AND PROVIDE <br />WATERPROOF NOW SHRINK SILICONE <br />SEALANT ON INSIDE AND OUTSIDE <br />PROVIDE CAST IRON WALL PIPE WITH <br />4, <br />FLUSH WITH WALL. <br />RETAINING RING TO ANCHOR PIPE <br />AND ACT AS A WATER STOP. POUR IN <br />PLACE FOR NEW CONCRETE <br />PROVIDE ESCUTCHEON FOR EXPOSED <br />CONSTRUCTION. <br />PIPE IN FINISHED SPACE <br />NOTE: <br />PIPING ARRANGEMENT SHOWN IN SCHEMATIC. <br />ADJUST TO SUIT FIELD CONDITIONS. <br />REFER TO SPECIFICATIONS FOR MORE INFORMATION ON INSULATION AND SEALANT. <br />COORDINATE SLEEVE INSTALLATION WITH GENERAL CONTRACTOR. <br />PIPING PENETRATION DETAIL <br />5 <br />Scale: No Scale <br />STUD IN WALL <br />METAL CUP WITH (3) SHEET <br />METAL SCREWS FASTENED <br />TO BOTH STUDS <br />WATER HEATER <br />SHELF MOUNTED WATER HEATER <br />STRAP TO WALL AS INDICATED. <br />(1) STRAP ON THE UPPER 1/3 & <br />(1) ON THE LOWER 1/3 MAINTAINING <br />A MINIMUM OF 4" FROM CONTROLS. <br />`- (2) SHEET METAL <br />O O �SCREWS <br />3/4" WIDE 20 GAUGE <br />STRAP <br />LATERAL SUPPORT <br />WATER HEATER <br />INSTALL WATER HEATER ABOVE <br />MOP SINK UPON 8" 20 GA. STEEL <br />STUD JOISTS SPACED 8" O.C. <br />SPANNING SURROUNDING WALLS AT <br />T-6" A.F.F. AT MOP SINK AND ABOVE <br />CEILING AT HALLWAY. COORDINATE <br />STRUCTURAL SUPPORT FRAMING <br />WITH G.C. <br />WATER HEATER SHELF DETAIL <br />Scale: No Scale <br />CONSULTANT: <br />SEAL: HENRY D. MONTAGUE, PE 78172 <br />�111!!1 <br />� fit <br />OtkpVA1. ����i�e�/ <br />E NSF .AlT9 <br />W No. 78172 '; m <br />*" ATE OF �= <br />LOR <br />Zq-z/ <br />THP DRAWING SHALL NOT BE USED FOR <br />CONSTRUCTION PURPOSES UNTIL THE SEAL AND <br />SIGNATURE OF THE RESPONSIBLE REGISTRANT <br />APPEARS ON THE DRAWING, AND PROPER PERMIT <br />FORMS AND RELATED FEES ARE TRANSMITTED BY <br />THE OWNER, OWNER'S AGENT OR CONTRACTOR <br />TO THE AUTHORITY HAVING JURISDICTION. <br />DATE <br />ISSUED FOR <br />REV <br />03/29/2021 <br />PEMB COORDINATION <br />05/20/2021 <br />CIVIL SUBMISSION <br />05/20/2021 <br />DUKE COORDINATION <br />06/07/2021 <br />PEMB COORDINATION 02 <br />08/09/2021 <br />CIVIL RESUBMISSION 1 <br />08/25/2021 <br />OWNER REVIEW <br />1 1 /08/2021 <br />REVISED ELEVATIONS <br />1 1 /29/2021 <br />PERMIT SUBMITTAL <br />Project Manager <br />Drawn <br />L. LONG <br />R. McCARTHY <br />Project Leader <br />Checked <br />L. LONG <br />H. MONTAGUE <br />Date <br />Dept Mgr Approval <br />02/23/2021 <br />H. MONTAGUE <br />Client <br />PALMETTO ZEPHYRHILLS - GALL BLVD., LLC <br />P.O. Box 1615, <br />Thomasville, GA 31 799 <br />Office: (229) 226-1 1 77 <br />Contact: Daniel Tubb <br />Project <br />DOLLAR GENERAL <br />Corner of Gall Boulevard and C <br />Avenue, <br />Zephyrhills, FL 33542 <br />(City of Zephyrhills) <br />Store* 23227 <br />Drawing Title <br />PLUMBING DETAILS <br />AND DIAGRAMS <br />DO NOT SCALE DRAWING <br />Project No. <br />Drawing No. <br />.JCDT.20.0451 <br />P2 <br />I <br />