My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
94-4284
Zephyrhills
>
Building Department
>
Permits
>
1994
>
94-4284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 12:03:17 PM
Creation date
6/2/2006 3:08:08 PM
Metadata
Fields
Template:
Building Department
Permit #
94-4284
Building Department - Name
WHITE AUTO PART
Address
4718 GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ratio .55 maximum. <br />b. Slump Limits: 1. Beams, slabs, columns, footings, piers <br />and walls; 3"-5" 2. Masonry wall fill; 8"-10" <br /> <br />c. Small rock mixes are not allowed for slabs or other <br />wearing surfaces. <br /> <br />5. COVER: <br /> <br />Unless otherwise shown on the drawings the minimum concrete <br />cover for reinforcing shall be as follows: <br /> <br />a. Footings: 3" <br />b. Columns and pedestals: 1 1/2" for #5 and smaller. <br />2 " for others. <br />c. Structural slabs exposed to weather: 1 1/2" top and 3/4" <br />bottom. <br />d. Slab-on-grade: 1 1/2" from top of slab. <br />e. Beams: 1 1/2" for 3% and smaller and 2" for others, <br /> <br />6. SPLICES, HOOKS AND CORNERS: <br /> <br />Unless otherwise shown on drawings: <br /> <br />a. Reinforcing Steel: 40 bar diameters. <br /> <br />Provide standard hooks at the ends of all column and filled <br />cell reinforcing. Provide corner bars for all bars at all <br />corners. <br /> <br />7. FORMS: <br /> <br />Construct formwork for concrete with plywood or other <br />acceptable panel type materials to provide continuous, <br />straight smooth surfaces. Coat forms with a commercial <br />formulation coating compound that will not bond, stain, or <br />adversely affect concrete surfaces or impair subsequent <br />treatments. Design land erect formwork to support all loads. <br />Thoroughly clean and adjust all forms just prior to concrete <br />placement. Use factory prefabricated snap off or removable <br />ties. <br /> <br />o. EXECUTION: <br /> <br />a. Support reinforcement on metal bolsters. Masonry may not <br />be used for supports. <br />b. Formwork supporting concrete beams shall be left in place <br />for at least 14 days and until the concrete has reached <br />it's design strength. <br />c. Consolidate concrete with mechanical vibrat-ing equipment. <br />d. All slab surfaces are to be coated with liquid cure and <br />seal compound unless this would affect finishes to be <br />applied later. In the case of the latter wet cure the <br />slab. Comply with ACI guidelines for acceptable <br />
The URL can be used to link to this page
Your browser does not support the video tag.