Laserfiche WebLink
v <br />4" STUCCO B, <br />Q <br />LEFT ELEVATION <br />SCALE: 1 /4"=1'-0" <br />RIGHT ELEVATION <br />SCALE: 1 /4"=1'-0 <br />PAINT AND FINISH SCHEDULE / KEY <br />PAINT COLOR SCHEME <br />SURFACE TEXTURE / FINISH KEY <br />BODY COLOR <br />TEXTURE <br />FINISH <br />TRIM COLOR <br />SAND <br />FINISH <br />NOTE: WRAP THE SAND FINISH TRIM BAND (WHERE <br />SHOWN AROUND WINDOWS & DOORS) INTO THE JAMB, <br />HEAD & SILL OF THE WINDOW & DOORS. PAINT THE BAND, <br />JAMB, HEAD & SILL THE TRIM COLOR. <br />STUCCO INSTALLATION <br />STUCCO AND PORTLAND CEMENT PLASTER SHALL <br />BE INSTALLED PER THE CURRENT ASTM C926 & C1063 <br />REQUIREMENTS & PROVISIONS OF THE FLORIDA BUILDING CODE <br />STUCCO SHALL NOT BE LESS THAN 3 COATS WHEN APPLIED <br />OVER METAL OR WIRE LATH AND SHALL NOT BE <br />LESS THAN 2 COATS WHEN APPLIED OVER MASONRY <br />CONTROL JOINTS IN 3-COAT STUCCO SHALL BE USED TO <br />DELINEATE STUCCO AREAS NOT GREATER THAN 144 SQ. FT. <br />OR AT A MAXIMUM DISTANCE OF 18' BETWEEN JOINTS <br />PER ASTM C1063 (CURRENT EDITION) <br />WEEP SCREED SHALL BE INSTALLED AT ALL <br />STUCCO TRANSITIONS BETWEEN WOOD AND MASONRY <br />AS REQUIRED BY ASTM C 1063 (CURRENT EDITION) <br />W <br />}_I <br />} <br />>oCQO <br />W 0 H <br />cnUW W <br />Q = _W F- <br />_ F > J <br />U) <br />cc <br />Y 0 I— z <br />LL00C/) <br />z z Z F W <br />rr <br />J Q � J <br />WC__crC_ <br />�2ZOcn <br />�I—az0 <br />n <br />a O N <br />n <br />O � <br />Q <br />Q <br />0 <br />o <br />Vl <br />z <br />o <br />U <br />0 <br />w <br />w <br />0 <br />w <br />A <br />U <br />w <br />U) <br />w <br />0 <br />3: <br />z <br />0 <br />OC <br />N <br />W <br />U) <br />O <br />� <br />lz <br />o <br />wz <br />JAN 1 2022 <br />COMMUNITY; <br />LINKSA' CALUSA <br />SPRINGS <br />PLAN # 6103 <br />RELEASED: 1/18/22 <br />SHEET <br />A2.2 <br />i i I :,tlil Hiu'-All'olY IWY;i WIII' YiY (IYW114Y IIItAu¢::a 41h,hklal,_;:; 1 1 1 1 1 11111i i — I <br />