INDEX OF SPECIFICATION SECTIONS <br />. <br />1.8. CONSTRUCTION TIME <br />BIDDING REQUIREMENTS AND CONDITIONS OF THE CONTRACT <br />1.8.1 THE AGREEMENT WILL INCLUDE A REQUIREMENT THAT THE WORK <br />t <br />SECTION 00 21 13 INSTRUCTIONS TO BIDDERS <br />BE COMPLETED WITHIN A SPECIFIED NUMBER OF DAYS FOLLOWING <br />THE DATE OF COMMENCEMENT. THE SPECIFIED NUMBER OF DAYS <br />. <br />DIVISION 1 - GENERAL REQUIREMENTS <br />WILL BE AGREED UPON BETWEEN THE OWNER AND THE <br />SUCCESSFUL BIDDER. THE DATE OF COMMENCEMENT WILL BE <br />DEFINED IN THE OWNER -CONTRACTOR AGREEMENT (FOR THE <br />SECTION 01 11 00 SUMMARY OF WORK <br />PURPOSE OF ADMINISTRATION OF THE OWNER -CONTRACTOR <br />SECTION 01 23 00 ALTERNATES <br />AGREEMENT ONLY) AS THE LATER OF EITHER 1) THE DATE OF THE <br />SECTION 01 25 00 SUBSTITUTION PROCEDURES <br />OWNER -CONTRACTOR AGREEMENT OR 2) THE DATE OF RECEIPT OF <br />SECTION 01 26 00 CONTRACT MODIFICATION PROCEDURES <br />THE BUILDING PERMIT. <br />SECTION O1 33 00 SUBMITTAL PROCEDURES <br />SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS <br />SECTION 01 66 00 PRODUCT STORAGE AND HANDLING <br />2. PRODUCTS <br />REQUIREMENTS <br />SECTION 01 77 00 CLOSEOUT PROCEDURES <br />2.0.1 ALL BUILDING CONSTRUCTION PRODUCTS/MATERIALS USED <br />SECTION 01 78 39 PROJECT RECORD DOCUMENTS <br />FOR THE PROJECT ARE TO BE NON- ASBESTOS CONTAINING. <br />ASBESTOS CONTAINING MATERIAL (ACM) BY FEDERAL EPA AND OSHA <br />DIVISION 2 - EXISTING CONDITIONS <br />DEFINITION IS ANY MATERIAL/PRODUCT THAT CONTAINS GREATER <br />THAN (>) 1.0% ASBESTOS. THE FOLLOWING SIX (6) TYPES OF <br />NOT USED <br />NATURAL OCCURRING ASBESTOS MINERAL FIBERS ARE CURRENTLY <br />REGULATED UNDER EPA AND OSHA; CHRYSOTILE, AMOSITE, <br />CROCIDILITE, TREMOLITE, ANTHOPHYLLITTE AND ACTINOCITE ASBESTOS. <br />DIVISION 3 - CONCRETE <br />PUBLIX WILL REQUIRE A NOTARIZED AFFIDAVIT FROM THE PROJECT <br />CONSTRUCTION CONTRACTOR OR THEIR REPRESENTATIVE STATING <br />NOT USED <br />THAT THEY HAVE VERIFIED THAT ACM WAS NOT USED OR INSTALLED <br />DURING THE CONSTRUCTION OF THE PUBLIX STRUCTURE. <br />DIVISION 4 - MASONRY <br />3. EXECUTION <br />NOT USED <br />NOT USED <br />DIVISION 5 - METALS <br />END OF SECTION 00 21 13 <br />SECTION OS 12 00 STRUCTURAL STEEL FRAMING <br />SECTION 01 11 00 <br />SECTION 05 21 00 STEEL JOIST FRAMING <br />SECTION 05 30 00 METAL DECKING <br />SUMMARY OF WORK <br />V03172017 <br />DIVISION 6 - WOODS. PLASTICS AND COMPOSITES <br />SECTION 06 00 00 WOODS, PLASTICS AND COMPOSITES <br />1. GENERAL <br />DIVISION 7 - THERMAL AND MOISTURE PROTECTION <br />1.1. WORK UNDER THIS AGREEMENT IS THE CONSTRUCTION OF A PUBLIX <br />SUPER MARKEI S STORE BUILDING. <br />SECTION 07 21 00 THERMAL INSULATION <br />SECTION 07 21 29 SPRAYED POLYURETHANE INSULATION <br />1.2. RELATED WORK UNDER OTHER CONTRACTS <br />_ <br />SECTION 07 51 00 BITUMINOUS BUILT-UP ROOFING <br />SECTION 07 60 00 FLASHING AND SHEET METAL <br />SECTION 07 72 33 ROOF HATCHES <br />1.2.1 SITEWORK: <br />SECTION 07 92 00 JOINT SEALANTS <br />SITE GRADING <br />SITE DRAINAGE <br />DIVISION 8 - OPENINGS <br />SITE UTILITIES, PAVING <br />SECTION 08 11 00 METAL DOORS AND FRAMES <br />PAD PREPARATION FOR THIS BUILDING <br />SECTION 08 14 00 WOOD DOORS <br />CONSTRUCTION OF OTHER BUILDINGS WITHIN THE PROJECT. <br />SECTION 08 17 05 SIDE FOLDING GRILLES <br />SECTION 08 33 23 OVERHEAD COILING DOORS <br />OTHER WORK AS REQUIRED FOR SATISFACTORY COMPLETION OF <br />SECTION 08 38 00 TRAFFIC DOORS <br />THE PROJECT. <br />SECTION 08 42 29 AUTOMATIC ENTRANCES <br />SECTION 08 43 13 ALUMINUM -FRAMED STOREFRONTS <br />1.2.2 ON PROJECTS FOR WHICH PUBLIX SUPER MARKETS, INC. IS <br />SECTION 08 56 59 SERVICE AND TELLER WINDOW UNITS <br />THE SOLE OWNER, SOME OR ALL OF THE ABOVE -LISTED SITE <br />SECTION 08 71 00 DOOR HARDWARE <br />WORK MAY BE PART OF THIS CONTRACT; SEE BID FORMS FOR <br />DEFINITIVE LIST. <br />DIVISION 9 - FINISHES <br />1.3. STANDBY GENERATORS: WHEN A PUBLIX SUPER MARKETS STORE <br />BUILDING IS DESIGNATED TO RECEIVE A STANDBY GENERATOR, THE <br />SECTION 09 29 00 GYPSUM BOARD <br />GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR SUPPLYING THE <br />SECTION 09 30 00 TILING <br />CRANE AND OPERATOR REQUIRED TO UNLOAD AND INSTALL SAID <br />SECTION 09 50 00 CEILINGS <br />GENERATOR AND RELATED EQUIPMENT. <br />SECTION 09 65 19 RESILIENT TILE FLOORING <br />SECTION 09 67 23 RESINOUS FLOORING <br />1.4. THE FOLLOWING ITEMS WILL BE FURNISHED BY PUBLIX SUPER <br />" <br />SECTION 09 68 00 CARPET <br />MARKETS, INC. AND SHALL BE SET IN PLACE, INSTALLED, AND <br />SECTION 09 91 00 PAINTS <br />CONNECTED BY THE PROPER TRADES UNDER THIS CONTRACT <br />(EXCEPT FOR CONNECTION WORK BY PUBLIX AS NOTED). THESE <br />y <br />DIVISION 10 - SPECIALTIES <br />ITEMS MAY BE DESIGNATED OFCI (OWNER FURNISHED, CONTRACTOR <br />INSTALLED) WHEN REFERENCED IN THE DOCUMENTS. ITEMS WILL BE <br />SECTION 10 21 13 TOILET COMPARTMENTS <br />DELIVERED TO THE SITE OF CONSTRUCTION. CONTRACTOR ASSUMES <br />RESPONSIBILITY FOR DELIVERED ITEMS AT THE TIME OF DELIVERY. <br />SECTION 10 28 13 TOILET ACCESSORIES <br />COORDINATE WITH PUBLIX FOR DELIVERY METHOD AND TIME. <br />DIVISION 11 - EQUIPMENT <br />1.4.1 IF ADDITIVE ALTERNATE FOR HVAC EQUIPMENT IS NOT <br />ACCEPTED: ROOF -TOP HVAC EQUIPMENT CURBS AND SUPPORT <br />SECTION 11 13 00 LOADING DOCK EQUIPMENT <br />RAILS, AND HVAC UNITS (EXCEPT FINAL CONNECTION OF CONTROL <br />WIRING BY PUBLIX WHETHER ADDITIVE ALTERNATE IS ACCEPTED OR <br />DIVISION 12 - FURNISHINGS <br />NOT). IN ANY CASE, WHERE REQUIRED ELSEWHERE, RADIANT UNIT <br />HEATERS ARE PART OF THE CONTRACT. <br />. <br />NOT USED <br />1.4.2 PRE -SLOPED ROOFTOP CURBS FOR HVAC SYSTEMS, <br />DIVISION 13 - SPECIAL CONSTRUCTION <br />MECHANICAL CENTERS. <br />NOT USED <br />1.4.3 ALL SUPPLY AND EXHAUST FAN CURBS, AND ALL SUPPLY <br />AND EXHAUST FANS. <br />DIVISION 14 - CONVEYING EQUIPMENT <br />1.4.4 GREASE HOODS AND HEAT REMOVAL HOODS, DESIGNATED <br />NOT USED <br />GH- AND HR- ON MECHANICAL DRAWINGS. <br />DIVISION 21 - FIRE SUPPRESSION <br />1.4.5 HOT WATER STORAGE AND RECLAIM TANKS. <br />SECTION 21 00 00 FIRE SUPPRESSION <br />1.4.6 LIGHT FIXTURES AND LAMPS. <br />DIVISION 22 - PLUMBING <br />1.4.7 ENERGY MANAGEMENT PANELS (EXCEPT FINAL <br />SECTION 22 40 00 PLUMBING <br />CONNECTION TO POWER AND CONTROL WIRING INSTALLED BY <br />CONTRACTOR WILL BE BY PUBLIX). <br />DIVISION 23 - HEATING, VENTILATING AND AIR CONDITIONING <br />1.4.8 ALL UTILITY TYPE SINKS: STAINLESS STEEL FREESTANDING <br />SECTION 23 70 00 CENTRAL HVAC EQUIPMENT <br />ONE, TWO, THREE, AND FOUR COMPARTMENT SINKS. PLUMBING <br />BRASS PROVIDED BY CONTRACTOR. <br />DIVISION 26 - ELECTRICAL <br />1.4.9 EMERGENCY GENERATOR AND TRANSFER SWITCH WITH GAS <br />SECTION 26 00 00 ELECTRICAL <br />REGULATOR AND FILTER. <br />DIVISION 31 - EARTHWORK <br />1.4.10 "CITE -LAB" SUSPENDED GRID SYSTEM. <br />NOT USED <br />1.4.11 BOSTON RETAIL'S "BOSTON BEAM" SPACE FRAME. <br />DIVISION 32 - CONCRETE PAVING <br />1.4.12 SIMPLEX ARMOR BOND STRIP DOOR CURTAIN SYSTEM. <br />NOT USED <br />1.5. THE FOLLOWING ITEMS WILL BE FURNISHED, SET IN PLACE, INSTALLED, <br />AND CONNECTED BY PUBLIX SUPER MARKETS, INC. EITHER UNDER <br />SEPARATE CONTRACT OR BY PUBLIX PERSONNEL (EXCEPT FOR <br />SECTION 00 21 13 <br />CONNECTION WORK BY CONTRACTOR AS NOTED IN PARENTHESES): <br />INSTRUCTIONS TO BIDDERS <br />1.5.1 WALK-IN COOLERS AND FREEZERS, INCLUDING <br />• <br />V01172017 <br />INSTALLATION OF REFRIGERANT LINES AND CONDENSATE LINES TO <br />1. GENERAL <br />HUB DRAINS (ELECTRICAL CONNECTION BY CONTRACTOR). <br />* 1.1. <br />THE WORK: PUBLIX SUPER MARKET STORE BUILDING LOCATED AS <br />1.5.2 INSULATED COMPOSITE PANEL CEILING SYSTEMS. <br />INDICATED ON THE TITLE BLOCK OF THESE DRAWINGS. <br />1.5.3 REFRIGERATED CASES, INCLUDING INSTALLATION OF <br />1.2. <br />SECURING DOCUMENTS: INVITED BIDDERS MAY OBTAIN COPIES OF THE <br />REFRIGERANT LINES AND CONDENSATE LINES TO HUB DRAINS <br />PROPOSED CONTRACT DOCUMENTS AS INDICATED IN THE INVITATION TO <br />(EXCEPT ELECTRICAL CONNECTION BY CONTRACTOR). <br />BID. <br />1.5.4 CONDENSERS AND COMPRESSORS FOR REFRIGERATED <br />1.3. <br />BID FORM: BIDS WILL BE RECEIVED AT THE TIME AND PLACE INDICATED <br />SYSTEMS, WITH WEATHERPROOF HOUSINGS "WEATHER-PAC'S" OR <br />A ON THE FORM PROVIDED WITH <br />IN THE INVITATION TO BID, AND SHALL BE <br />- <br />ROOF TOP HOUSES WHERE INDICATED (EXCEPT CONNECTION OF <br />THE INVITATION TO BID. <br />POWER AND CONTROL WIRING; REQUIRED FLASHING, <br />PRE -MANUFACTURED CURBS SHOWN, AND OTHER WATER/ <br />1.4. <br />BONDS <br />WEATHERPROOFING BY CONTRACTOR). <br />1.4.1 NO BID SECURITY IS REQUIRED. <br />1.5.5 HEATED FOOD DISPLAY CASES (ELECTRICAL CONNECTION BY <br />CONTRACTOR). <br />1.4.2 A LABOR AND MATERIALS PAYMENT BOND AND A PERFORMANCE <br />BOND, EACH IN THE AMOUNT OF THE CONTRACT SUM, ARE <br />1.5.6 BAKERY OVENS ( GAS AND ELECTRICAL CONNECTION , AND <br />REQUIRED AS A DEDUCTIVE ALTERNATE. <br />- CONTRACTOR SHALL RECEIVE AND STORE OVENS AT THE SITE <br />1.5. <br />EXAMINATION OF DOCUMENTS AND SITE OF WORK <br />UNTIL PUBLIX FORCES CAN INSTALL THEM). <br />1.5.1 BIDDERS REVIEW OF DOCUMENTS: BIDDER SHALL EXAMINE <br />1.5.7 SIGNS ON FACADE AND UNDER CANOPY (ELECTRICAL <br />ENTIRE SET OF DRAWINGS, ALL SECTIONS OF SPECIFICATIONS, <br />CONNECTION BY CONTRACTOR). <br />AND ALL CONDITIONS OF THE CONTRACT. <br />1.5.8 SCISSOR LIFTS, DOCK LEVELERS, AND DOCK BUMPERS <br />1.5.2 NOTE ESPECIALLY SUPPLEMENTAL DRAWINGS AND SPECIFICATIONS <br />(EXCEPT ASSOCIATED CONCRETE WORK, STEEL EMBEDS AND <br />WHICH INTEGRATE THE PUBLIX PROTOTYPE DESIGN WITH THE <br />ELECTRICAL CONNECTION BY CONTRACTOR). <br />SITE AND ALL ADJACENT SHOPPING CENTER STRUCTURES, AND <br />WHICH MAY PROVIDE OR MODIFY THE FACADE AND ADJACENT <br />STRUCTURE. THESE DRAWINGS AND SPECIFICATIONS ARE PART OF <br />1.5.9 TRASH COMPACTOR (ELECTRICAL CONNECTION BY CONTRACTOR). <br />THIS CONTRACT, AND ARE LISTED IN THE INVITATION TO BID. <br />1.5.10 BALER (EXCEPT ELECTRICAL CONNECTION BY CONTRACTOR). <br />_ <br />1.5.3 BIDDERS REVIEW OF CONSTRUCTION SITE: BIDDER SHALL VISIT <br />PROJECT SITE TO BE ACQUAINTED WITH SURROUNDING TERRITORY, <br />MEANS OF APPROACH TO SITE, CONDITIONS OF ACTUAL JOB SITE, <br />1.5.11 ICE MACHINES WITH CONDENSATE DRAIN CONNECTION <br />AND FACILITIES FOR DELIVERY, STORAGE, HANDLING AND PLACING <br />(WATER SUPPLY CONNECTION AND ELECTRICAL CONNECTION BY <br />OF MATERIALS AND EQUIPMENT. BIDDER SHALL COMPARE DRAWINGS <br />CONTRACTOR). <br />AND SPECIFICATIONS WITH WORK IN PLACE IN ORDER TO BE FULLY <br />INFORMED OF ALL CONDITIONS AFFECTING EXECUTION OF WORK. <br />FAILURE TO VISIT SITE OR FAILURE TO EXAMINE ANY AND ALL <br />1.5.12 GONDOLAS (ELECTRICAL WIRING BY CONTRACTOR). <br />CONTRACT DOCUMENTS WILL NOT RELIEVE SUCCESSFUL BIDDER <br />FROM NECESSITY OF FURNISHING ALL MATERIALS OR EQUIPMENT, <br />1.5.13 CHECKOUT STANDS, INCLUDING ALL SIGNAL WIRING <br />OR PERFORMING ALL WORK, THAT MAY BE REQUIRED FOR <br />(ELECTRICAL CONNECTION BY CONTRACTOR). <br />COMPLETION IN ACCORDANCE WITH DRAWINGS AND SPECIFICATIONS <br />WITHOUT ADDITIONAL COST TO OWNER. NEGLECT OF ABOVE <br />REQUIREMENTS WILL NOT BE ACCEPTED AS REASON FOR DELAY IN <br />1.5.14 COMBINED BURGLAR AND FIRE ALARM SYSTEM, INCLUDINGALL <br />WORK. <br />FINAL POWER AND SIGNAL WIRING CONNECTION (CONDUIT, JUNCTION <br />BOXES, PULLING OF POWER AND SIGNAL WIRING, AND DUCT <br />1.6. <br />PROOF OF COMPETENCE AND APPROVAL OF SUBCONTRACTORS <br />MOUNTED IONIZATION DETECTORS BY CONTRACTOR). <br />1.6.1 THE SUCCESSFUL BIDDER WILL BE REQUIRED TO SUBMIT TO THE <br />1.5.15 SAFES. <br />OWNER A LIST OF PROPOSED SUBCONTRACTORS FOR PRINCIPAL <br />PORTIONS OF THE WORK BEFORE EXECUTION OF THE CONTRACT. <br />1.5.16 AUTOMATED TELLER MACHINES (ATM'S), COMMUNICATION <br />THIS LIST MUST BE APPROVED BY THE OWNER AND WILL BECOME <br />AN AMENDMENT TO THE CONTRACT. THE OWNER MAY REQUIRE <br />(ELECTRICAL CONNECTION BY CONTRACTOR). <br />EVIDENCE THAT A PROPOSED SUBCONTRACTOR HAS SUFFICIENT <br />MEANS AND EXPERIENCE IN THE TYPES OF WORK CALLED FOR TO <br />1.5.17 WALL CLOCK IN SALES AREA (ELECTRICAL CONNECTION BY <br />ASSURE COMPLETION OF THE CONTRACT IN A SATISFACTORY <br />CONTRACTOR). <br />MANNER. <br />1.7. <br />AWARD AND EXECUTION OF CONTRACT <br />1.5.18 UNIT INSECT CONTROL SYSTEMS <br />1.7.1 THE CONTRACT, IF AWARDED, WILL BE AWARDED TO THE <br />1.5.19 PORTABLE FIRE EXTINGUISHERS. <br />INVITED BIDDER WHO HAS PROPOSED THE MOST APPROPRIATE <br />PRICE FOR THE PROPOSED SCOPE OF WORK, SUBJECT TO TO THE <br />OWNER'S AND ARCHITECT'S RIGHT TO REJECT ANY AND ALL BIDS <br />1.5.20 TOWEL, SOAP, AND TOILED PAPER DISPENSERS. <br />AND TO WAIVE INFORMALITY AND IRREGULARITY IN THE BIDS AND <br />IN THE BIDDING. <br />1.5.21 DIAPER -CHANGING STATIONS. <br />1.7.2 THE FORM OF AGREEMENT WHICH THE SUCCESSFUL BIDDER WILL <br />1.5.22 MUSIC SYSTEM <br />BE REQUIRED TO EXECUTE IS AIA Al 1 1, 1997, "FORM OF <br />AGREEMENT BETWEEN OWNER AND CONTRACTOR". PUBLIX SUPER <br />_ <br />MARKETS, INC. IS INCLUDED IN THE DEFINITION OF "OWNER" AND <br />1.5.23 AUTOMATIC FIRE SUPPRESSION SYSTEM (ANSUL). <br />SHALL BE A REQUIRED COSIGNATORY OF THE OWNER -CONTRACTOR <br />AGREEMENT. <br />1.5.24 TRIM PACKAGE: RUB RAILS, INTERIOR RAILINGS, ETC. <br />• <br />1.7.3 AT OR PRIOR TO DELIVERY OF THE SIGNED AGREEMENT, THE <br />1.5.25 CART CURBS AND INTERIOR FLEX POST SHALL BE PROVIDED AND <br />BIDDER TO WHOM THE CONTRACT IS AWARDED SHALL DELIVER TO <br />THE OWNER THOSE CERTIFICATES OF INSURANCE REQUIRED BY <br />INSTALLED BY GENERAL CONTRACTOR. SEE ARCHITECTURAL PLANS FOR <br />THE CONTRACT DOCUMENTS AND SUCH LABOR AND MATERIALS <br />LOCATIONS AND DETAILS. <br />• <br />PAYMENT BONDS AND PERFORMANCE BONDS AS MAY BE <br />REQUIRED BY THE OWNER. <br />1.6. AREA OF HORIZONTAL RUNS BY TRADES <br />1.7.4 CERTIFICATES OF INSURANCE AND BONDS SHALL BE APPROVED BY <br />THE OWNER BEFORE THE SUCCESSFUL BIDDER MAY PROCEED WITH <br />ELECTRICAL: BOTTOM OF ROOF DECK TO 32 IN. BELOW ROOF <br />THE WORK. FAILURE TO PROVIDE EITHER IN A FORM SATISFACTORY <br />DECK; WHERE EXPOSED, IMMEDIATELY BENEATH ROOF DECK, <br />TO THE OWNER SHALL SUBJECT THE CONTRACTOR TO LOSS OF <br />PASSING BETWEEN STEEL JOISTS WHERE POSSIBLE. <br />TIME FROM THE ALLOWABLE CONSTRUCTION PERIOD EQUAL TO THE <br />REFRIGERATION: 32 IN. TO 36 IN. BELOW ROOF DECK; WHERE <br />TIME OF DELAY IN FURNISHING THE REQUIRED MATERIAL. <br />EXPOSED, IMMEDIATELY BELOW BOTTOM CHORD OF STEEL JOIST <br />GIRDERS AND JOISTS. <br />FIRE SPRINKLER: 8 IN. ABOVE CEILING; WHERE EXPOSED, 8 IN. <br />ABOVE BOTTOM CHORD OF STEEL JOIST GIRDERS AND JOISTS. <br />AIR CONDITIONING: 36 IN. BELOW ROOF DECK TO 10 IN. ABOVE <br />CEILING; WHERE EXPOSED, HANG AS CLOSE UNDER BOTTOM CHORD <br />OF STEEL JOIST GIRDERS AND JOISTS AS POSSIBLE WHILE LEAVING <br />ROOM FOR REFRIGERATION LINES. <br />IF DEVIATION FROM THESE AREAS IS INDICATED, SUCH DEVIATION <br />MUST BE AGREED UPON BY THE JOB SUPERINTENDENT AND/OR <br />PUBLIX'S REPRESENTATIVE. <br />2. PRODUCTS <br />NOT USED <br />3. EXECUTION <br />NOT USED <br />END OF SECTION 01 11 00 <br />SECTION 01 23 00 <br />ALTERNATES <br />V02212011 <br />1. GENERAL <br />1.1. TO ENABLE THE OWNER TO EVALUATE THE COST OF ALTERNATE METHODS <br />OF CONSTRUCTION OF THE PROJECT, THE ALTERNATES DESCRIBED IN <br />THIS SECTION ARE REQUIRED TO BE STATED ON THE BID FORM <br />SUBMITTED BY EACH BIDDER. <br />1.2. THE COST OF LABOR AND MATERIAL PAYMENT BOND AND PERFORMANCE <br />BOND SHALL BE LISTED AS AN ADD ALTERNATE. <br />1.3. UNDERSLAB POROUS FILL - IN SOME LOCATIONS THE BUILDING PAD OR <br />SUB -GRADE WILL BE CONSTRUCTED WITH MATERIAL WHICH MEETS THE <br />SPECIFIED REQUIREMENTS FOR UNDER -SLAB POROUS FILL. IN SUCH A <br />CASE THE OWNER MAY CHOOSE TO OMIT UNDER -SLAB POROUS FILL <br />FROM THIS CONTRACT. STATE AN AMOUNT WHICH MAY BE DEDUCTED <br />FROM THE BASE BID FOR THE OMISSION OF MATERIAL, LABOR, AND <br />EQUIPMENT FOR THE INSTALLATION OF UNDER -SLAB POROUS FILL. <br />1.4. HVAC EQUIPMENT - STATE AN AMOUNT WHICH MAY BE ADDED TO THE <br />BASE BID FOR THE INCLUSION OF ROOFTOP HVAC UNITS, THEIR CURBS, <br />AND SUPPORT RAILS. THE CONTRACTOR SHALL SET IN PLACE, INSTALL, <br />AND CONNECT THIS EQUIPMENT WHETHER THIS ALTERNATE IS ACCEPTED <br />OR NOT. <br />2. PRODUCTS <br />NOT USED <br />3. EXECUTION <br />NOT USED <br />END OF SECTION 01 23 00 <br />SECTION 01 25 00 <br />SUBSTITUTIONS PROCEDURES <br />V02212011 <br />1. GENERAL <br />1.1. EACH BIDDER OBLIGATES HIMSELF TO THE USE OF BRANDS, MAKES AND <br />MODELS, MATERIALS AND APPARATUS NAMED IN THIS PROJECT MANUAL <br />AND ON THE ACCOMPANYING DRAWINGS, UNLESS SUBSTITUTE APPROVAL <br />IS OBTAINED IN THE MANNER DESCRIBED HEREIN. <br />1.2. ALL ITEMS, FOR WHICH THERE IS A SPECIFIC PRODUCT OR BRAND <br />DESIGNATED, SHALL BE SUPPLIED AS SPECIFIED. <br />1.3. AFTER BIDDING: NO SUBSTITUTIONS WILL BE CONSIDERED, EXCEPT IN <br />CASES NECESSITATED BY STRIKES, BANKRUPTCY, DISCONTINUATION OF A <br />PRODUCT, ETC., OR WHERE EQUAL PERFORMANCE AND SIGNIFICANT COST <br />SAVINGS WILL RESULT. REQUESTS SHALL BE IN WRITING AND BE <br />ACCOMPANIED BY FULL DESCRIPTIVE DATA. IT IS ASSUMED THAT THE <br />REASON FOR SUBSTITUTING MATERIALS AND METHODS IS BASED ON A <br />COST OR TIME SAVINGS, AND THAT PUBLIX WILL SHARE IN THESE <br />BENEFITS. <br />2. PRODUCTS <br />NOT USED <br />3. EXECUTION <br />NOT USED <br />END OF SECTION 01 25 00 <br />SECTION 01 26 00 <br />CONTRACT MODIFICATION PROCEDURES <br />V02212011 <br />1. GENERAL <br />1.1. DEFINITIONS: REFER TO AIA DOCUMENT A201. <br />1.1.1 THE CONTRACT FOR CONSTRUCTION (THE WORK) <br />IS COMPOSED OF: AGREEMENT (FORM ITSELF, <br />WITH ATTACHMENTS) GENERAL CONDITIONS <br />SPECIFICATIONS DRAWINGS ADDENDA <br />1.1.2 CHANGE ORDERS MODIFY ANY OR ALL OF THE PARTS OF THE <br />CONTRACT WHERE A CHANGE IN COST OR TIME IS REQUIRED. <br />1.1.3 MINOR CHANGES IN THE WORK SHALL BE AS DIRECTED BY THE <br />OWNER'S REPRESENTATIVE. <br />1.1.4 ALIGNED CONTRACTORS SHALL BE BOUND BY PROVISIONS OF <br />THEIR COST PLUS A FEE CONTRACTS. <br />1.2. REVISION REQUEST (THIS IS THE TERM USED TO DESCRIBE THE PROCESS <br />BY WHICH PUBLIX IDENTIFIES ITEMS FOR CHANGE): <br />1.2.1 WHERE A REVISION REQUEST HAS NO ASSOCIATED COST, <br />SUBMIT A LETTER STATING THIS, OR INCLUDE AS A NO COST LINE <br />ITEM ON A CHANGE ORDER. <br />1.2.2 WHERE A REVISION REQUEST REQUIRES AN ADJUSTMENT IN <br />THE CONTRACT SUM, SUBMIT WITHIN 30 DAYS FROM DISTRIBUTION <br />DATE OF REVISION REQUEST AS A CHANGE ORDER OR A LINE ITEM <br />ON A CHANGE ORDER. IF CHANGE ORDER IS NOT RECEIVED WITHIN <br />30 DAYS, IT WILL BE ASSUMED THAT THE REVISION REQUEST IS A <br />NO COST ITEM. <br />1.2.3 WHERE A REVISION REQUEST IS INCLUDED AS A LINE ITEM <br />ON A CHANGE ORDER, INCLUDE THE FOLLOWING AS BACK-UP, <br />BROKEN OUT FOR EACH REVISION REQUEST INDIVIDUALLY. <br />1.2.4 SUBMIT ON FORMS SUPPLIED OR APPROVED BY PUBLIX. <br />1.2.5 REQUIRED INFORMATION: <br />1.2.5.1 LABOR: <br />UNITS OF LABOR X ACTUAL RATE BY CATEGORIES <br />OF LABOR BURDEN BY CATEGORIES <br />TOTAL LABOR BY CATEGORIES <br />1.2.5.2 MATERIAL: <br />UNITS OF MATERIAL X ACTUAL UNIT COST BY CATEGORIES <br />SUBTOTAL BY CATEGORIES <br />%TAX <br />1.2.5.3 CATEGORY TOTAL (OR SUBCONTRACT): TOTAL LABOR <br />TOTAL MATERIAL <br />SUBTOTAL X 7% CATEGORY COST <br />1.2.5.4 RECAP CATEGORIES <br />CATEGORY COST EACH CATEGORY <br />TOTAL COST OF REVISION REQUEST OR CHANGE ORDER <br />2. PRODUCTS <br />NOT USED <br />3. EXECUTION <br />NOT USED <br />END OF SECTION 01 26 00 <br />SECTION 01 33 00 <br />SUBMITTAL PROCEDURES <br />V01172017 <br />1. GENERAL <br />1.1. SUBMIT ALL REQUIRED SHOP DRAWINGS, PRODUCT DATA, SAMPLES, <br />CONCRETE DESIGN MIXES, TEST RESULTS, ETC. TO: <br />PUBLIX SUPER MARKETS, INC. <br />ATTN: FACILITIES DESIGN <br />P.O. BOX 407 (3300 PUBLIX CORPORATE PARKWAY) <br />LAKELAND, FL 33802 (33811) <br />1.2. SUBMITTAL TYPES: <br />1.2.1 LETTERS OF INTENT (L01): <br />1.2.1.1 USE WHERE PROVIDED BY PUBLIX. L01'S SHALL BE <br />FILLED OUT COMPLETELY, WITH ALL OPTIONS MARKED, AND <br />WITH ALL BLANKS FILLED IN, PROPERLY SIGNED BY AN <br />AUTHORIZED AGENT OF THE COMPANY CONCERNED. <br />1.2.1.2 L01 SHALL BE FOLLOWED EXACTLY IN THE FIELD. <br />PROVIDE ADEQUATE INFORMATION AT THE JOB SITE FOR <br />INSTALLERS TO CONFORM TO MANUFACTURERS <br />RECOMMENDATIONS. <br />1.2.1.3 SUBMIT ONLY THE ORIGINAL, SIGNED L01 TO PUBLIX. <br />CONTRACTOR MAY RETAIN AS MANY COPIES AS HE NEEDS. <br />1.2.2 MANUFACTURER'S LITERATURE: <br />1.2.2.1 SUBMIT WHERE REQUIRED BY APPLICABLE PROJECT <br />MANUAL SECTION SUBMIT A MINIMUM THREE COPIES FOR USE <br />OF OWNER AND CONTRACTOR, ADDITIONAL COPIES AS <br />REQUIRED. <br />1.2.2. WHERE MORE THAN ONE OPTION IS DESCRIBED, MARK TO <br />INDICATE MODEL OR TYPE TO BE USED. <br />1.2.3 SHOP DRAWINGS <br />1.2.3.1 SUBMIT FOR THE FOLLOWING: <br />CONCRETE REINFORCING STEEL <br />MASONRY REINFORCEMENT <br />OPEN WEB STEEL JOISTS <br />STRUCTURAL STEEL <br />FIRE SPRINKLERS <br />OTHER ITEMS OF WORK AS REQUIRED <br />1.2.3.2 SUBMIT IN NUMBER PRESCRIBED BY INSTRUCTION <br />LETTER ISSUED AT PRE -CONSTRUCTION MEETING OR, IF NOT <br />SPECIFIED IN LETTER OR INDIVIDUAL SECTIONS, SUBMIT THREE <br />SETS. <br />1.2.3.3 MATERIALS LISTS: <br />1.2.3.4 IDENTIFY ALL PERTINENT CHARACTERISTICS (TYPE, <br />MODEL NUMBER, ETC.) OF MATERIALS INTENDED FOR USE. <br />1.2.3.5 FIRE SPRINKLER SUBMITTALS ONLY: SUBMIT TWO SETS <br />WITH APPROVAL BY FACTORY MUTUAL AND LOCAL AUTHORITY <br />HAVING JURISDICTION. SUBMIT SETS BEARING THE ORIGINAL <br />SIGNATURE OR INITIALS OF THE REVIEWERS. INCLUDE ORIGINAL <br />LETTER FROM FACTORY MUTUAL DETAILING THEIR REVIEW <br />COMMENTS. THESE SETS WILL NOT BE RETURNED. <br />1.2.4 TEST REPORTS: <br />1.2.4.1 WHERE INDICATED, SUBMIT TEST REPORTS TO PROVE <br />COMPLIANCE OF MATERIALS SUPPLIED WITH SPECIFICATION <br />INTENT. <br />1.2.4.2 REPORTS REQUIRED: <br />CONCRETE <br />SOIL AND OTHER GEOLOGICAL TESTS. <br />STEEL INSPECTION REPORT <br />OTHERS AS NEEDED <br />1.2.4.3 NOTE THE REQUIREMENTS STATED ELSEWHERE FOR <br />SAME -DAY SUBMITTAL OF TEST REPORTS INDICATING <br />SUBSTANDARD SOIL OR CONCRETE. <br />1.2.5 SAMPLES: <br />1.2.5.1 WHERE REQUIRED FOR SELECTION OF COLOR, <br />TEXTURE OR OTHER PHYSICAL CHARACTERISTICS, SUBMIT <br />SAMPLES OF MATERIALS INTENDED FOR USE. <br />1.2.5.2 SAMPLES SHALL BE LARGE ENOUGH TO ALLOW <br />ADEQUATE EVALUATION. <br />1.2.5.3 SUBMIT TWO SAMPLES MINIMUM. ONE WILL BE <br />RETAINED BY PUBLIX, THE OTHER WILL BE RETURNED TO THE <br />GENERAL CONTRACTOR FOR USE AT THE JOB SITE. <br />1.2.6 SAMPLE PANELS: <br />1.2.6.1 WHERE REQUIRED BY PUBLIX ARCHITECT, ERECT ON <br />THE JOB SITE WHERE DIRECTED, A SAMPLE PANEL OF MAJOR <br />FINISH WORK. <br />1.2.6.2 SAMPLE PANEL SHALL BE NO LARGER THAN 4'-O" X <br />8' 0", BUT SHALL BE LARGE ENOUGH TO INDICATE JOINT <br />TREATMENT, CORNER TREATMENT, RANGE OF COLORATION, <br />AND OTHER PERTINENT CHARACTERISTICS OF THE INSTALLATION <br />OF MATERIALS SELECTED. <br />1.2.6.3 SAMPLE PANEL WILL BE USED AS THE QUALITY <br />STANDARD FOR THE WORK REPRESENTED. WORK IN PLACE <br />SHALL CONFORM TO THE TREATMENTS SHOWN BY THE SAMPLE <br />PANEL. <br />1.3 SUBMITTAL PROCESS <br />1.3.1 TIME <br />1.3.1.1 LETTERS OF INTENT: RETURN TO PUBLIX NO LATER <br />THAN 2 WEEKS BEFORE COMMENCEMENT OF WORK <br />DESCRIBED, AND NO LATER THAN 60 DAYS FROM PROJECT <br />COMMENCEMENT. <br />1.3.1.2 MARGINAL SOIL, CONCRETE OR OTHER TESTS THAT <br />INDICATE SUBSTANDARD CONDITIONS; SUBMIT TO PUBLIX <br />IMMEDIATELY. <br />1.3.1.3 ALL OTHER SUBMITTALS: RETURN TO PUBLIX NO LATER <br />THAN 2 WEEKS BEFORE COMMENCEMENT OF WORK <br />DESCRIBED, AND NO LATER THAN 60 DAYS FROM <br />PROJECT COMMENCEMENT. <br />1.3.1.4 SUBCONTRACTOR PREPARES SUBMITTAL <br />1.3.1.5 IF LOI IS AVAILABLE, SEND ORIGINAL TO GENERAL <br />CONTRACTOR. <br />1.3.1.6 IF L01 IS NOT AVAILABLE, SEND SIX COPIES OF <br />SUBMITTALS TO GENERAL CONTRACTOR. <br />DEVIATIONS FROM THE SPECIFICATIONS WILLL BE <br />CONSIDERED ONLY IN THE EVENT THAT THOSE PRODUCTS <br />SPECIFIED HAVE BECOME UNAVAILABLE FOR USE. OTHER <br />PRODUCTS MAY BE SUBMITTED ONLY FOR FUTURE <br />CONSIDERATION. <br />1.3.2 GENERAL CONTRACTOR REVIEWS SUBMITTAL <br />1.3.2.1 IF L01 IS SUBMITTED, RECORD ACTION TAKEN AND <br />SEND ON TO PUBLIX. <br />1.3.2.2 APPROVE OR ANNOTATE THE SUBMITTALS, THEN SEND <br />ON TO PUBLIX. <br />1.3.2.3 IF DISAPPROVED, NOTIFY SUBCONTRACTOR. <br />1.3.3 PUBLIX REVIEWS SUBMITTAL <br />1.3.3.1 IF L01 IS SUBMITTED, RECORD. <br />1.3.3.2 APPROVE OR ANNOTATE SUBMITTALS, KEEP FILE COPY, <br />RETURN OTHERS TO GENERAL CONTRACTOR. <br />1.3.3.3 IF DISAPPROVED, NOTIFY GENERAL CONTRACTOR. <br />2. PRODUCTS <br />2.0.1 ALL BUILDING CONSTRUCTION PRODUCTS/MATERIALS USED FOR <br />THE PROJECT ARE TO BE NON- ASBESTOS CONTAINING. <br />ASBESTOS CONTAINING MATERIAL (ACM) BY FEDERAL EPA AND <br />OSHA DEFINITION IS ANY MATERIAL/PRODUCT THAT CONTAINS <br />GREATER THAN (>) 1.0% ASBESTOS. THE FOLLOWING SIX (6) <br />TYPES OF NATURAL OCCURRING ASBESTOS MINERAL FIBERS <br />ARE CURRENTLY REGULATED UNDER EPA AND OSHA; <br />CHRYSOTILE, AMOSITE, CROCIDILITE, TREMOLITE, <br />ANTHOPHYLLITTE AND ACTINOCITE ASBESTOS. PUBLIX WILL <br />REQUIRE A NOTARIZED AFFIDAVIT FROM THE PROJECT <br />CONSTRUCTION CONTRACTOR OR THEIR REPRESENTATIVE <br />STATING THAT THEY HAVE VERIFIED THAT ACM WAS NOT USED <br />OR INSTALLED DURING THE CONSTRUCTION OF THE PUBLIX <br />STRUCTURE. <br />1. EXECUTION <br />NOT USED <br />END OF SECTION 01 33 OOps <br />SECTION 01 50 00 <br />TEMPORARY FACILITIES AND CONTROLS <br />V02212011 <br />1. GENERAL <br />1.1. TEMPORARY REQUIREMENTS: <br />1.1.1 FURNISH TWO CURRENTLY ACCEPTED TYPE HYGIENIC <br />PORTABLE TOILET FACILITIES, AND MAINTAIN SAME. <br />1.1.2 PROVIDE TEMPORARY WATER SUPPLY (3/4"). <br />1.1.3 PROVIDE TEMPORARY ELECTRIC SERVICE FOR POWER AND LIGHTING <br />(208 VOLT, 200 AMP.) <br />1.1.4 ALL TEMPORARY FACILITIES SHALL BE REMOVED WHEN THEIR USE IS <br />NO LONGER REQUIRED. <br />1.1.5 GENERAL CONTRACTOR SHALL PAY OPERATING COSTS OF ALL <br />TEMPORARY SERVICES. <br />1.2. SECURITY: PROVIDE WEATHERTIGHT SHED(S) FOR ALL MATERIALS <br />REQUIRING PROTECTION FROM WEATHER, WITH RAISED FLOORS FOR <br />STORAGE OF CEMENT, LIME, AND SIMILAR ITEMS. <br />1.3. CONSTRUCTION CLEANING: <br />1.3.1 CONTRACTORS SHALL CLEAN CONSTRUCTION SITE DAILY OF ALL <br />RUBBISH AND TRASH WHICH MIGHT BREED MOSQUITOES AND VERMIN, <br />OR WHICH IS HIGHLY COMBUSTIBLE. TRASH WHICH CANNOT BE BURNED <br />BECAUSE BURNING IS NOT ALLOWED BY LOCAL ORDINANCE, OR <br />BECAUSE IT IS NOT COMBUSTIBLE, SHALL BE REMOVED FROM THE SITE <br />AT LEAST WEEKLY. <br />1.3.2 THE CONTRACTOR SHALL CLEAN SWEEP THE FINISHED FLOOR <br />EVERY DAY AND BE SURE THAT THE FINISHED FLOOR IS UNDAMAGED <br />BY EQUIPMENT OR MATERIALS BEING STORED DIRECTLY ON THE FLOOR. <br />A DAILY CHECK OF ROLLING EQUIPMENT SHALL BE MADE FOR OIL OR <br />BATTERY ACID LEAKS. THE CONTRACTOR SHALL CAUTION ALL <br />SUBCONTRACTORS ABOUT PROTECTING THE FINISHED FLOOR FROM <br />STAINING MATERIALS SUCH AS OIL, ACID, CHEWING TOBACCO, <br />CIGARETTES, COFFEE, SOFT DRINKS, AND TIRE SKID MARKS FROM <br />ROLLING EQUIPMENT. <br />1.3.3 PROVIDE FINAL CLEAN-UP OF ENTIRE SITE AND BUILDING <br />INTERIOR AND EXTERIOR, INCLUDING THE ROOF BEFORE REQUESTING <br />SUBSTANTIAL COMPLETION INSPECTION. <br />1.4. FIELD OFFICE <br />1.4.1 PROVIDE WEATHERTIGHT SHED OR TRAILER WITH RAISED FLOORS WITH <br />ADEQUATE SPACE FOR CONTRACTOR'S AND ARCHITECT'S NEEDS. <br />1.4.2 TELEPHONE: INSTALL IN FIELD OFFICE FOR DURATION OF <br />CONSTRUCTION WORK. PROVIDE OUTDOOR BELL OR BELLS TO PERMIT <br />HEARING RING FROM ANY PART OF CONSTRUCTION SITE. <br />1.4.3 CONTRACTOR SHALL KEEP MIN. OF 3 HARD HATS IN FIELD <br />OFFICE FOR USE BY AUTHORIZED VISITORS. THESE HATS SHALL BE <br />KEPT IN A CLEAN AND PRESENTABLE CONDITION. <br />1.4.4 CONTRACTOR SHALL AT ALL TIMES MAINTAIN A COMPLETE SET <br />OF UP-TO-DATE CONTRACT DOCUMENTS IN THE FIELD OFFICE. <br />DOCUMENTS WHICH HAVE BEEN SUPERCEDED SHALL BE DESTROYED OR <br />CLEARLY MARKED <br />2. PRODUCTS <br />NOT USED <br />3. EXECUTION <br />NOT USED <br />END OF SECTION 01 50 00 <br />SECTION 01 66 00 <br />PRODUCT STORAGE AND HANDLING REQUIREMENTS <br />V02212011 <br />1. GENERAL <br />1.1. WALK-IN COOLERS AND FREEZERS, AND ASSOCIATED EVAPORATOR COILS <br />AND ROOFTOP REFRIGERATION EQUIPMENT <br />1.1.1 THE GENERAL CONTRACTOR SHALL SCHEDULE A DELIVERY DATE <br />FOR THIS EQUIPMENT, WHICH DATE SHALL NOT BE CHANGED LATER <br />THAN TWO WEEKS PRIOR TO THE SCHEDULED DATE.THE FOLLOWING ARE <br />PREREQUISITES TO DELIVERY: <br />1.1.1.1 A STABILIZED ROADWAY MUST BE COMPLETED FROM A <br />PUBLIC STREET TO AND AROUND THE PUBLIX BUILDING. ROADWAY <br />AND TRACK AROUND BUILDING SHALL ACCOMODATE THE SIZE AND <br />TYPE OF CRANE REQUIRED TO SET STEEL AND ROOF -TOP <br />EQUIPMENT. <br />1.1.1.2 ALL INTERIOR SLABS MUST BE POURED. <br />1.1.1.3 ALL PORTIONS OF THE BUILDING MUST BE DRIED IN. <br />1.1.1.4 THE AREA AROUND THE BUILDING MUST BE <br />ACCESSIBLE SO THAT A CRANE WILL BE ABLE TO LIFT THE UNITS <br />FROM THE GROUND TO THEIR ROOFTOP LOCATIONS. <br />1.1.1.5 ON STORES WHICH HAVE ROOFTOP MACHINE ROOMS <br />FOR HOUSING REFRIGERATION EQUIPMENT, THE CONTRACTOR MUST <br />BE PREPARED TO MAKE MACHINE ROOMS WEATHER-PROOF <br />IMMEDIATELY AFTER THE EQUIPMENT IS SET IN PLACE. <br />1.1.1.6 IF THE DELIVERY DATE MUST BE CHANGED LESS THAN <br />TWO WEEKS PRIOR TO A SCHEDULED DELIVERY DATE, THE <br />CONTRACTOR SHALL BEAR ALL COSTS FOR STORAGE, DEMURRAGE, <br />RETURN AND RESHIPPING, ETC. <br />1.2. REFRIGERATED CASES: <br />1.2.1 THE GENERAL CONTRACTOR SHALL SCHEDULE A DELIVERY DATE <br />FOR THIS EQUIPMENT, WHICH DATE SHALL NOT BE CHANGED LATER <br />THAN TWO WEEKS PRIOR TO THE SCHEDULED DATE. THE FOLLOWING <br />ARE PREREQUISITES TO DELIVERY: <br />1.2.1.1 A STABILIZED ROADWAY MUST BE COMPLETED TO THE <br />REAR OF THE PUBLIX BUILDING. <br />1.2.1.2 THE CASES WILL BE UNLOADED ON THE CONCRETE PAD AT <br />THE REAR OF THE STORE. THIS PAD MUST HAVE BEEN POURED AND <br />CURED FOR AT LEAST THREE DAYS PRIOR TO DELIVERY OF THE CASES. <br />1.2.1.3 THE BUILDING SHALL BE SECURE. THE GENERAL <br />CONTRACTOR SHALL SIGN FOR RECEIPT OF THE CASES AND BE <br />RESPONSIBLE FOR THEM, EXCEPT FOR ANY DAMAGE CAUSED BY <br />PUBLIX' INSTALLATION CREW OR REFRIGERATION CONTRACTOR. <br />1.2.1.4 THE FINISHED FLOOR MUST BE COMPLETELY FINISHED, <br />CLEANED, POLISHED, STAINS REMOVED, AND SEALED. <br />1.2.1.5 THE INTERIOR OF THE STORE SALES AREA MUST BE <br />ESSENTIALLY COMPLETE, INCLUDING PAINTING, CEILINGS, WALL <br />COVERINGS, WALL TILE, CANOPIES, ETC. <br />1.2.1.6 THE AREA WHERE CASES ARE TO BE LOCATED MUST BE SWEPT <br />CLEAN. <br />1.2.1.7 ELECTRICAL WIRING MUST BE PULLED AND READY FOR <br />CONNECTION. <br />1.3. LIGHT FIXTURES: <br />1.3.1 THE GENERAL CONTRACTOR SHALL NOTIFY PUBLIX WHEN HE IS <br />READY TO ACCEPT LIGHT FIXTURES. <br />1.3.2 THE GENERAL CONTRACTOR SHALL SIGN FOR RECEIPT OF <br />THE LIGHT FIXTURES AND BE RESPONSIBLE FOR THEM. <br />1.3.3 THE LIGHT FIXTURES SHALL BE STORED IN A SECURE LOCATION <br />ON THE JOB -SITE. THE WALK-IN COOLERS AND FREEZERS MAY BE <br />USED FOR THIS PURPOSE. <br />2. PRODUCTS <br />NOT USED <br />3. EXECUTION <br />` NOT USED <br />END OF SECTION 01 66 00 <br />SECTION 01 77 00 <br />CLOSEOUT PROCEDURES <br />V02212011 <br />1. GENERAL <br />1.1. ELECTRIC SERVICE: PAYMENT FOR ELECTRIC SERVICE WILL BECOME THE <br />MARKETS RESPONSIBILITY OF PUBLIX SUPER, INC. AT THE EARLIER OF <br />TWO DATES: <br />1.1.1 THE DATE PUBLIX STARTS UP THE REFRIGERATION SYSTEM <br />PERMANENTTLY. q�� qN� g�� Q q� �N p 7 <br />S� 5yEM SHAT S6pGCOMPLETEDEBIff% THISH6A ffFRIGERATION <br />1.1.1.2 THE AIR CONDITIONING SYSTEM MUST ALSO BE STARTED <br />BY THIS DATE; THE CONTRACTOR MAY START THE AIR <br />CONDITIONING EARLIER BUT PUBLIX WILL NOT PAY FOR ELECTRIC <br />SERVICE. <br />1.1.2 THE DATE OF SUBSTANTIAL COMPLETION AS ESTABLISHED BELOW. <br />1.2. THE FOLLOWING REQUIREMENTS FOR SUBSTANTIAL COMPLETION <br />SUPPLEMENT THOSE IN AIA DOCUMENT A201 GENERAL CONDITIONS OF <br />THE CONTRACT FOR CONSTRUCTION, PARAGRAPH 9.8. <br />1.2.1 WHEN SUBSTANTIAL COMPLETION IS NEAR, PUBLIX WILL AT THE <br />REQUEST OF THE CONTRACTOR PREPARE A LIST OF ITEMS TO BE <br />COMPLETED OR CORRECTED. ALL ITEMS ON THIS "PUNCH LIST" MUST <br />BE CORRECTED OR COMPLETED TO THE SATISFACTION OF PUBLIX' <br />REPRESENTATIVE, EXCEPT THOSE ITEMS WHICH PUBLIX MAY <br />SPECIFICALLY ALLOW TO BE DEFERRED TO FINAL INSPECTION, BEFORE <br />THE INSPECTION FOR SUBSTANTIAL COMPLETION WILL BE SCHEDULED. <br />1.2.2 THE FOLLOWING ITEMS ARE AMONG THOSE THAT MUST BE <br />COMPLETED PRIOR TO INSPECTION FOR SUBSTANTIAL COMPLETION: <br />1.2.2.1 THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY AND/OR <br />A CERTIFICATE OF USE BY AUTHORITIES HAVING JURISDICTION. <br />1.2.2.2 CLEAN THE ENTIRE WORK AND SITE OF ALL TRASH AND <br />USED MATERIAL. ALL EQUIPMENT, FIXTURES, GLASS, METAL, ETC. <br />SHALL BE CLEANED, READY FOR USE WITH ALL SHIPPING <br />LABELS, MANUFACTURER'S REMOVABLE LABELS, ETC. REMOVED. <br />1.2.2.3 MAKE ALL FLOORS READY FOR USE BY CLEANING. <br />POSTING OF ALL REQUIRED OPERATING INSTRUCTIONS FOR <br />EQUIPMENT. <br />1.2.2.4 POSTING OF TYPEWRITTEN PANEL BOARD SCHEDULES. <br />1.2.2.5 LABELING OF ALL LINES AND CONTROLS AS REQUIRED. <br />1.2.2.6 SITEWORK (SIGNAGE, PAVING, STRIPING, SITE UTILITIES, <br />LANDSCAPING, DOT REQUIREMENTS, AND OTHER ANCILLARY WORK) <br />PERFORMED UNDER THIS CONTRACT OR OTHER CONTRACTS. <br />1.2.3 AFTER PUBLIX' REPRESENTATIVE HAS APPROVED THE <br />DISPOSITION OF ALL ITEMS ON THE PUNCH LIST, PUBLIX WILL SET A <br />DATE FOR INSPECTION FOR SUBSTANTIAL COMPLETION. DISCREPANCIES <br />NOTED DURING THIS INSPECTION MAY BE CAUSE FOR WITHHOLDING <br />ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION AT THE <br />DISCRETION OF PUBLIX' REPRESENTATIVE. OTHERWISE, A CERTIFICATE <br />OF SUBSTANTIAL COMPLETION WILL BE ISSUED PROMPTLY. <br />1.3. THE FOLLOWING REQUIREMENTS FOR FINAL PAYMENT SUPPLEMENT <br />THOSE IN AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT <br />FOR CONSTRUCTION, PARAGRAPH 9.10. THE CONTRACTOR SHALL NOTIFY <br />PUBLIX WHEN ALL DEFERRED PUNCH LIST ITEMS HAVE BEEN CORRECTED, <br />AT WHICH TIME PUBLIX WILL SET A DATE FOR INSPECTION FOR FINAL <br />PAYMENT. <br />1.3.1 THE FOLLOWING ITEMS ARE AMONG THOSE WHICH MUST BE <br />COMPLETED PRIOR TO THE INSPECTION FOR FINAL PAYMENT: <br />1.3.1.1 RECEIPT BY PUBLIX OF THE PROJECT RECORD DOCUMENTS <br />SPECIFIED IN SECTION 01 78 39. <br />1.3.1.2 RECEIPT BY PUBLIX OF A CLOSEOUT BOOK, WHICH <br />SHALL CONTAIN THE FOLLOWING: <br />LIST OF ALL SUB -CONTRACTORS, <br />SUB -SUB -CONTRACTORS, AND SUPPLIERS. <br />ALL REQUIRED GUARANTIES AND WARRANTIES. <br />ALL OPERATING MANUALS, SERVICE INSTRUCTIONS, <br />AND PARTS DATA. <br />1.4. AT A TIME APPROXIMATELY ONE YEAR AFTER SUBSTANTIAL COMPLETION <br />PUBLIX WILL SCHEDULE THE ONE-YEAR INSPECTION OF THE PROJECT. <br />THE CONTRACTOR SHALL SEND A REPRESENTATIVE. THE CONTRACTOR <br />SHALL CORRECT ANY WORK FOUND NOT TO BE IN ACCORDANCE WITH <br />THE REQUIREMENTS OF THE CONTRACT DOCUMENTS, AS SET FORTH IN <br />AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR <br />CONSTRUCTION, PARAGRAPH 12.2.2. <br />2. PRODUCTS <br />NOT USED <br />3. EXECUTION <br />NOT USED <br />END OF SECTION 01 77 00 <br />SECTION 01 78 39 <br />PROJECT RECORD DOCUMENTS (AS -BUILT DRAWINGS) <br />V01182012 <br />1. GENERAL <br />1.1. SUMMARY: <br />1.1.1 PUBLIX WILL SUPPLY A COMPACT DISC WITH TIFF IMAGES OF <br />THE CONSTRUCTION DOCUMENTS PREPARED BY PUBLIX SUPER <br />MARKETS, INC. TO THE GENERAL CONTRACTOR UPON AWARDING OF <br />BID. THE GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR <br />REPRODUCTION OF HARD COPIES TO COMPLETE THE REQUIREMENTS <br />OF THIS SECTION REGARDING THE JOB SET AND FINAL RECORD <br />DOCUMENTS. <br />1.1.2 THROUGHOUT PROGRESS OF THE WORK, MAINTAIN AN ACCURATE <br />RECORD OF CHANGES IN THE CONTRACT DOCUMENTS, AND, UPON <br />COMPLETION OF THE WORK, TRANSFER THE RECORDED CHANGES TO A <br />SET OF "FINAL RECORD DOCUMENTS", AS DESCRIBED IN ARTICLE 1.5 <br />BELOW. <br />1.1.3 THE PURPOSE OF THE FINAL PROJECT RECORD DOCUMENTS IS <br />TO PROVIDE ACCURATE INFORMATION REGARDING ALL ASPECTS OF THE <br />PROJECT, BOTH CONCEALED AND VISIBLE, SO MAINTENANCE AND <br />FUTURE MODIFICATION OF THE WORK MAY PROCEED WITHOUT EXTENSIVE <br />INVESTIGATION OF EXISTING CONDITIONS. <br />1.2. FINAL PROJECT RECORD SET APPROVALS: <br />1.2.1 PUBLIX' REPRESENTATIVE'S APPROVAL OF THE STATUS OF THE <br />FINAL PROJECT RECORD DOCUMENTS MAY BE A PREREQUISITE TO <br />PUBLIX' APPROVAL OF REQUESTS FOR PROGRESS PAYMENTS. <br />1.2.2 PRIOR TO SUBMITTING REQUEST FOR INSPECTION FOR FINAL <br />PAYMENT, SUBMIT THE FINAL PROJECT RECORD DOCUMENTS TO PUBLIX. <br />FINAL PAYMENT WILL NOT BE APPROVED UNTIL DOCUMENTS ARE <br />RECEIVED BY PUBLIX. <br />1.2.3 DELIVER THE ORIGINAL AND TWO COPIES OF FINAL PROJECT RECORD <br />DOCUMENTS TO PUBLIX'S REPRESENTATIVE WITHIN 30 DAYS OF OWNER <br />ACCEPTANCE. <br />1.3. QUALITY ASSURANCE: DELEGATE RESPONSIBILITY FOR MAINTENANCE OF <br />FINAL PROJECT RECORD DOCUMENTS TO ONE PERSON ON THE <br />CONTRACTOR'S STAFF AS APPROVED BY PUBLIX' REPRESENTATIVE. <br />1.4. MAINTENANCE OF JOB SET <br />1.4.1 JOB SET: DESIGNATE ONE OF THE SETS OF CONTRACT <br />DOCUMENT DRAWINGS PROVIDED TO THE CONTRACTOR AT THE START OF <br />THE PROJECT AS THE FINAL PROJECT RECORD DOCUMENT JOB SET. <br />IMMEDIATELY IDENTIFY EACH SHEET OF THE DOCUMENTS WITH THE TITLE <br />"RECORD DOCUMENTS - JOB SET." <br />1.4.2 THOROUGHLY COORDINATE CHANGES WITHIN THE RECORD <br />DOCUMENTS. MAKE ADEQUATE ENTRIES ON EACH SHEET OF PUBLIX' <br />PROTOTYPE PROJECT MANUAL, THE SUPPLEMENTAL ARCHITECTURAL AND <br />ENGINEERING DRAWINGS AND SPECIFICATIONS, AND THE CIVIL <br />ENGINEERING, LANDSCAPING, AND SITE UTILITIES DRAWINGS. <br />1.4.3 DO NOT USE THE JOB SET FOR ANY PURPOSE EXCEPT ENTRY OF <br />NEW DATA AND FOR REVIEW BY PUBLIX' REPRESENTATIVE, UNTIL START OF <br />TRANSFER OF DATA TO THE FINAL RECORD DOCUMENTS. <br />1.4.4 MAKE ENTRIES ON THE JOB SET WITHIN 24 HOURS AFTER <br />RECEIPT OF INFORMATION THAT A CHANGE HAS OCCURRED. <br />1.4.5 MAINTAIN THE JOB SET OF FINAL PROJECT RECORD DOCUMENTS <br />COMPLETELY PROTECTED FROM DETERIORATION AND FROM LOSS OR <br />DAMAGE UNTIL COMPLETION OF THE WORK AND TRANSFER OF ALL <br />RECORDED DATA TO THE FINAL PROJECT RECORD DOCUMENTS. <br />1.4.6 IN THE EVENT OF LOSS OF RECORDED DATA, USE MEANS <br />NECESSARY TO AGAIN SECURE THE DATA TO PUBLIX' REPRESENTATIVE'S <br />APPROVAL. SUCH MEANS SHALL INCLUDE REMOVAL AND REPLACEMENT <br />OF CONCEALING MATERIALS IF THIS IS NECESSARY IN THE OPINION OF <br />PUBLIX' REPRESENTATIVE. <br />1.4.7 CHANGE DATA: MAKE CHANGE ENTRIES ON DRAWINGS AS FOLLOWS: <br />1.4.7.1 MAKE ENTRIES IN ERASABLE COLORED PENCIL. <br />1.4.7.2 CALL ATTENTION TO EACH ENTRY BY DRAWING A <br />"CLOUD" AROUND EACH AREA AFFECTED; DATE ALL ENTRIES. <br />1.4.7.3 IN THE EVENT OF OVERLAPPING CHANGES, USE A <br />DIFFERENT COLOR FOR SUBSEQUENT CHANGES, SO THAT <br />THE FINAL CONSTRUCTION IS EVIDENT. <br />1.4.8 SCHEMATIC CONVERSION DATA: <br />1.4.8.1 SHOW ON THE JOB SET OF RECORD DRAWINGS, BY <br />DIMENSION, ACCURATE TO WITHIN ONE INCH, THE LOCATION OF <br />EACH RUN OF UNDERGROUND CONDUIT, PIPE, ETC. CLEARLY <br />IDENTIFY EACH ITEM BY ACCURATE NOTE SUCH AS "PVC. DRAIN", <br />"GAL. WATER", AND THE LIKE. CLEARLY NOTE THE DEPTH OF EACH <br />RUN BENEATH THE FINISHED FLOOR. <br />1.4.8.2 CALL ATTENTION TO EACH ENTRY BY DRAWING A <br />"CLOUD" AROUND EACH AREA AFFECTED. <br />1.5. FINAL PROJECT RECORD DOCUMENTS <br />1.5.1 OBTAIN BASE DRAWINGS FOR FINAL RECORD DOCUMENTS: AT <br />A TIME NEARING THE COMPLETION OF THE WORK, SECURE FROM <br />THE ARCHITECT AT NO CHARGE TO THE CONTRACTOR ONE COMPLETE <br />SET OF CONTRACT DOCUMENT DRAWINGS. <br />1.5.2 APPROVAL OF RECORDED DATA PRIOR TO TRANSFER: FOLLOWING <br />RECEIPT OF THE SET OF BASE DRAWINGS OF THE FINAL RECORD <br />DOCUMENTS, AND PRIOR TO THE START OF TRANSFER OF DATA FROM <br />THE JOB SET TO THE FINAL RECORD DOCUMENTS, SECURE THE REVIEW <br />AND APPROVAL OF ALL RECORDED DATA BY PUBLIX' REPRESENTATIVE. <br />MAKE ALL REQUIRED REVISIONS TO THE JOB SET. <br />1.5.3 AFTER APPROVAL, CAREFULLY TRANSFER CHANGE DATA AND <br />SCHEMATIC CONVERSION DATA SHOWN ON THE JOB SET OF RECORD <br />DRAWINGS TO THE CORRESPONDING SHEETS, CALLING ATTENTION TO <br />EACH ENTRY BY DRAWING A "CLOUD" AROUND THE AFFECTED AREA. <br />DATES OF CHANGES ARE NOT REQUIRED. USE PROPER MEDIA TO <br />ASSURE LONGEVITY AND CLEAR REPRODUCTION. <br />2. PRODUCTS <br />NOT USED <br />3. EXECUTION <br />NOT USED <br />END OF SECTION 01 78 39 <br />SECTION 05 12 00 <br />STRUCTURAL STEEL FRAMING <br />V05202015 <br />1. GENERAL <br />1.1. SCOPE OF WORK <br />1.1.1 FURNISH ALL MATERIALS, LABOR, EQUIPMENT AND SERVICES <br />NECESSARY AND INCIDENTAL TO COMPLETE INSTALLATION OF <br />STRUCTURAL STEEL WORK INDICATED, IMPLIED ON CONTRACT DRAWINGS, <br />OR AS SPECIFIED. <br />1.1.2 THE CONTRACTOR SHALL COOPERATE WITH OTHER TRADES <br />REGARDING INSTALLATION OF ASSOCIATED WORK AS NEEDED TO <br />SUPPORT HVAC UNITS, FANS, AND OTHER ROOFTOP EQUIPMENT, ROOF <br />PENETRATION FRAMES FOR PLUMBING, AND OTHER ITEMS REQUIRING <br />SUPPORT FROM THE STEEL STRUCTURE. <br />1.2. QUALIFICATIONS: <br />1.2.1 FABRICATOR: NOT LESS THAN 5 YEARS EXPERIENCE IN <br />FABRICATION OF STRUCTURAL STEEL FOR PROJECTS OF SIMILAR SCOPE. <br />1.2.2 STEEL ERECTOR: NOT LESS THAN 5 YEARS EXPERIENCE IN THE <br />ERECTION OF STRUCTURAL STEEL STRUCTURES OF SIMILAR MAGNITUDE <br />OF THE PROPOSED STRUCTURE. <br />1.3. REFERENCES: THE FOLLOWING SPECIFICATIONS, CODES AND STANDARDS <br />OF CURRENT ISSUE (HEREAFTER REFERRED TO BY ACRONYM OR <br />ALPHA/NUMERIC DESIGNATION ONLY) FORM A PART OF THIS <br />SPECIFICATION: <br />1.3.1 THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION: <br />1.3.1.1 AISC "SPECIFICATION FOR THE DESIGN, FABRICATION AND <br />ERECTION OF STRUCTURAL STEEL FOR BUILDINGS". <br />1.3.1.2 AISC "CODE OF STANDARD PRACTICE". <br />1.3.1.3 "STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS", APPROVED <br />BY THE RESEARCH COUNCIL ON RIVET AND BOLTED STRUCTURAL JOINTS. <br />1.3.1.4 AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND <br />BRIDGES". <br />1.3.1.4.1 PARAGRAPH 4.2.1 OF THE ABOVE CODE IS HEREBY MODIFIED <br />BY THE DELETION OF THE FOLLOWING SENTENCE: "THIS APPROVAL <br />CONSTITUTES THE OWNER'S ACCEPTANCE OF ALL RESPONSIBILITY <br />FOR THE DESIGN ADEQUACY OF ANY CONNECTIONS DESIGNED BY <br />THE FABRICATOR AS PART OF HIS PREPARATION OF THESE SHOP <br />DRAWINGS." <br />1.3.2 AMERICAN WELDING SOCIETY: <br />1.3.2.1 AWS, "STRUCTURAL WELDING CODE" <br />1.3.2.2 AWS, "WELDING SYMBOLS" <br />1.3.2.3 AWS, "GAS METAL -ARC WELDING WITH CO2 SHIELDING" <br />1.3.2.4 AWS, "NON-DESTRUCTIVE TESTING SYMBOLS" <br />1.3.3 AMERICAN SOCIETY OF TESTING MATERIALS (ASTM) <br />1.3.3.1 A6, "GENERAL REQUIREMENTS OF DELIVERY" <br />1.3.3.2 A325, H.S. BOLTS <br />1.4. SUBMITTALS <br />1.4.1 PROVIDE SUBMITTALS IN ACCORDANCE WITH SECTION 01 33 00 <br />SUBMITTAL PROCEDURES. <br />1.4.2 SHOP DRAWINGS AND STEEL REPORTS: AT LEAST TWO WEEKS PRIOR TO <br />STEEL FABRICATION, SUBMIT SHOP DRAWINGS, PREPARED UNDER THE <br />SUPERVISION OF A PROFESSIONAL ENGINEER, TOGETHER WITH COPIES OF <br />THE METALLURGICAL TEST REPORTS (MILL REPORTS), PURCHASE ORDERS FOR <br />ALL STEEL, AND OTHER DATA TO SHOW COMPLIANCE WITH SPECIFICATIONS. <br />1.4.3 INDICATE ALL SHOP ERECTION DETAILS, INCLUDING CUTS, COPES <br />CONNECTIONS, HOLES, BOLTS, WELDS, AND PREPARATION REQUIRED, SUCH AS <br />BEVELS, TESTING AND BACKUP BARS. <br />INDICATE ALL WELDS, BOTH SHOP AND FIELD, BY AWS "WELDING <br />SYMBOLS", A2.0, LATEST EDITION. <br />2. PRODUCTS <br />2.1. MATERIALS <br />2.1.1 ALL MATERIAL SHALL BE NEW, CLEAN, AND FREE FROM SCALE OR RUST. <br />CONFORM TO APPLICABLE ASTM DESIGNATIONS AS DESCRIBED IN <br />THE MOST CURRENT AISC SPECIFICATIONS. <br />2.1.2 STEEL BEAMS: ASTM A992, FY=50 KSI. <br />2.1.3 STEEL TUBE COLUMNS: HSS SHALL BE ASTM A500, GRADE B, FY=46 KSI. <br />2.1.4 ROUND PIPE COLUMNS: ASTM A53, GRADE B, FY=35 KSI. <br />2.1.5 STEEL PLATES, CHANNELS, BARS AND ANGLES: ASTM A36 <br />2.1.6 BOLTS <br />2.1.6.1 STRUCTURAL BOLTS: ASTM A325, TYPE 1 <br />2.1.6.2 "TWIST -OFF" TYPE TENSION CONTROL BOLT ASSEMBLIES: <br />ASTM F1852 LEJEUNE TENSION CONTROL BOLTS. <br />2.1.7 ARC WELDING ELECTRODES: E70 SERIES. <br />2.1.8 GROUT: NON-METALLIC SHRINK -RESISTANT, COMPLYING WITH U.S.A. CORPS. <br />OF <br />ENGINEERS CRD-C-621 AND CRD-C-588. <br />NS GROUT, EUCLID CHEMICAL COMPANY CRYSTEX, L&M <br />CONSTRUCTION CHEMICALS MASTERFLOW 713, MASTER <br />BUILDERS <br />FIVE STAR GROUT, U.S. GROUT CORP. PROPAK, PROTEX <br />INDUSTRIES, INC. CONSTRUCTION GROUT, BASF <br />VIBROPRUF NO. 11, LAMBERT CORP. <br />2.1.9 PRIMER: MANUFACTURER'S STANDARD SHOP PRIMER, UNLESS OTHERWISE <br />NOTED. <br />3. EXECUTION <br />3.1. DESIGN AND FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL <br />3.1.1 IN GENERAL, AISC SPECIFICATION SHALL BE FOLLOWED. <br />3.1.2 IN GENERAL, ALL SHOP AND FIELD CONNECTIONS SHALL BE BOLTED IN <br />ACCORDANCE WITH THE SPECIFICATIONS OF THE AISC, UNLESS OTHERWISE <br />INDICATED. <br />3.1.3 ALL CONNECTIONS SHALL BE DESIGNED TO DEVELOP THE FULL STRENGTH <br />OF THE BEAM SECTION SHEAR. ALL ERECTION BOLTS SHALL BE SET <br />UP -RIGHT AND LEFT IN PLACE. BOLTED CONNECTIONS CARRYING STRESS <br />SHALL HAVE WASHERS UNDER ALL NUTS, AND FULL GRIP WITH NUTS <br />TORQUED TIGHT AS REQUIRED, CONFORMING TO "SPECIFICATION FOR <br />STRUCTURAL JOINTS USING ASTM A325 BOLTS". <br />3.1.4 BOLTS SHALL HAVE FULL SHANKS EXTENDED THROUGH CONNECTING MEMBERS. <br />3.1.5 SHEARING AND CLIPPING SHALL BE NEATLY AND ACCURATELY DONE. NO <br />COLUMN SPLICES ARE PERMITTED. NO SPLICES ARE PERMITTED IN BEAMS, <br />EXCEPT FOR FIELD CONNECTIONS INDICATED. <br />3.1.6 ALL BOLT HOLES ARE TO BE ACCURATELY DRILLED OR PUNCHED <br />PERPENDICULAR TO METAL SURFACE. THE PIECES FORMING ONE BUILT <br />MEMBER SHALL BE STRAIGHT AND FIT CLOSELY TOGETHER, ESPECIALLY <br />WHERE OPEN TO VIEW. IN COMPRESSION JOINTS, DEPENDING ON CONTACT <br />BEARING, THE SURFACES SHALL BE TRULY FACED, SO AS TO HAVE EVEN <br />BEARING AFTER ADJOINING MEMBERS ARE ALIGNED AND SET UP COMPLETE. <br />CONTINUOUS MEMBERS SHALL HAVE POSITIVE, FULL CONNECTIONS. <br />3.1.7 DO NOT FLAME -CUT OR ENLARGE HOLES BY BURNING. <br />3.1.8 FABRICATE AND ASSEMBLE STRUCTURAL STEEL IN SHOP TO GREATEST EXTENT <br />POSSIBLE. <br />3.2. ALL MILLED SURFACES SHALL BE PROTECTED WITH A COATING OF HEAVY <br />OIL OR GREASE. <br />3.3. PROVIDE ALL ANCHOR BOLTS AND PLATES AT ALL STEEL COLUMNS OF A <br />SIZE AS SHOWN OR DETAILED ON THE STRUCTURAL DRAWINGS, OR AS <br />REQUIRED FOR MAXIMUM LOAD OF COLUMNS, PER AISC. <br />3.4. WELDING: <br />3.4.1 IN GENERAL, ALL WELDING SHALL CONFORM TO THE REQUIREMENTS OF <br />THE CODE FOR ARC AND GAS WELDING IN BUILDING CONSTRUCTION AS <br />PRESCRIBED BY THE AMERICAN WELDING SOCIETY AS AMENDED TO DATE. <br />3.4.2 WELDING SHALL BE PERFORMED BY WELDERS CURRENTLY QUALIFIED <br />UNDER AWS STANDARD QUALIFICATION PROCEDURES TO PERFORM THE TYPE <br />OF WORK REQUIRED. PROOF OF CURRENT AWS CERTIFICATION OF PERSONNEL <br />SHALL BE AVAILABLE AT THE FABRICATION SHOP AND AT THE JOB SITE AT <br />ALL TIMES. <br />3.5. SHOP PAINTING: ALL STEEL WORK SHALL BE THOROUGHLY CLEANED OF <br />ALL LOOSE MILL SCALE, RUST, AND FOREIGN MATTER AS DIRECTED IN <br />SSPC-SP #3 SPECIFICATION FOR POWER TOOL CLEANING, AND GIVEN <br />ONE COAT OF PRIMER. PRIMER SHALL BE WELL WORKED INTO ALL <br />JOINTS. PRIME ONLY WHEN SURFACE METAL IS DRY AND GREASE FREE. <br />COMPLY WITH STEEL STRUCTURES PAINTING COUNCIL (SSPC)-3. <br />THICKNESS OF COATINGS SHALL BE 2.5 MIL. <br />3.6. MISCELLANEOUS STEEL <br />3.6.1 PIPE RAILINGS: 1-1/2" DIAMETER STANDARD PIPE; ALL WELDED <br />CONNECTIONS. ALL PIPE RAILING SHALL BE GALVANIZED AFTER FABRICATION. <br />3.6.2 FURNISH AND INSTALL ALL HANGERS AND CHANNELS FOR CURTAIN WALLS. <br />3.7. FURNISH THE FOLLOWING ITEMS FOR INSTALLATION BY PROPER TRADES. <br />3.8. INSTALLATIONCHANNEL DOOR FRAMES; CORNER GUARDS; <br />6" PIPE COLUMNS FOR DOOR AND DOWNSPOUT GUARDS; TRAFFIC POST3.8.1 STEEL <br />ERECTION GENERAL: THIS SHALL INCLUDE THE ERECTION OF ALL <br />STRUCTURAL STEEL, STEEL JOIST GIRDERS AND JOISTS, MISCELLANEOUS <br />STEEL, ETC. AS CALLED FOR ON THE DRAWINGS AND AS SPECIFIED. <br />MAINTAIN ERECTION TOLERANCES OF STRUCTURAL STEEL WITHIN AISC'S <br />"CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES". <br />3.8.2 PROVIDE TEMPORARY SHORES, GUYS, BRACES, AND OTHER SUPPORTS <br />DURING ERECTION TO KEEP STRUCTURAL STEEL SECURE, PLUMB, AND IN <br />ALIGNMENT AGAINST TEMPORARY CONSTRUCTION LOADS. REMOVE TEMPORARY <br />SUPPORTS WHEN PERMANENT STRUCTURAL STEEL, CONNECTIONS, AND <br />BRACING ARE IN PLACE, UNLESS OTHERWISE INDICATED. <br />3.8.3 SET STRUCTURAL STEEL ACCURATELY IN LOCATIONS AND TO <br />ELEVATIONS INDICATED AND ACCORDING TO AISC SPECIFICATIONS <br />REFERENCED IN THIS SECTION. <br />3.8.4 BASE AND BEARING PLATES: CLEAN CONCRETE AND MASONRY BEARING <br />SURFACES TO REMOVE DELETERIOUS MATERIALS AND ROUGHEN SURFACES <br />PRIOR TO SETTING BASE AND BEARING PLATES. CLEAN BOTTOM SURFACE <br />OF BASE AND BEARING PLATES. <br />3.8.4.1 SET BASE AND BEARING PLATES FOR STRUCTURAL MEMBERS ON <br />WEDGES, SHIMS, OR SETTING BOLTS AS REQUIRED. <br />3.8.4.2 TIGHTEN ANCHOR BOLTS AFTER SUPPORTED MEMBERS HAVE BEEN <br />POSITIONED AND PLUMBED. DO NOT REMOVE WEDGES OR SHIMS BUT, IF <br />PROTRUDING, CUT OFF FLUSH WITH EDGE OF BASE OR BEARING PLATE <br />PRIOR TO PACKING WITH GROUT. <br />3.8.4.3 PACK GROUT SOLIDLY BETWEEN BEARING SURFACES AND PLATES <br />SO NO VOIDS REMAIN. FINISH EXPOSED SURFACES. PROTECT INSTALLED <br />MATERIALS AND ALLOW TO CURE. <br />3.8.4.4 COMPLY WITH MANUFACTURER'S INSTRUCTIONS FOR <br />PROPRIETARY GROUT MATERIALS. <br />3.8.5 ALIGN AND ADJUST VARIOUS MEMBERS FORMING PART OF COMPLETE <br />FRAME OR STRUCTURE BEFORE PERMANENTLY FASTENING. BEFORE ASSEMBLY, <br />COMPLETE BEARING SURFACES AND OTHER SURFACES THAT WILL BE IN <br />PERMANENT CONTACT. PERFORM NECESSARY ADJUSTMENTS TO COMPENSATE <br />FOR DISCREPANCIES IN ELEVATION AND ALIGNMENT. <br />3.8.6 LEVEL AND PLUMB INDIVIDUAL MEMBERS OF STRUCTURE. <br />3.8.7 INSTALL AND TIGHTEN HIGH -STRENGTH BOLTS ACCORDING TO RCSC'S <br />"SPECIFICATION FOR <br />STRUCTURAL JOINTS USING ASTM A-325 OR A-490 BOLTS. <br />3.8.8 WELD CONNECTIONS: COMPLY WITH AWS D1.1 FOR PROCEDURES, <br />APPEARANCE AND QUALITY OF WELDS, AND METHODS USED IN CORRECTING <br />WELD WORK. <br />3.8.9 COMPLY WITH AISC SPECIFICATIONS REFERENCED IN THIS SECTION FOR <br />BEARING, ADEQUACY OF TEMPORARY CONNECTIONS, ALIGNMENT, AND REMOVAL <br />OF PAINT ON SURFACES ADJACENT TO FIELD WELDS. <br />3.8.10 TOUCH UP WELD SPOTS AND ABRASIONS AFTER ERECTION WITH PRIMER <br />SPECIFIED FOR SHOP PRIMING. SURFACES SHALL BE CLEAN AND DRY <br />BEFORE PAINTING. <br />3.9. FIELD QUALITY CONTROL <br />3.9.1 NO FIELD CUTTING OR FABRICATION WILL BE PERMITTED WITHOUT <br />WRITTEN APPROVAL OF <br />PUBLIX' STRUCTURAL ENGINEER. <br />3.9.2 TESTING AGENCY: CONTRACTOR SHALL ENGAGE AN INDEPENDENT TESTING AND <br />INSPECTION AGENCY TO PERFORM FIELD INSPECTIONS AND TESTS AND TO PREPARE TEST <br />REPORTS. <br />AA� <br />a/ <br />N <br />­1C. <br />00 <br />� (= <br />CD 0 <br />U <br />N <br />I <br />� <br />+-� M <br />O�O� <br />zft <br />N� <br />C4.0 <br />0 <br />� � <br />O .� <br />IO `O <br />U <br />a � <br />I- � <br />0 <br />N , <br />�� <br />-9 <br />O <br />Q-I 4-I <br />i 12 <br />u <br />Wv 0 <br />0 <br />_ <br />a: a <br />..J <br />W <br />g 9 <br />(D5 _ <br />• 4 CL <br />to 0 <br />WO <br />0 <br />� <br />Q <br />u _J <br />O <br />U <br />.� <br />0 <br />N <br />Q <br />m <br />N <br />Z W <br />> <br />� <br />Z F- <br />N <br />w <br />0 <br />w <br />ai <br />v <br />W <br />C) <br />O <br />~p <br />O <br />o <br />a_ <br />U <br />. <br />VJ <br />W <br />e <br />�N <br />I..L <br />Q <br />Q <br />Nm <br />I.L <br />< <br />d <br />W <br />F-� <br />C? <br />O , <br />co <br />d <br />W � <br />M <br />U U- <br />X <br />w <br />MJ <br />■ <br />mZ <br />r�W <br />0 <br />Z <br />w <br />M <br />J <br />U <br />qql- <br />CN <br />t- <br />4t <br />U) <br />Z <br />O <br />C2 <br />G <br />O <br />) <br />Of <br />(V <br />0 <br />2 I' <br />a-� <br />W m <br />cM <br />M <br />N o <br />W <br />O <br />0 LL <br />M XJ <br />m <br />z-JJ <br />J� <br />0m _ <br />a <br />W <br />W a_ tiN <br />x <br />`r° <br />C <br />W cp <br />w Lo <br />* <br />, <br />. a <br />; W <br />a-tom' <br />O <br />r <br />�� <br />�_�•._ <br />to J <br />•* <br />rn <br />0 <br />N <br />J <br />M <br />N <br />J <br />r__ <br />m <br />m <br />0) <br />U) <br />i� <br />. <br />J <br />8 <br />Lu <br />rn <br />O <br />o <br />z <br />M <br />N <br />U <br />CCo <br />N <br />W <br />� <br />z <br />V <br />14 <br />N <br />w <br />o <br />� <br />� <br />a <br />o <br />o <br />0 <br />oo� 2019 <br />Hawkins Construction, Inc. <br />llll <br />- sue.- '_.i�F 1' ['1. r`,�ri 1� ?: k_ _1�s L I _tr: �{� ?f' :� �t'M1f 5," <br />�+ _ <br />