Laserfiche WebLink
w <br />1.5.6 SPRINKLER LOCATION: ALL SPRINKLERS SHALL BE LOCATED AS SHOWN ON <br />ENGINEER'S DRAWINGS, AND AS REQUIRED BY CODES, INCLUDING VESTIBULES AND <br />CANOPY ATTIC AREAS. <br />1.5.7 STORAGE AREAS; ORDINARY HAZARD GROUP II: PROVIDE A HYDRAULICALLY <br />DESIGNED WET SYSTEM TO PROVIDE 0.30 GPM/SQ. FT. INCLUDING THE MOST <br />REMOTE 2000 SQ. FT. SPACING OF SPRINKLERS SHALL NOT EXCEED 100 SQ. <br />FT. PER SPRINKLER. <br />1.5.8 SALES AREAS, WORK AREAS, ORDINARY HAZARD GROUP II: PROVIDE A <br />HYDRAULICALLY DESIGNED WET SYSTEM TO PROVIDE 0.18 GPM/SQFT FOR <br />ALL AREAS INCLUDING THE MOST REMOTE 2500 SO. FT. <br />1.5.9 HYDRAULIC CALCULATIONS SHALL INCLUDE A TOTAL ALLOWANCE OF 250 <br />GPM FOR OUTSIDE AND INSIDE HOSE STREAMS. <br />1.6. SHOP DRAWINGS, CALCULATIONS AND APPROVALS <br />1.6.1 DO NOT BEGIN WORK UNTIL THE SHOP DRAWINGS AND CALCULATIONS <br />HAVE BEEN APPROVED BY PUBLIX SUPER MARKETS AND BY THE AUTHORITY <br />HAVING JURISDICTION. <br />1.6.2 ANY PROPOSED VALUE ENGINEERING CHANGES MUST BE SUBMITTED TO <br />THE PUBLIX <br />ENGINEER PRIOR TO SUBMITTING ANY SHOP DRAWING AND CALCULATIONS. <br />1.6.3 SUBMIT SHOP DRAWINGS AND CALCULATIONS SIMULTANEOUSLY TO THE <br />PUBLIX SUPER MARKETS ENGINEER AND THE AUTHORITY HAVING <br />JURISDICTION FOR APPROVAL, AND TO MARSH CONSULTING FOR REVIEW. <br />1.6.4 UPON RECEIVING APPROVAL OF THE AUTHORITY HAVING JURISDICTION, <br />SUBMIT EVIDENCE OF THIS APPROVAL TO THE PUBLIX SUPER MARKETS <br />ENGINEER. <br />1.1. QUALITY: <br />1.7.1 SUBCONTRACTOR: <br />1.7.1.1 THE FIRE SPRINKLER SUBCONTRACTOR SHALL BE A REPUTABLE <br />FIRM REGULARLY ENGAGED IN THIS TYPE OF WORK, EMPLOYING <br />SKILLED WORKMEN, AND WITH PROPER EQUIPMENT. WORK SHALL BE <br />PERFORMED BY A FIRM LICENSED AS A CLASS 1 OR II FIRE SPRINKLER <br />CONTRACTOR. <br />1.7.1.2 UPON REQUEST, SUBCONTRACTOR SHALL SHOW EVIDENCE OF AT <br />LEAST TWO SIMILAR JOBS, OF COMPARABLE SIZE AND CHARACTER, <br />INSTALLED AND OPERATING WITHIN THE TWO YEARS PRIOR TO BID <br />OPENING. <br />1.7.1.3 PUBLIX RESERVES THE RIGHT TO REFUSE ANY SUBCONTRACTOR <br />WITH OR WITHOUT DISCLOSING CAUSE. <br />1.7.2 PERSONNEL: <br />1.7.2.1 EMPLOY AN EXPERIENCED SUPERINTENDENT TO OVERSEE ALL <br />OPERATION. <br />1.7.2.2 WORK SHALL NOT PROCEED WITHOUT ADEQUATE SUPERVISION <br />PRESENT AT ALL TIMES. FOREMAN SHALL BE A JOURNEYMAN <br />SPRINKLER FITTER. <br />1.7.2.3 WORK SHALL BE PERFORMED BY WORKERS CERTIFIED IN THEIR <br />TRADE AS JOURNEYMEN, AND APPRENTICES IN ACCORDANCE WITH <br />REGULATIONS OF THE GOVERNING AUTHORITY OR CUSTOMARY PRACTICE. <br />UTILIZE WORKERS WITH SKILLS IN PROPORTION TO COMPLEXITY OF <br />TASKS REQUIRED. <br />1.7.2.4 PUBLIX RESERVES THE RIGHT TO REFUSE ASSIGNMENT OF <br />WORKERS TO PUBLIX WORK WITH OR WITHOUT DISCLOSING CAUSE. <br />1.7.3 QUALITY STANDARDS <br />1.7.3.1 WORK SHALL BE ACCOMPLISHED TO ENSURE LEAK -PROOF INSTALLATION <br />1.7.3.2 WORK WILL BE JUDGED BY PUBLIX IN COMPARISON TO WORK OF <br />SIMILAR TYPES. <br />SUBSTANDARD CONSTRUCTION AS JUDGED BY PUBLIX REPRESENTATIVE <br />WILL NOT BE ACCEPTED. <br />1.7.3.3 NEATNESS COUNTS. MAKE ALL JOINTS, CONNECTIONS, UNIONS, <br />ETC. WITH PROPER CARE TO INSURE THAT TIGHT CONNECTIONS ARE <br />MADE WITHOUT EXCESS MATERIAL, WELL SECURED TO SUPPORTS. <br />1.7.3.4 INSTALL PIPING WITH RUNS STRAIGHT, ACCURATELY FORMED RADII <br />AT BENDS, AND ADEQUATE SUPPORTS. <br />1.2. PRESSURE TEST: <br />1.8.1 PERFORM TESTING AS REQUIRED BY NFPA 13 AND AUTHORITIES HAVING <br />JURISDICTION. <br />TEST RESULTS SHALL BE CERTIFIED BY THESE AGENCIES. <br />1.8.2 AS A MINIMUM, TEST ALL PIPING AND EQUIPMENT UNDER HYDROSTATIC <br />PRESSURE OF 200 POUNDS PER SQUARE INCH FOR A 2 HOUR CONTINUOUS <br />PERIOD. <br />1.8.3 CORRECT ALL DEFECTS REVEALED BY TEST. <br />1.8.4 RETEST AS REQUIRED UNTIL SYSTEM IS LEAK FREE UNDER TEST CONDITIONS. <br />1. PRODUCTS <br />1.1. HEADS <br />2.1.1 ALL SPRINKLER HEADS SHALL BE UL LISTED, FACTORY MUTUAL <br />APPROVED, AND THE PRODUCT OF ONE MANUFACTURER. <br />2.1.2 APPROVED MANUFACTURER'S: <br />VIKING <br />VICTUALIC <br />TYC 0 <br />RELIABLE <br />GLOBE <br />2.1.3 SPRINKLER HEADS SHALL BE STANDARD RESPONSE THERMOSENSITIVE <br />GLASS BULB STYLE, STANDARD PRESSURE RATED TO 175 PSI. <br />2.1.4 SPRINKLERS WITH 1/21I ORIFICES SHALL HAVE 1/21I NPT CONNECTIONS, <br />17/321I ORIFICES SHALL HAVE 3/41I NPT CONNECTIONS, DRY PENDANT <br />HEADS SHALL HAVE 1" NPT CONNECTIONS. <br />2.1.5 AREAS WITH SUSPENDED CEILINGS: USE CHROME RECESSED OR <br />SEMI -RECESSED TYPE SPRINKLERS RATED AT 155 DEGREES F. UNLESS <br />OTHERWISE NOTED ON THE PLAN. <br />2.1.6 IN AREAS WITH EXPOSED STRUCTURE: <br />2.1.6.1 SALES/CUSTOMER AREAS: USE BRASS UPRIGHT TYPE SPRINKLERS <br />RATED AT 155 DEGREES F. WHERE SUSPENDED CEILING OCCURS USE <br />CHROME PENDANT TYPE SPRINKLERS RATED AT 155 DEGREES F. <br />PROVIDE CHROME TWO-PIECE ESCUTCHEONS. <br />2.1.6.2 STORAGE, AND OTHER AREAS NOT USED BY CUSTOMERS: USE <br />BRASS UPRIGHT TYPE, RATED AT 155 DEGREES F. <br />2.1.7 COOLER/FREEZER AREAS: PROVIDE 175 DEGREE F DRY PENDANT <br />SPRINKLERS. SEAL PIPE PENETRATION AND INSULATE PIPE TO 1'-01I ABOVE <br />TOP OF COOLER/FREEZER INSULATION PANEL. MINIMUM BARREL LENGTH <br />SHALL BE 18". <br />2.1.7.1 APPROVED MANUFACTURERS: VIKING & RELIABLE <br />1.2. PROVIDE SPARE SPRINKLER HEADS AND WRENCHES. PROVIDE NUMBER OF <br />CABINETS, SPARE SPRINKLER HEADS IN LOCATIONS REQUIRED BY NFPA 13. <br />MINIMUM CABINET SIZE SHALL BE FOR <br />12 HEADS. <br />1.3. DRY SYSTEMS: WHERE REQUIRED BY LOCAL AUTHORITIES, THE SYSTEM SHALL BE <br />CONTROLLED BY A SEPARATE WALL OR POST INDICATOR VALVE AND DRY PIPE <br />VALVE. VALVES ARE TO BE EQUIPPED WITH AN AIR COMPRESSOR, LOW AIR <br />TROUBLE ALARM, AND SUPERVISORY SWITCHES. CONTROL VALVES FOR EITHER <br />SHALL BE LOCATED 4'-6" ABOVE FINISHED FLOOR. <br />2.3.1 AIR COMPRESSORS FOR DRY SYSTEMS WILL BE DIRECT DRIVE, ELECTRIC <br />MOTOR DRIVEN, AIR COOLED, WITH THERMAL OVERLOAD PROTECTION. UNITS <br />SHALL BE FULLY AUTOMATIC, WITH A UL LISTED PRESSURE SWITCH, CHECK <br />VALVE AND SAFETY VALVE, OIL -LESS PISTON COMPRESSOR, AND <br />PERMANENTLY LUBRICATED BEARINGS. INCLUDE AIR FILTERS AND RISER <br />MOUNTING KITS. SEE CONSTRUCTION DRAWINGS FOR POWER REQUIREMENTS, <br />2.3.1.1 APPROVED MANUFACTURER: GENERAL AIR PRODUCTS. <br />1.4. BACK FLOW DEVICES: PROVIDE A FACTORY MUTUAL APPROVED BACK FLOW DEVICE <br />WHERE <br />REQUIRED BY LOCAL CODES. AT STORES LOCATED NORTH OF FLORIDA ROUTE <br />60, SET ASSEMBLY IN INSULATED BELOW -GROUND CONCRETE VAULT OR <br />PROVIDE MEANS OF FREEZE PROTECTION. <br />1.5. INSPECTOR'S TEST CONNECTION SHALL BE PIPED TO FLOOR LEVEL ON THE INSIDE <br />OF THE BUILDING, THEN STUBBED THROUGH THE WALL AND PIPED TO GRADE. <br />CONFORM TO REQUIREMENTS OF NFPA 13 AND FACTORY MUTUAL. <br />1.6. RISER ASSEMBLY SHALL INCLUDE ALARM VALVE WITH DPDT WATER FLOW SWITCH, <br />WATER MOTOR ALARM, ELECTRICALLY SUPERVISED GATE VALVE, MAIN DRAIN AND <br />PRESSURE GAUGES. WATER FLOW SWITCH AND TAMPER SWITCH. RISER ASSEMBLY <br />SHALL BE LOCATED IN REAR OF STORE. ALL RISERS SHALL BE INTERIOR RISERS. <br />SYSTEM CONTROL VALVE SHALL BE A WALL OR POST INDICATOR TYPE. <br />1.7. PROVIDE PIPE SLEEVES FOR ALL PIPES PASSING THROUGH CONCRETE FLOORS AND <br />FOR ALL PIPES PASSING THROUGH CONCRETE AND MASONRY WALLS. <br />1.8. PROVIDE ESCUTCHEONS FOR ALL EXPOSED PIPES PASSING THROUGH FLOORS AND <br />WALLS. <br />ESCUTCHEONS SHALL BE CHROME PLATED STEEL OR STAINLESS STEEL, <br />TWO-PIECE HINGED, FASTENED WITH SET SCREW, SIZE TO SUIT. WHERE <br />SUBJECT TO CORROSION (OUTSIDE) USE STAINLESS STEEL ONLY. <br />1.9. TAMPER SWITCHES: PROVIDE SYSTEMS SENSOR SUPERVISORY SWITCH OSY2 FOR <br />OUTSIDE SCREW AND YOKE GATE VALVES, OR PIBV2 FOR POST INDICATOR GATE <br />VALVES, TO BE WIRED BY OTHERS. <br />1.10. ALL FITTINGS SHALL BE U.L. AND FACTORY MUTUAL APPROVED AND STAMPED <br />AND SHALL CONFORM TO THE REQUIREMENTS OF NFPA. #13 AND THE FACTORY <br />MUTUAL APPROVAL GUIDE, EXCEPT THAT NO IISLIPII TYPE FITTINGS ARE TO BE <br />USED. <br />1.11. PIPING: <br />2.11.1 PIPING SHALL CONFORM TO THE REQUIREMENTS OF NFPA. #13 AND THE <br />FACTORY MUTUAL APPROVAL GUIDE. PIPING MAY BE GROOVED, THREADED <br />AND/OR WELDED IF ALL COMPONENTS AND METHODS ARE FACTORY MUTUAL <br />APPROVED. <br />2.11.2 UNDERGROUND SERVICE PIPING: <br />2.11.2.1 PIPE: AWWA C900, PVC, AWWA C151, DUCTILE IRON PIPE <br />2.11.2.2 FITTINGS AND JOINTS: AWWA C110 & C115, DUCTILE IRON PIPE <br />ANSI B16.1 CAST IRON PIPE, FOR SIZES 31I-481I. <br />2.11.3 ABOVE GROUND SERVICE PIPING: <br />2.11.3.1 SPRINKLER PIPING: ASTM-A795 AND ASTM A35 FOR BLACK AND <br />HOT DIPPED, ZINC COATED (GALVANIZED) WELDED AND SEAMLESS <br />STEEL PIPE. ASTM A135 FOR ELECTRIC RESISTANCE WELDED STEEL <br />PIPE. <br />2.11.3.1.1 EXTERIOR WET/DRY SPRINKLER PIPING & FITTINGS: GALVANIZED STEEL. <br />2.11.3.1.2 INTERIOR WET SPRINKLER PIPING & FITTINGS: BLACK STEEL. <br />2.11.3.1.3 INTERIOR DRY SPRINKLER PIPING & FITTINGS: GALVANIZED STEEL. <br />2.11.3.2 PIPE SIZES 11I-21I SHALL BE SCHEDULE 40. <br />2.1 1 .3.3 PIPE SIZES 2 1 /21I - 611 SHALL BE SCHEDULE 10. <br />2.11.4 FIRE DEPARTMENT CONNECTION PIPING: <br />2.11.4.1 INTERIOR: SAME AS INTERIOR SPRINKLER PIPING ABOVE. <br />2.11.4.2 EXTERIOR: SAME AS EXTERIOR SERVICE PIPING ABOVE. WHERE <br />STUBBED -UP FOR CONNECTIONS ABOVE GRADE, USE STANDARD WEIGHT <br />GALVANIZED STEEL PIPE WITH GALVANIZED MALLEABLE IRON SCREW <br />FITTINGS. <br />2.11.5 DRAIN PIPING: SCHEDULE 40 GALVANIZED STEEL SCREWED PIPE WITH <br />CAST IRON DRAINAGE PATTERN SCREW FITTINGS. <br />1.12. VALVES: <br />2.12.1 DRAIN VALVES, TEST VALVES, AND CONTROL VALVES SHALL BE FITTED <br />WITH FM APPROVED ENAMELED SIGNS INDICATING THEIR USE. <br />2.12.2 GATE VALVES <br />2.12.2.1 NON RISING STEM: 411 - 121I IRON BODY, 175 LB. SERVICE <br />RATING, FLANGED CONNECTIONS. UL LISTED, FACTORY MUTUAL <br />APPROVED. BOLTED BONNET INDICATOR, BOLT PATTER, SOLID BRONZE <br />OR RESILIENT WEDGE. <br />NIBCO F609 <br />2.12.2.2 OUTSIDE SCREW AND YOKE: 411 - 12" IRON BODY 200 LB. <br />SERVICE RATING, FLANGED CONNECTIONS. UL LISTED, FACTORY MUTUAL <br />APPROVED. EPDXY COATED INTERIOR/EXTERIOR. PREGROOVED STEM <br />FOR SUPERVISORY SWITCH, RESILIENT WEDGE. <br />NIBCO F607RW <br />2.12.2.3 OTHER APPROVED MANUFACTURER'S: MUELLER <br />KENNEDY <br />STOCKHAM <br />WATTS <br />2.12.3 ALARM CHECK VALVES: 319 - 811 IRON BODY, 175 LB. SERVICE RATING, <br />FLANGED OR GROOVED CONNECTION. UL LISTED, FACTORY MUTUAL APPROVED. <br />VERTICAL MOUNTED WITH COMPLETE TRIM FOR VARIABLE PRESSURE. BOLTED <br />HAND HOLE COVER. EPDM RUBBER CLAPPER SEAL. <br />2.12.3.1 WET ALARM CHECK VALVES: CENTRAL MODEL F <br />OR G <br />VIKING MODEL J-1 <br />RELIABLE MODEL E <br />2.12.3.2 RETARD CHAMBERS: CENTRAL MODEL F <br />VIKING C-1 <br />RELIABLE MODEL E-1 <br />2.12.3.3 DRY ALARM CHECK VALVES: CENTRAL MODEL <br />C <br />VIKING F-1 <br />VICTUALIC SERIES 756 FIRELOCK <br />2.12.3.4 ACCELERATORS AND EXHAUSTERS: CENTRAL <br />MODEL A <br />VIKING MODEL E-1 <br />VICTUALIC SERIES 746 <br />2.12.4 DOUBLE CHECK DETECTOR ASSEMBLY: IRON BODY, 175 LB. SERVICE <br />RATING. UL LISTED FACTORY MUTUAL APPROVED. EPDXY COATED <br />INTERIOR/EXTERIOR. DUCTILE IRON OR STAINLESS STEEL CLAPPER, EPDM <br />RUBBER SEAL. RESILIENT WEDGE OUTSIDE SCREW AND YOKE GATE VALVES. <br />FEBCO 856, WATTS 757DCDA - OSY OR EQUAL AS APPROVED BY PUBLIX <br />ENGINEER. <br />2.12.5 INDICATOR POSTS: IRON BODY. UL LISTED, FACTORY MUTUAL APPROVED <br />FOR USE WITH NON- RISING STEM GATE VALVES: <br />NIBCO NIPIAJ UPRIGHT POST OR NIP2AJ WALL POST <br />GRINNELL KENNEDY MUELLER STOCKHAM <br />2.12.6 DRAIN VALVES: ANGLE OR GLOBE TYPE AS REQUIRED. <br />JENKINS 108-A ANGLE OR 106A GLOBE OR EQUAL AS APPROVED BY PUBLIX <br />ENGINEER. <br />2.12.7 CHECK VALVES: FACTORY MUTUAL APPROVED SWING CHECK VALVES <br />INSTALLED HORIZONTALLY, IRON BODY, BRONZE MOUNTED, 175 POUND <br />SERVICE RATING. <br />1.13. RISER AND FIRE DEPARTMENT CONNECTION <br />2.13.1 RISER: PROVIDE RISER WHERE INDICATED ON THE DRAWINGS. RISER <br />SHALL HAVE ALARM VALVE, COMPLETE WITH VALVE TRIMMINGS, GAUGES, <br />AND ALL REQUIRED ACCESSORY EQUIPMENT. PROVIDE APPROVED ELECTRIC <br />FLOW SWITCH WHERE INDICATED ON THE DRAWINGS. <br />2.13.2 INSPECTOR'S TEST CONNECTION: 111 INSPECTORS TEST VALVE, DRAIN <br />VALVE AND PIPE EXTENDING TO DRAIN INDICATED ON DRAWINGS. SYSTEM <br />SHALL ALSO BE CONNECTED INTO THE CENTRAL FIRE ALARM SYSTEM. <br />2.13.3 FIRE DEPARTMENT CONNECTIONS: FACTORY MUTUAL APPROVED FLUSH <br />TYPE FIRE DEPARTMENT CONNECTIONS 41I F.I.P.T. OUTLET AND TWO <br />2-1/21I NSHT INLETS WITH LETTERED NAMEPLATE. ALL EXPOSED PARTS <br />SHALL BE ROUGH BRASS AND POLISHED TRIM; PLATE SHALL BE LETTERED <br />"AUTOMATIC SPRINKLER", "FIRE DEPARTMENT CONNECTIONS". <br />1.14. GAUGES <br />2.14.1 PRESSURE GAUGES SHALL BE INSTALLED AS REQUIRED BY CODE, FACTORY <br />MUTUAL APPROVED <br />4-1/21I DIAL TYPE, AND SHALL HAVE A MAXIMUM LIMIT OF NOT LESS <br />THAN TWICE THE NORMAL WORKING PRESSURE AT THE POINT WHERE <br />INSTALLED. <br />2.14.2 CONTROL VALVES, DRAIN VALVES, CHECK VALVES, IDENTIFICATION TAGS <br />AND DRAIN PIPING SHALL BE APPROVED FOR FIRE SERVICE AND SHALL <br />CONFORM TO THE REQUIREMENTS SET FORTH IN NFPA. #13. <br />2. EXECUTION <br />2.1. GENERAL <br />3.1.1 ARCHITECTURAL AND STRUCTURAL DRAWINGS SHALL BE USED FOR BUILDING <br />CONSTRUCTION, <br />DIMENSIONS AND SPECIFIC LOCATIONS. <br />3.1.2 PERFORM ALL CUTTING AND FITTING REQUIRED FOR WORK OF THIS <br />SECTION IN ROUGH CONSTRUCTION OF THE BUILDING, AND IN AREAS OF <br />EXISTING BUILDINGS AND STRUCTURES AS REQUIRED BY ALTERATIONS AND <br />CONNECTIONS TO EXISTING. <br />3.1.3 ALL PATCHING OF FINISHED CONSTRUCTION OF NEW AND EXISTING <br />BUILDINGS SHALL BE BY THE GENERAL CONTRACTOR UNDER THE SECTIONS <br />OF SPECIFICATIONS COVERING THOSE MATERIALS. <br />3.1.4 SUBCONTRACTOR SHALL PERFORM ALL EXCAVATION AND BACKFILL <br />REQUIRED FOR SERVICES, INSIDE AND OUTSIDE THE BUILDING. CUTTING OF <br />CURBS, WALKS, CONCRETE AND PAVING REQUIRED BY THE EXCAVATION <br />SHALL BE DONE BY SUBCONTRACTOR. ANY ROCK SHALL BE EXCAVATED 3 <br />INCHES BELOW THE LAYING DEPTH, AND THE TRENCH SHALL BE BACKFILLED <br />WITH SAND 3 INCHES DEEP. OVER EXCAVATION SHALL BE ADDED IN 12 INCH <br />LAYERS AND MECHANICALLY COMPACTED. FLOODING OR PUDDLING NOT <br />PERMITTED. ALL PIPING WHICH WILL BE UNDER WALKS, PLANTERS, ARCADES, <br />PARKING LOTS, CONCRETE OR ASPHALT SHALL BE MECHANICALLY COMPACTED <br />IN 12 INCH LAYERS. PIPE UNDER DRIVEWAYS SHALL HAVE A MINIMUM COVER <br />0 F 3 FT. <br />3.1.5 VERIFY ALL FIELD DIMENSIONS AND LOCATIONS OF EQUIPMENT AND <br />FIXTURES WITHIN THE LAYOUT AS ESTABLISHED BY THE GENERAL <br />CONTRACTOR TO INSURE CLOSE, NEAT FIT, WITH OTHER TRADES WORK. <br />3.1.6 NO UNDERGROUND PIPING SHALL BE COVERED UNTIL INSPECTED <br />BY PUBLIX' REPRESENTATIVE AND AUTHORITY HAVING JURISDICTION. <br />3.1.7 WHERE THE WORK IS DEPENDENT UPON WORK OF OTHER TRADES OR <br />WORK ALREADY IN PLACE FOR ITS PROPER INSTALLATION, EXAMINE SUCH <br />OTHER WORK AND SEE THAT IS IN THE PROPER CONDITION AND STATE OF <br />COMPLETION BEFORE CONTINUING THE INSTALLATION. <br />3.1.8 INCLUDE THE SERVICES OF AN EXPERIENCED SUPERINTENDENT, WHO <br />SHALL BE CONSTANTLY IN CHARGE OF THE WORK, TOGETHER WITH QUALIFIED <br />JOURNEYMEN REQUIRED TO PROPERLY UNLOAD, INSTALL, CONNECT, ADJUST, <br />START AND OPERATE AND TEST THE WORK INVOLVED, INCLUDING EQUIPMENT <br />AND MATERIALS FURNISHED BY OTHERS AND BY OWNER. ALL WORK SHALL <br />BE EXECUTED IN A FIRST CLASS WORKMANLIKE MANNER. WORKMANSHIP THAT, <br />IN THE OPINION OF PUBLIX, IS SUBSTANDARD OR SHODDY, SHALL BE <br />REMOVED AND REPLACED WITH ACCEPTABLE WORK AT NO COST TO PUBLIX. <br />3.1.9 FOLLOW DRAWINGS IN LAYING OUT WORK AND CHECK DRAWINGS OF <br />OTHER TRADES TO VERIFY SPACES IN WHICH WORK WILL BE INSTALLED. <br />COORDINATE WORK WITH OTHER TRADES. MAINTAIN MAXIMUM HEADROOM AND <br />SPACE CONDITIONS AT ALL POINTS. WHERE HEADROOM OR SPACE CONDITIONS <br />APPEAR INADEQUATE, NOTIFY ARCHITECT BEFORE PROCEEDING WITH <br />INSTALLATION. <br />2.2. AREA OF HORIZONTAL RUNS BY TRADES: SEE SECTION 01 11 00 SUMMARY OF <br />WORK. <br />2.3. CONCEAL ALL PIPING ABOVE SUSPENDED CEILING WHERE PRACTICAL. <br />2.4. IF DIRECTED BY ARCHITECT, THE SUBCONTRACTOR SHALL, WITHOUT EXTRA CHARGE, <br />MAKE REASONABLE MODIFICATIONS IN THE LAYOUT AS NEEDED TO PREVENT <br />CONFLICT WITH WORK OF OTHER TRADES OR FOR PROPER EXECUTION OF THE <br />WORK. <br />2.5. PROVIDE QUALIFIED INSTALLERS. INSTALL MATERIALS, APPARATUS AND EQUIPMENT IN <br />NEAT, WORKMANLIKE MANNER. <br />2.6. COOPERATE WITH THE WORK OF OTHER TRADES TO PREVENT CONFLICT OR <br />INTERFERENCE AND TO AID RAPID COMPLETION OF THE OVERALL PROJECT. <br />WORK OF OTHER TRADES. DO NOT INSTALL DAMAGED MATERIALS AND EQUIPMENT; <br />REMOVE THEM FROM THE SITE. <br />2.8. INSTALL DROPS FOR SPRINKLER HEADS IN AREAS WITH FINISHED CEILING. <br />SPRINKLER HEADS IN TILE CEILINGS SHALL BE LOCATED WITHIN 1 1 /21I OF THE <br />CENTER OF TILE. COORDINATE THE EXACT LOCATION OF THE CEILING GRID WITH <br />THE CEILING CONTRACTOR. <br />2.9. EXAMINE ALL WORK OF OTHERS. IF ANY CONDITIONS EXIST WHICH WILL PREVENT <br />SATISFACTORY INSTALLATION OF MATERIALS OR EQUIPMENT THE ARCHITECT SHALL <br />BE NOTIFIED IN WRITING. STARTING OF WORK WITHOUT NOTIFICATION INDICATES <br />ACCEPTANCE, AND ANY OR ALL CHANGES REQUIRED WILL BE AT CONTRACTOR'S <br />EXPENSE. <br />2.10. KEEP THE JOB SITE FREE FROM ACCUMULATIONS OF WASTE MATERIALS AND <br />RUBBISH. LEAVE THE JOB SITE AND WORK IN CLEAN, ORDERLY AND ACCEPTABLE <br />CONDITION. CLEAN ALL MATERIALS AND EQUIPMENT OF DIRT, DUST, PAINT, SPOTS <br />AND STAINS, SOIL MARKS AND OTHER FOREIGN MATTER. <br />2.11. THE INSIDE SPRINKLER PIPING SHALL BE INSTALLED IN SUCH A MANNER THAT <br />THERE WILL BE NO LEAKAGE. <br />2.12. THERE SHALL BE NO ON SITE WELDING OF SPRINKLER PIPING. <br />2.13. INSTALL, TEST AND FLUSH THE FIRE PROTECTION UNDERGROUND FROM THE <br />"POINT OF SERVICE" TO THE BUILDING IN ACCORDANCE WITH NFPA. 24. <br />2.14. REQUIREMENTS FOR FINAL ACCEPTANCE AND PAYMENT: <br />3.14.1 THE ENTIRE SYSTEM SHALL BE TESTED UNDER HYDROSTATIC PRESSURE. <br />THIS PRESSURE SHALL BE 50 PSI GREATER THAN PRESSURE IN THE MAIN, <br />BUT IN NO CASE LESS THAN 200 PSI. THE TEST PRESSURE SHALL BE <br />MAINTAINED FOR TWO (2) HOURS. PROPERLY EXECUTED TEST CERTIFICATE <br />SHALL BE SENT TO FACTORY MUTUAL ENGINEERING ASSOCIATION AND PUBLIX' <br />REPRESENTATIVE UPON COMPLETION. <br />3.14.2 FURNISH PUBLIX' REPRESENTATIVE WITH A COMPLETE SET OF ALL <br />MANUFACTURER'S WARRANTIES AND INSTRUCTIONS, AND WITH TWO SETS <br />OF AS -BUILT DRAWINGS. <br />3.14.3 OBTAIN FINAL INSPECTION AND TEST REQUIRED BY THE AUTHORITIES <br />HAVING JURISDICTION FOR THEIR ACCEPTANCE OF THE SYSTEM; PROVIDE <br />ADEQUATE ADVANCE NOTICE TO PUBLIX' REPRESENTATIVE OF SUCH <br />INSPECTION AND TEST; FURNISH PUBLIX' REPRESENTATIVE WITH EVIDENCE OF <br />ACCEPTANCE OF THE SYSTEM BY THE LOCAL AUTHORITY HAVING <br />JURISDICTION. <br />3.14.4 CONTRACTOR'S MATERIAL AND TEST CERTIFICATES FOR UNDERGROUND <br />PIPING/ ABOVEGROUND PIPING SHALL BE COMPLETED ON THE APPROPRIATE <br />NFPA 13 FORM AND SUBMITTED TO THE OWNER AND THE AUTHORITY HAVING <br />JURISDICTION. <br />3.14.5 THE SYSTEM, UPON COMPLETION AND TESTING, SHALL BE INSPECTED <br />AND ACCEPTED BY THE OWNER AND THE AUTHORITY HAVING JURISDICTION. <br />2.15. GUARANTEE <br />3.15.1 ALL EQUIPMENT SHALL BE TESTED, ADJUSTED AND PLACED IN PROPER <br />OPERATING CONDITION BY THE SUBCONTRACTOR. BOTH THE CONTRACTOR AND <br />THE ENGINEER SHALL ADVISE THE ARCHITECT IN WRITING THAT THE SYSTEMS <br />ARE INSTALLED ACCORDING TO THE SPECIFICATIONS AND DRAWINGS AND ARE <br />OPERATING SATISFACTORILY. THE OWNER SHALL RECEIVE WRITTEN WARRANTY <br />COVERING ALL DEFECTS IN WORKMANSHIP AND MATERIAL FOR A PERIOD OF <br />ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE. <br />3.15.2 ALL DEFECTS WITHIN THIS PERIOD SHALL BE REPAIRED WITHOUT COST <br />TO THE OWNER. THIS SHALL INCLUDE ADJUSTMENTS, AND ALL REGULAR AND <br />PREVENTATIVE MAINTENANCE. <br />3.15.3 THE OWNER RESERVES THE RIGHT TO MAKE EMERGENCY REPAIRS AS <br />REQUIRED TO KEEP <br />EQUIPMENT IN OPERATION WITHOUT VOIDING THE CONTRACTOR'S <br />WARRANTY. <br />2.16. FINAL INSPECTION <br />3.16.1 ALL OF THE FOLLOWING ITEMS SHALL BE COMPLETED PRIOR TO FINAL <br />INSPECTIONS. NO EXCEPTIONS WILL BE MADE AND NO FINAL PAYMENT WILL <br />BE MADE UNTIL ALL ITEMS ARE COMPLETED. <br />2.17. CLEANING EQUIPMENT AND PREMISES: <br />3.17.1 THOROUGHLY CLEAN ALL EXPOSED PARTS OF THE APPARATUS AND <br />EQUIPMENT. EXPOSED PARTS WHICH ARE TO BE PAINTED SHALL BE <br />THOROUGHLY CLEANED OF CEMENT, PLASTER, AND OTHER MATERIAL AND ALL <br />OIL AND GREASE SPOTS SHALL BE REMOVED. REPAINT OR TOUCH UP AS <br />REQUIRED TO MAKE LOOK LIKE NEW. SUCH SURFACES SHALL BE CAREFULLY <br />WIPED AND ALL CRACKS AND CORNERS SCRAPED OUT. <br />3.17.2 EXPOSED METAL WORK SHALL BE CAREFULLY BRUSHED DOWN WITH <br />STEEL BRUSHES TO REMOVE RUST AND OTHER SPOTS AND TOUCHED UP <br />WITH PRIMER. <br />2.18. IDENTIFICATION, OPERATING INSTRUCTIONS AND SERVICE MANUAL: <br />3.18.1 PROVIDE A PERMANENT NON -CORROSIVE METALLIC PLACARD INDICATING <br />HYDRAULIC DESIGN AND DEMAND INFORMATION, SECURELY AFFIXED TO RISER, <br />ONE REQUIRED EACH RISER. <br />3.18.2 MANUAL: <br />3.18.2.1 PROVIDE TWO (2) NEATLY BOUND COPIES OF MAINTENANCE AND <br />INSTRUCTIONS BOOK, PARTS LISTS PERTAINING TO ALL EQUIPMENT <br />FURNISHED. SUBMIT TO THE ARCHITECT FOR APPROVAL. <br />3.18.2.2 EACH SECTION SHALL BE INDEXED AND INCLUDE PARTS LISTS, <br />INSTRUCTION BOOKS, SUPPLIERS' PHONE NUMBERS AND ADDRESSES, <br />AND INDIVIDUAL EQUIPMENT GUARANTEES ALL IN SEPARATE SECTIONS. <br />END OF SECTION 21 00 00 <br />N <br />O O <br />Q' N <br />U <br />' <br />Q <br />U <br />� <br />00 <br />0 <br />rn <br />0 <br />r.6 <br />W> <br />M <br />O <br />m Z <br />w W <br />rn; <br />W <br />OOi <br />O <br />U <br />w <br />0 <br />p <br />U <br />VJ <br />F_ <br />W <br />I..L <br />cc� Q <br />G <br />m <br />W w� <br />n I— r- <br />"'� O CM <br />d ,- <br />co O U)M <br />X U_j <br />X <br />w J mZ <br />mag <br />z w <br />Z M <br />w <br />_1 <br />U <br />CV <br />r <br />t <br />♦ <br />VJ <br />Z <br />OC <br />CG <br />G <br />O <br />0 <br />N <br />0 <br />C <br />m <br />Lu M <br />M <br />Q OJ <br />pU- <br />J m <br />L m J <br />Z J� <br />m a >- <br />occn a <br />Of n oo W <br />rn <br />0 <br />N <br />J <br />N <br />J <br />m <br />� <br />U) <br />u� <br />�p <br />J <br />W <br />O <br />rn <br />O <br />o <br />z00 <br />M <br />N <br />U <br />3 <br />C> <br />N <br />w <br />N <br />o <br />z <br />co <br />0 <br />W <br />U <br />co <br />_ <br />� <br />a <br />a <br />o <br />o <br />v <br />«mot razfii>�m, Inc. <br />